Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Disruptions Summer 2015 Construction Projects Electrical Distribution Projects.

Similar presentations


Presentation on theme: "Project Disruptions Summer 2015 Construction Projects Electrical Distribution Projects."— Presentation transcript:

1 Project Disruptions Summer 2015 Construction Projects Electrical Distribution Projects

2 Construction Disruptions Summer 2015 Construction Project Disruptions 1- Riggs Soccer Field 5- Cooper North Paver Renovation 9- Brooks Center Roof Replacement 2- Parkway Dr. 6- Centennial Blvd. / SC 93 Sink Hole Repair 10- Fluor Daniel Roof Replacement 3- West Campus Satellite Parking Lot 7- Signal Light Repair Cherry Rd. / McMillan Rd. 11- Printer Site Preparation Demo Bld. 4- Hardin/Brackett Hall ADA Modifications 8- East Campus Satellite Parking Lot NW NE SW SE 3 6 1 2 4 57 8 N 9 10 11

3 Construction Project Disruptions 1- Riggs Soccer Field 3- West Campus Satellite Parking Lot 4- Hardin/Brackett Hall ADA Modifications 6- Centennial Blvd. / SC 93 Sink Hole Repair 11- Printer Site Preparation Demo Bld. 1 4 6 3 N 11

4 Construction Project Disruptions 2- Parkway Dr. 8- East Campus Satellite Parking Lot 8 2 N

5 Construction Project Disruptions 5- Cooper North Paver Renovation 9- Brooks Center Roof Replacement 10- Fluor Daniel Roof Replacement 5 N 9 10

6 Construction Project Disruptions 7- Signal Light Repair Cherry Rd. / McMillan Rd. 7 N

7 Electrical Distribution Project Disruptions 1- Bowman Field/Calhoun Dr./ Fernow St. 4 - E-04 Parking Lot to Fort Hill St. 2- Intersection of Fernow St. to West South Palmetto Dr. near Earle Hall 5- Klugh Ave / North of UF / East on Alpha Beta Cir. 3- South Palmetto Dr. to East of Lowry and West of STI and Alpha Beta to Union Dr. 1 4 2 3 5 N

8 Electrical Distribution Project Disruptions 1- Bowman Field/Calhoun Dr./Fernow St. N

9 Electrical Distribution Project Disruptions 2- Intersection of Fernow St. to West South Palmetto Dr. near Earle Hall 3- South Palmetto Dr. to East of Lowry and West of STI N

10 Electrical Distribution Project Disruptions 4- E-04 Parking Lot to Fort Hill St. 5- Klugh Ave / North of UF / East on Alpha Beta Cir. and Alpha Beta to Union Dr. N

11

12 Edited by Bob Wells


Download ppt "Project Disruptions Summer 2015 Construction Projects Electrical Distribution Projects."

Similar presentations


Ads by Google