DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, 11-12 June 2008 Daniel.

Slides:



Advertisements
Similar presentations
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
Advertisements

Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Johann Zmeskal, Stefan Meyer Institute for subatomic Physics Vienna, Austria INPC 2010, Vancouver JointGEM Project Status Report 3 rd JointGEM Meeting.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Towards the ‘final’ JRA1 DAQ Daniel Haas DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
S.Stapnes1 European Detector R&D and FP7 - background  Two CN (Construction of New Infrastructures – support for preparatory phase – including some detector.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
S.Stapnes1 European Detector R&D and FP7 - Outline  Background –New call for IAs (Integrated Activities) in November – it is in fact expected tomorrow.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
RECFA September Kenneth Österberg, University of Helsinki Experimental e + e - physics – LEP&LC DELPHI Major finnish LEP contribution analysis.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
FP7 – DEVDET Proposal EUVIF: the vertical integration facility Ingrid-Maria Gregor, DESY ILC Vertex Workshop ILC Vertex Workshop April 2008 Villa.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
EUDET FP7 brainstorm EUDET-JRA2 Jan Timmermans. My personal opinion…. I would be in favour of waiting till next call Because “grand” particle physics.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
DevDet Project Summary Francesco Forti, INFN and University, Pisa SuperB Detector R&D Workshop SLAC, February 14-16, 2008.
5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
Charles University Prague Institute of Particle and Nuclear Physics Zdeněk Doležal, Peter Kodyš, et al.
S.Stapnes 1 European Detector R&D and FP7 - Outline Background –Some quick reminders DevDet submitted for Integrated Activity FP7 call –Overview –Some.
14.4. Readout systems for innovative calorimeters
SiD R&D Plan and Opportunities for New Collaborators
Final CALICE OsC meeting: Status and summary of project
Thomas Schoerner-Sadenius DESY Hamburg, Germany
Test Beam Request for the Semi-Digital Hadronic Calorimeter
PANDA Muon Group Meeting, Protvino 7 June 2011 G
The European Strategy for Particle Physics
CERN R&D plans and Infrastructures
European Detector R&D and FP7 - Outline
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
TK Upgrade report.
EU Institution Board 1 representative of each participating institute
CLIC Detector CERN Status + plans
Presentation transcript:

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel Haas DPNC Genève

RECFA and the FP7 program IAs: Integrating Activities (ex I3) The DevDET proposal EUVIF - European Vertical Integration Facility –General Idea –Key Workpackages –Some Tasks and their proposed implementations Final Remarks DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 2 Outline

A Detector R&D planning group for FP7 – set up by RECFA in Sep 2007 (lead by N. McCubbin and S. Stapnes) –members from LC, LHC, neutrinos, flavour factories, ESGARD, CERN and DESY –To coordinate the IA applications to maximise the chances –Aim for a small number (one) good proposal(s) allowing the European community to be correctly represented in them –Follow the example of ESGARD for accelerator R&D coordination DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 3 RECFA and the FP7

What are IAs (Integrating Activities)? –… provide a wider and more efficient access to and use of, the existing research infrastructures… –Integrating Activities also aim to structure better and integrate, on a European scale, the way research infrastructures operate Already used successfully in FP6 –EUDET: ILC Detector R&D network –CARE: accelerator R&D BUT a rigid structure: Need to include 3 different kinds of workpackages: –Networking – foster collaboration –Transnational access – allow access to facilities –Joint Research Activities – develop the facilities DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 4 Integrating Activities

Integrating Activity with 3 main objectives essential to European development of detectors for particle physics research: creation and improvement of key infrastructures required for the development of detectors for future particle physics experiments provision of trans-national access for European researchers to access these research infrastructures, integrating the European detector development communities planning future physics experiments, and increasing the collaborative efforts and scientific exchange between them. 87 institues from 21 different countries: –Bulgaria (2 institutes), Czech Republic (4 institutes), France (11 inst.) Germany (13 inst.), Greece (2 inst.), Israel (3 inst.), Italy (12 inst.), The Netherlands, (1 nat. lab.), Poland (4 inst.), Spain (6 inst.), Sweden (2 inst.) Switzerland (5 inst.) Request from EU: 11M€. Total budget: about 37.8M€ Duration: 4 years DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 5 DevDET Proposal

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 6 European Detector R&D European priority projects TimescalesCurrent PhaseKey R&D issues DevDet Work Packages SLHC = Upgrade of LHC detectors for increased luminosity in 2016 Technical Design Reports (TDR) in 2011 Wide R&D focusing on key technology developments; irradiation and test beam measurements Electronics, simulations/softwar e, irradiation and test beam measurements WP2, WP3, WP6, WP8, WP9, WP11 Linear Collider Detectors for next large international accelerator project Letter of Intent 2009, then towards TDR System studies in test beam, individual tests ongoing (EUDET) Simulations/softwar e, integration, system tests in beams WP2, WP3, WP4, WP6, WP7, WP8, WP10, WP11 Neutrino Detector Studies for future Neutrino Facilities Conceptual Design Report to be concluded in 2012 Design studies ongoing, test beam studies next step Simulation/software, integration, test beam measurement at low energy WP2, WP3, WP5, WP6, WP11 Flavour Physics Detectors at SuperB Factories Conceptual Design Report in 2007, Technical Design Report next Design studies, test beam measurements next step Simulation/software, test beams with low energy and high intensity WP2, WP3, WP6, WP8, WP11

The next logical step for ILC: assess system aspects of the proposed detector concepts. The principle integrating factor in linear collider event reconstruction is the concept of “energy flow”: reconstructed objects from different detectors are combined into physics objects such as leptons, photons, or jets. Established how to form these particle-flow objects, mechanical integration, DAQ. Requires the definition of interfaces and their implementation. DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 7 EUVIF - European Vertical Integration Facility

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 8

Linked to existing ILC community

Networking Infrastructure):WP4: Project Office for Linear Collider detectors ( Networking Infrastructure): –manage and operate the infrastructure built up through WP10 –develop and make available more generally tools for the management of distributed detector development projects –Task 1: Project Office Tools Documentation of information and standardisation of tool, interfaces etc. –Task 2: Coordination of Linear Collider Activities Coordination of the Vertical Integration Facility EUVIF Application of tools to CLIC forward region integration –Task 3: Common DAQ and detector controls for integrated tests common DAQ, event building facility, detector control and monitoring, interface to the common DAQ etc. DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 10 EUVIF - Key Workpackages...

(ex Joint Research Activities):WP10: Testbeam infrastructure for fully integrated detector tests (ex Joint Research Activities): –Task 1: Beam line set-up and generic infrastructure –Task 2: Tracking infrastructure 2.1: Vertex detector infrastructure 2.2: Intermediate tracker infrastructure 2.3: Improvement of infrastructure for gaseous tracking detectors –Task 3: Calorimeter prototype infrastructures 3.1: Infrastructure for electromagnetic calorimeters 3.2: Infrastructure for hadron calorimeters 3.3: Infrastructure for forward calorimetry –Task 4: Infrastructures for qualification of silicon sensors DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 11...EUVIF - Key Workpackages

EUVIF will be located at CERN SPS, one dedicated beam line would be set up for this Supply beam line with adequate magnets necessary for the vertical infrastructure: –Dipole magnet for the tracking infrastructure and dipole magnet for calorimeter infrastructure Equip beam line area with gas supplies, electrical and network cables DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 12 Task 1: Beam line setup etc...

2.1: Vertex detector infrastructure –Building a global mechanical infrastructure to host multi- layer modules for vertex detectors in different technologies –Developing the data acquisition system including hardware from EUDET to suit the new infrastructure –Producing a target system to create jet-like structures –Integrating the EUDET telescope upstream of the target DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 13 Task 2: Tracking infrastructure... e-e-e-e- EUDETtelescope target vertexslice

2.2: Intermediate tracker infrastructure –Lightweight structures for both module carrier and overall support –Prototype silicon modules with minimized material consumption –Overall support structure for modules/ladders arranged in layers –Improving the existing EUDET readout chip and developing a front- end hybrid prototype suitable for testing silicon sensors with conventional (wire-bonding) or novel (bump-bonding) techniques –Integration of the front-end electronics developed in EUDET into the central DAQ system (see WP4) 2.3: Improvement of infrastructure for gaseous tracking detectors –Providing the EUDET TPC infrastructures for combined tests of the particle flow concept –Develop and provide readout software –Integration into DAQ and slow-control system DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 14...Task 2: Tracking infrastructure

3.1: Infrastructure for electromagnetic calorimeters –Develop facility for mechanical and system integration –Develop facility for optimization and test of silicon readout sensors –Develop facility for the test and characterization of readout systems 3.2: Infrastructure for hadron calorimeters –Develop facility for mechanical and system integration –Develop facility for the optimization of SiPM micro-structures and on-wafer sensor tests –Develop facility for the characterization of packaged sensors and integrated scintillator systems –Develop facility for the test and characterization of readout and calibration systems 3.3: Infrastructure for forward calorimetry –Design and prototyping of a flexible tungsten absorber structure for beam tests including a laser position monitoring –Development of a prototype of a multi-channel readout system including fully instrumented sensor planes, FE ASICS and high throughput transmission lines to link the FE electronics to the common DAQ DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP GENEVA, JUNE 2008 Page 15 Task 3: Calorimeter prototype infrastructure

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE DANIEL HAAS, CHIPP WORKSHOP ZÜRICH, SEP 2006 Page 16 Final Remarks Proposal was submitted February 29 th to the EC Outcome to be expected for this summer. Start of DevDET January 1 st 2009, EUVIF January 1 st 2010 (no overlap with EUDET allowed) 11 MEUR sounds a lot, but distributed on 87 institutes incl person months gives very small amounts for each group –E.g each institute participating in the vertex infrastructure of EUVIF -<0.25FTE per year Did it anyway: –Within EUDET collaboration building effect was very positive –Want to continue this way! Will keep European ILC community alive with this support and commitment!