Gulf Petrochemical Industries Co. Turnaround Contractors – Ensuring the safety of our Manpower GPIC Bader Al-Mansoori Planning Superintendent.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Contents Introduction and Background The Objective Recommendations
Safety Committees. Safety Committees EVERY SAFETY COMMITTEE SHALL Be composed of employee and employer representatives and hold regularly scheduled.
MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
© Business Review - Arabian Peninsula January 24, 2010 / Slide 1 ABB Contractors Business Partners John Hartnett May, 2010.
SIEP HSE Management System
Contractor Safety Management
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Training Activity. The recent and significant technological evolution in the field of petroleum industry, has made it possible that many industrial installations.
Joint Operations Prepared & Published Monthly by EH&S, F&S Group JO EHS Bulletin AUG 2010 No. of Recordable Injuries since 2003 Safety Stand Down Day Injury.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Course Material 1.Overview of Process Safety 2.Compliance with Standards 3.Process Hazard Analysis 4.Standard Operating Procedures 5.Safe Work Procedures.
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
WHS Management Plans.
M. Scharfenstein - ES&H Coordinator 8 June 2009
Contract Workforce Safety Management
Safety Management Strategies for Extended Care Facilities.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
OH&S Management System
Risk Assessment – An Essential Standard
1 Borouge reference line 2006 © 2006 Borouge HSE MANAGEMENT OF CONTRACTORS By: Venkatesh Murthy Abu Dhabi Polymers Company LLC (Borouge), Abu Dhabi.
Responsible Care Initiation to Implementation at GPIC
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
Elements of Process Safety Management
Process Safety Management
9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external.
Safety and Health Program Section B of the Forest Activities Code.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
ORC Asia Pacific Safety, Health & Environment Forum Mind of the Customer Presentation ExxonMobil Scott Arvin Asia Pacific Downstream & Chemical SHE Manager.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
Construction HSE Guideline _ 2005
A Strategy for an Effective Accident Prevention Program
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
Safety Stand Down – Together We Will Make the Difference.
Safety in Construction Contracts Presented By: Ramy besaiso Instructor : Eng: Eyad Haddad Chapter 10.
Job Safety Analysis.
Hitting the Leadership Target Through Leadership and Accountability.
Communication of Control Measures. Who do we need to Communicate To Employees Subcontractors Professionals Visitors.
WEEKLY SAFETY MEETING July 15th, IRI 750 OGEC rig N’Giri - 3
Project Specific Safe Work Plan Team Engagement Starts HERE!
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
IIPP An Overview of the Injury and Illness Prevention Program.
CDM Construction Design and Management
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
International Safety Rating System
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Pipeline Safety Management Systems
IMS Implementation Project
OH&S Management System
Managing Safe Work Permits
Safety Accountabilities
OH&S Management System
Risk management - HIRAC awareness presentation
People Responsible For Health and Safety
General Contract Management Structure
General Contract Management Structure
MOC/BBS/JSA/Incident Investigation /SEMS/Permit to Work Training
General Contract Management Structure
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Total Safety Culture Safety Process 5/21/2019
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Gulf Petrochemical Industries Co. Turnaround Contractors – Ensuring the safety of our Manpower GPIC Bader Al-Mansoori Planning Superintendent

GPIC 2 Turnaround Contractors – Introduction  Established in December 1979 over 600,000 Sq.m of reclaimed land  Joint-Venture between NOGA, SABIC & PIC  Utilizes Natural Gas as raw material  Produce: Ammonia, Methanol and Urea  Started production in 1985  Production Capacity : 1,500,000 T/A  Manpower : 572 Employees  95% are Bahrainis

GPIC  A scheduled event wherein the entire process unit of a plant is taken off stream for an extended period of time for revamp and/or replacement.  Over 2932 jobs were planned during the Turnaround  There were 3698 Contractors available at site during the peak daytime shift of the Turnaround.  There were 636 Contractors available on site during the peak night shift of the Turnaround.  The 2012 GPIC turnaround was planned for 26 Days 3 Turnaround Contractors – The Turnaround

GPIC Overall Number of People in the Complex in TA Turnaround Contractors – Number of Contractors

GPIC 5 Turnaround Contractors – Turnaround Management Contractor Selection Trade Testing & kick off meeting Risk Assessments Contractor HSE Inductions InitiationPreparationExecutionFinalisation Resource Monitoring & Control AuditsTA MeetingsTA Reports Conducting Site Audits Daily Contractor HSE Meeting Turnaround HSE Campaign Toolbox Talks Contractor Prequalification Initial Estimate of manpower HSE Strategy Roadmap Performance Evaluations Contractor Review Meetings Lessons Learned / Recommendations Demobilization

Turnaround Contractors – Initiation Phase Turnaround HSE Strategy & Roadmap  Implement all approved HSE suggestions and audit recommendations.  Enhancement of Method Statement.  Communication of hazards and concerns  Procurement of competent certified manpower  HSE Audits during Turnaround  Evaluation of Incidents

GPIC Contractor Prequalification  Qualification of contractors starts 3 months after the completion of the previous turnarounds  HSE Performance  HSE Programs  Tested Contractors are carefully vetted and qualified through GPIC procedures. 7 Turnaround Contractors – Initation Phase

GPIC Contractor Selection  Updated Contractor HSE Performance  Updated Contractor HSE Programs  Technical capabilities Trade Tests  Kick-off meeting  Technical Experience  CVs  Previous Records  Tests 8 Turnaround Contractors – Preparation Phase

GPIC Kick-off Meetings  Kick off meetings are conducted for all contractors  Scope of work clearly defined and agreed.  All foreseeable contingencies are discussed and agreed.  Turnaround Briefings address work timings, HSE procedures and available facilities.  Turnaround permit & Work Rules and Procedures are properly explained and discussed. 9 Turnaround Contractors – Preparation Phase

GPIC Inductions & Briefings  HSE Induction and training is given to every person entering the complex where:  Every Contractor is made aware of all the hazards and activities of GPIC before entering the complex  Responsible personnel are Identified and made available  Emergency Alarms and actions are Clearly Explained  Test is conducted for each person after the training to assure their understanding of our HSE requirements.  Camp visits are made by GPIC personnel when it is not feasible to conduct HSE inductions and training at the complex.  Refresher courses on general and process safety are annually conducted for long term contractors  Safe Locations are clearly marked around the complex  Contractor HSE personnel are inducted and integrated into the GPIC HSE team for contractors supplying more than 20 contractors 10 Turnaround Contractors – Preparation Phase

GPIC The Turnaround Starts  GPIC led Safety campaign for awarding safe behavior  Highly Focused on improving communication of hazards to the contractor workers  Turnaround Audits  Each activity conducted during the turnaround is specifically covered by the permit to work procedure  Continuous follow-up and evaluation of contractors through the concerned supervisors 11 Turnaround Contractors – Execution Phase

GPIC 12 Turnaround Contractors – Execution Phase HSE Audits by AreaStatusRemarks Permit to Work Procedure1006 permits2% Violation Behavior based Safety (BBS)118,566 Observations5% unsafe acts Risk Assessments502 Confined space audits99 Contractor Cabins17 Scaffolding54 Heavy Lifting69 Tool Box Talks38239 Subjects IncidentsRemarks 16 Injuries 101 Near Miss 27 PTW Violations 4 Accidents All Minor Vehicle Accidents

GPIC Statistics and Achievements  Review of all Turnaround HSE Statistics  Contractor Evaluation forms  Turnaround Suggestions 13 Turnaround Contractors – Finalisation Phase Illness Sick Days URTI (Cold/Flu) 164 Other muscular-skeletal problems 21 Back pain 32 Abdomen pain (Ulcer, diarrhea, colic, piles) 14 Lower RTI (Bronchitis) 10 Fatigue (Tiredness work & Non-work related) 2 Work injury 0 Others 9 Ammonia Methanol Urea Utilities No. of PTW Audits – Plant Wise Ammonia Methanol Urea Utilities Cumulative Risk Assessment Audits

Contractor Feedback / Suggestions  Contractor Feedback is religiously sought after the Turnaround  All contractors have submitted their feedback forms in TA 2012  13.5% of all suggestions were HSE Related  43% of all contractors submitted Suggestions for improving future turnarounds 14 Turnaround Contractors – Finalisation Phase GPIC