1 IEEE m-09/0019r Work Plan for IEEE m Standard & IMT-Advanced Submission
2 Documents to be Developed in TGm TGm will develop the following documents as part of m standardization process: –System Requirements Document (SRD) A set of possible deployment scenarios and applications of the m standard. A set of performance targets and features that m compliantsystems shall meet or exceed. –Evaluation Methodology Document (EMD) A complete set of parameters, models, and methodologies for the link-level and system-level simulations that allow fair evaluation/comparison of various technical proposals. Channels Models: A set of spatial channel model parameters are specified to characterize particular features of MIMO radio channels to be used for simulating technical proposals for the future m standard. –System Description Document (SDD) Architecture and design of the m air interface amendment Captures the core technical concepts behind the features included in the amendment Will enable analysis and/or simulations for characterizing the coarse level performance benefits of the air interface in association with the Evaluation Methodology Document –802.16m amendment – IMT-Advanced Proposal
TGm Timelines IEEE m m Amendment IMT Advanced Proposal System Description System Requirements Evaluation Methodology ITU-R IMT Advanced IMT.TECH IMT.EVAL IMT.RSPEC Circular Letter *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). IEEE ITU-R WP5D Sep ’07* Jan’08* Jan 09* Letter Ballot Sponsor Ballot Mar’10Nov ’08 Nov ’07 Jan ’09 Jun ’08 Oct ’08 Proposal Submission Jan’09 Jun ’08 Proposal Evaluation Develop Recommendation Q2Q3Q4Q1Q2Q3Q Q1Q2Q3Q4 Apr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov Dec Q1Q2Q3Q Oct ’09 Jun ’10 Final Proposal Sept ’09* ITU based potential updates Refinements AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec July ’10 ITU based Updates Amendment Ready for IMT- Adv evaluation July ’09 Working Doc Amendment Feature Complete. EC Conditional Approval for SB. Amendment Ready for Industry Release. RevCom submission EC Conditional Approval for RevCom submission Jan Feb Mar Q Feb ’11JanFebMar Consensus Building & Decision Oct ’10 3