January 23, 2009. El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
JIM MINER REALTOR®. CRITERIA USED  3-7 ACRES  43,560 SQ FT IN ACRE  GREAT LOCATION  CHEAP PRICE  MEETS CITY ORDINANCE  ANY ZONE  GENERALLY ON A.
Titusville to Edgewater Bike Loop PD&E Study
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
Project Disruptions Summer 2015 Construction Projects Electrical Distribution Projects.
James River – Buchanan, Virginia A very special place.
Twinbrook Sector Plan A New Community in the Technology Corridor
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Georgia Transportation Infrastructure Bank (GTIB) Bert Brantley Deputy Executive Director State Road and Tollway Authority MAY 2013 STATE ROAD AND TOLLWAY.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
Elk Grove – Rancho Cordova – El Dorado Connector Project Elk Grove – Ranch Cordova – El Dorado Connector Joint Powers Authority Project Briefing JPA Board.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
1 RTD TOD Program University of Denver November 2004.
Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant.
Mill Creek Town Center A Proposed Mixed Use Development Mokena, Illinois.
Visionary Businessmen The Borden Plant Property Starkville, Mississippi By: Margaret McMullen Oktibbeha County Leadership Forum May 3, 2007.
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
May 24, 2008PalmRidge Park A Mixed-Use Real Estate Property for Sale in McAllen, TX.
CITY COUNCIL WORKSHOP MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) DECEMBER 20, 2011.
Goods Movement and Traffic Issues In the SACOG Region The Effects of Congestion on Goods Movement in our Region February 9, 2006 Jason Crow.
Neighborhood Commercial on 5601 North Pine Hills Road Small Scale Land Use Amendment Application for.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Villagio at Waterford Lakes Planned Development Alta Development, LLC.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Incentives & Infrastructure  Estimated incentives and Infrastructure cost: $87,000,000  We will have a Development Agreement with Microsoft that will.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
A guide to Darien’s Town Government. MY TOWN – NEW MILFORD.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
*** Data source: KARNES RESEARCH COMPANY 2008 Triangle RETAIL Market Information mainly provided by KARNES RESEARCH via their 2008 Retail market report.
El Dorado Hills Economic & Demographic Information.
Road Update October 19, Lebanon Road (FM 423 to Presidents) START: 1/08 COMPLETE : 7/09.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Site # 2010 – 62 Antioch Pedersen 94 to 134 Acres 2440 Crabtree Lane Northbrook, Illinois Phone: Fax:
Pre-Proposal Meeting January 16, 2008 US 95, Garwood to Sagle, Bonner County, Sagle KN US 95, SH-53 to Ohio Match Road, Kootenai County KN
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Finding my home from the air A series of maps getting closer and closer From Gareth in Hillam.
Financing Options I. Bond Issues 1. General Obligation 2. Leasehold Revenue 3. Certificates of Participation (COPs) II. State DNR SRF/Grant Program Revenue.
Parking Analysis Storrs Center newurbanconnections.com CE 2710 January 2016 Instructor Dr. Norman Garrick Tutorial Instructor: Hamed Ahangari 28 Jan
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
1 Office of Economic Development Budget Economic Development Housing Redevelopment Central Parking.
Downtown Action Team Progress Report October 5, 2004 Steve Pinkerton Director of Housing & Redevelopment.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
planning and zoning committee presentation September 19, 2016
Site # /- Acres Wauconda, Illinois
Council for Quality Growth North Fulton Advisory Meeting
Regional Roads Committee
TVTC Impact Fee Update Nexus Study January 30, 2008
CFT Gateway Center ( E. Foothill Blvd
City of Rifle 2007: Potential Growth.
UTILITY DESIGN SERVICES
Board of Trustees Meeting
Office Space Available
STATE SUEE AND ONE WAY CORRIDORS
PAD Proposal.
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
WEST HALF OF LOT B CONCESSION 1 MARY C. JOYCE-SMITH, MCIP RPP
Presentation transcript:

January 23, 2009

El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville Business Park (D4) 5. Town Center West (D5)

El Dorado County Development Projects Carson Creek Development (D1) 1700 housing units; 40,000 square feet of Commercial; 450,000 square feet of Research and Development; and 780,000 square feet of Industrial uses Main accesses on White Rock Road and Latrobe Road Currently 1/3 of this project is builtout. The BOS has recently approved the next phase of 304 homes.

El Dorado County Development Projects Blackstone/Valley View Subdivision (D2) 2037 acre site within El Dorado Hills Community Region homes planned Located east of Latrobe Road and just south of Town Center commercial area While rough grading is nearing completion, construction of homes has only just begun.

El Dorado County Development Projects El Dorado Hills Business Park (D3) 900 acre development located south of Whiterock and Latrobe Road The development is approximately 1/3 complete. The County currently has four projects processing for this area totaling 1,600,000 square feet

El Dorado County Development Projects Clarksville Business Park (D4) 10 commercial buildings totaling 99,000 square feet Located at the Silva Valley Interchange and White Rock Road The BOS recently approved this project

El Dorado Hills Development Projects Town Center West (D5) Anticipate 500,000 square feet of office space located off Latrobe Road and north of White Rock Road Rough grading is being processed on the site.

El Dorado County CIP Projects Completed/In construction Latrobe Road Widening - Suncast Lane to Golden Foothill Parkway (2 to 4 lanes) (C1) Latrobe Road widening - White Rock Rd to Suncast Lane (2 to 4 lanes) (C2) White Rock Rd Realignment – Manchester Dr to Latrobe Road (2 to 4 lanes) (C3) White Rock Rd improvements – Manchester Dr to Sac County line (C4) Latrobe Rd widening –US 50 to White Rock Rd (4 to 6 lanes) (C5)

El Dorado County Future CIP Projects White Rock Rd/Post Street Signal (F1) White Rock Rd Widening – Latrobe to Silva Valley Interchange (2 to 4 lanes) (F2) ● White Rock Rd Widening – Latrobe to Silva Valley Interchange (4 to 6 lanes) (F3) White Rock Rd widening – Manchester Dr to Sac County line (2 to 4 lanes) (F4) Latrobe Rd/White Rock Rd Connector (F5)

El Dorado County Future CIP Projects White Rock Rd/Windfield Way Signal (F6) Latrobe Rd widening – Golden Foothill Parkway to Investment Blvd(2 to 4 lanes) F7 Silva Valley/Golden Eagle Lane Signal (F8) US 50/Silva Valley Parkway Interchange Phase I (Country Club Realignment) ((F9) US 50/Silva Valley Parkway Interchange Phase II (F10)