Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS Tel Aviv, 21-24th May 2010 Partner’s Presentation – EBIC Director General Ing.

Slides:



Advertisements
Similar presentations
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Advertisements

I NNO M OL ENHANCEMENT OF THE INNOVATION POTENTIAL IN SEE THROUGH NEW MOLECULAR SOLUTIONS IN RESEARCH AND DEVELOPMENT.
“ FIRST STEP TO FIRST JOB – Innovative methods leading YOUTH to a solid career” VS/2012/0017 – VP/2011/010/0563 Kick-off meeting, 20 February 2013, Bucharest,
ERRIN regions tasks. ERRIN regions involved (10) Eszak-Alfold (HU) Lodz (PL) South Moravia (CZ) Basilicata (IT) Örebro (S) Murcia (ES) Slovenia (SI) Northern.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
FP6 Thematic Priority 2: Information Society Technologies Dr. Neil T. M. Hamilton Executive Director.
ΑΝΝΕΧ 11-A by SCIRO. WP7 Dissemination and Implementation The objectives are the following: to build consensus around F-MAN To set-up the basis for further.
EJP CONCERT Where are we now?
Tools for international cooperation in the field of science and technology Iulia Mihail Director Department of European Integration and International Cooperation.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
Conference on the European Union Startegy for the Danue Region: transport, energy and environmental issues Vienna and Bratislava, April, 2010 Dr.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
©M. Horvat, BIT, AT - Nr. 1 How to participate in the 6th EU Framework Programme Manfred Horvat BIT - Bureau for International Research and Technology.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
NaturNet Plus Computer Assisted Education for Environment Protection Tomáš Mildorf.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
Transport ROAD SAFETY: Towards a European Road Safety Area: Policy orientations on road safety
Using land use to make transport more sustainable PREPARATION AND SUBMISSION OF PROPOSAL.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Title: Climate change impacts on Arctic economy and society Acronym: CLIMARES Coordinator: Ola M. Johannessen, Deputy Coordinator: Stein Sandven Project.
1 WE-Mentor preparatory meeting Stuttgart 12/2006 WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey WELCOME to the.
Information Society Technologies (IST) Programme 5th EU RTD Framework Programme.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
EPOCA – 13. June EPOCAConsortium Agreement (CA)
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP6 IST Call 4 SO eSafety – Co-operative Systems for Road Transport European Commission - DG Information Society and Media Unit C.5: ICT for Transport.
7 th Framework Programme: KNOWBRIDGE project The Cross Border Knowledge Bridge in the Renewable Energy Sources Cluster in the East Slovakia and North Hungary.
GTZ | Tim Mahler| Project Management Project Management.
WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey WP 3 – Implementation of WE activities in the mentee regions 
1 Framework Programme 7 The Work Breakdown. 2 CONTENT  Work distribution across the consortium  Work breakdown into WPs and Tasks.
Rafael Rodríguez Clemente. Coordinator* *Estación Biológica de Doñana, CSIC. Sevilla (Spain) MoCo Meeting, Casablanca (Morocco)
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
© Services GmbH Proposal writing: Part B 2/1/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
Project monitoring Official visit of the Grant Agency on Strengths of the project: professional results, progress compliance with work plan.
1 - Genias and Contrail - WP14 Communication and Dissemination Ad Emmen, Genias Benelux bv contrail is co-funded by the EC 7th Framework Programme under.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
Use of resources and EC funding in year 2 EuCARD Governing Board meeting , CNRS, Paris Overview of EuCARD WPs and budget Use of resources by.
EUROPEAN RESEARCH AND INNOVATION OFFICE 4 th FLUTCORE Progress Meeting September 23 rd 2015 – London WP9 - Project Management Amelie Guisseau UCL European.
Practical Aspects of Preparation FP 6 projects Senter/EG-Liaison Nationaal Contact Punt voor het 6de Kaderprogramma Sandra de Wild 11 december 2002.
Naples - November 30, 2007 Full Virtuality in Aircraft Development Processes Emanuela Flora Technapoli Consortium
“Preparing competitive grant proposals that match policy objectives - project proposal evaluators' viewpoint ” Despina Sanoudou, PhD FACMG Assistant Professor.
MATcHES “Roles and responsibilities of the project partners” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Kingston Maurward College Dorchester 5 May 2006 WAgriCo - UK Project Launch.
Fostering cooperation among the science and industry in Jelgava and Siauliai (LLIII-160) Liene Rulle Project manager Jelgava City Council.
ASSTAR Overview Jean-Marc Loscos, DSNA
WBC Steering Platform on Research
IP Awareness and Enforcement: Modular Based Actions for SMEs
International Co-operation Concrete opportunities
MENTOR Blue Career Centre of Eastern Mediterranean and Black Sea
Danube-INCO.NET Advancing Research and Innovation in the Danube Region
ASSTAR Project Overview & User Forum Objectives
Cities speeding up the integration of hydrogen buses in public fleets
Civil Protection Financial Instrument – Prevention Projects
ESSnet on Linked Open Statistics
Risk Management for Large Scale Infrastructures in the Romanian Bulgarian cross border area Project Code
BEWAG - General Assembly 2016 – Brussels
MENTOR Blue Career Centre of Eastern Mediterranean and Black Sea
20th February, 2018 Kiev, Ukraine Rainer Janssen, Cosette Khawaja
Info Day on New Calls and Partner Café
Presentation transcript:

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS Tel Aviv, 21-24th May 2010 Partner’s Presentation – EBIC Director General Ing. Simion Dascalu Hotel Victoria, Piteti Joi, 31 mai 2012 PROJECT FINALIZED INOVARE DURABILA Eveniment regional pentru promovarea activităţii de inovare şi transfer tehnologic, Regiunea Sud Muntenia

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED Project period: – Budget EBIC RO: Euro – the EC Contribution: Euro

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS Participation in the project Project Partner EBIC WPs : WP1 – Project Management WP5 – C & C Subsystem Design, Implementation, Integration and Test WP7 – System Integration and Testing WP10 – Dissemination & Exploitation Tasks : Task 1.1 General Project Management (WP1) Task 5.3 UGV OCU Software (WP5) Task 5.8 UGV Simulator Software (WP5) Task 7.4 System Acceptance Test Procedure (WP7) Task 10.2 Exploitation progress monitoring and final plan (WP10) ACTIVITY TYPEPMs RTD/Innovation activities 29 Demonstration activities 0 Consortium management activities 2 Dissemination & exploitation 1 EBICPMs WP1 2 WP2 0 WP3 0 WP4 0 WP5 28 WP6 0 WP7 1 WP8 0 WP9 0 WP10 1 TOTAL32

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT FINALIZED

Transportable Autonomous patrol for Land bOrder Surveillance system – TALOS FP7 PROJECT CONSORTIUM

THANK YOU EUROPEAN BUSINESS INNOVATION & RESEARCH CENTER S.A. Str. Erou Iancu Nicolae, nr. 126A, Etaj 5, CTT-Baneasa Bucuresti, Romania, Tel: