FP7 Design study proposal Michele Punturo Harald Lueck.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Michele Punturo on behalf of the ET team GA # A short introduction to the project.
Michele Punturo European Gravitational Observatory and INFN-Perugia On behalf of the GW ILIAS-next community Gravitational Wave Network.
Project Proposals Under FPx CECRA: answering INCO-2005-C-WBC/SSA-3 Malcolm Watson, MChem. Section for Chemical Technology and Environmental Protection.
Project FP7-PEOPLE-IRSES: ASK no
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Effective proposal writing Session I. Potential funding sources Government agencies (e.g. European Union Framework Program, U.S. National Science Foundation,
Developing an FP6 Proposal and How We Can Help METU - Office of EU Affairs.
Towards a Design Study Proposal for a 3rd Generation Interferometric Gravitational- wave Detector Harald Lück London, October 26th 2006.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
1 Framework Programme 7 Guide for Applicants
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Negotiations Maria Habicht Estonian Research Council January 30, 2013 Chisinau.
TG Projects status Nikos Houssos euroCRIS Board meeting Prague, 06 June 2012.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Paris, November 5th, ILIAS/N5: The GW antenna network Raffaele Flaminio EGO and LAPP/CNRS Summary - History - GWA Objectives & Contents - Management.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
E.T. Design Study Harald Lück. 3 main noise sources Thermal Noise Seismic Shot Noise.
E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.
Rhona Sharpe, Head of OCSLD Liz Turner, Head of APQO 11 th April 2013 CHAIRING VALIDATION PANELS.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Culture Programme Basic aim:  encourage and support cultural cooperation within Europe in order to bring the European common cultural heritage.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
MEMBERSHIP AND IDENTITY Active server pages (ASP.NET) 1 Chapter-4.
Atlantic Innovation Fund Round VIII February 5, 2008.
Technical Proposals Written in order to expedite job-related processes: Significant operational improvements New business Additional jobs Safer working.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Fundamental Physics, Astrophysics and Cosmology with ET p1 Michele Punturo on behalf of the ET team GA # A short introduction to the project.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
STREGA & ET - 4th ILIAS-GW general meeting 1 STREGA legacy for ET Michele Punturo INFN Perugia.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Application guidelines, Forms and evaluation criteria CBO Window Fannie Nthakomwa December 2015.
Proposal Writing. # 1:The title Choose a title that conveys information about your project. Avoid acronyms that have negative connotations. Make it Brief.
CENTRAL EUROPE PROGRAMME Workshop B Preparation of an application: FOCUS ON BUDGET Project development seminar Prague, 2 nd February 2010 Luca.
Michele Punturo INFN Perugia and EGO 11st ELiTES meeting.
Michele Punturo INFN Perugia and EGO 1 3rd ET annual workshop - Budapest 23-24/11/2010.
Toward ET ? Michele Punturo INFN and EGO 1ET: EU framework.
Harald Lück AEI Hannover. Thank you Science Team! You did a great job!
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Lessons to be learned from the ET design study Michele Punturo INFN Perugia ET-0005A-16 Dawn Meeting
Preparation of the Self-Study and Documentation
BENCH-CAN Internal evaluation 2nd semester
Physics Analysis Summaries towards a proposal
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
ILIAS WP3 activities report and ET organization
SKADS Controller’s Meeting Timeline Annual Financial Report
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
NEF Negotiation forms IT tool to support Negotiation (Participant Portal) Call FP7-ENV-2013-WATER-INNO-DEMO.
The views of Virgo collaboration groups on upgraded/advanced Virgo
WP 1 Management and Coordination
Presentation transcript:

FP7 Design study proposal Michele Punturo Harald Lueck

2 Previous history This is our second attempt, in our recent history, to present a design study to the EU –In the FP6 we submitted the EGO DS proposal (unsuccessful) and the N5+JRA3 (STREGA) activities (successful) –The network activity permits to be here and inside N5 the WG3 (devoted to the future developments) has been appointed to realize the FP7-DS proposal –We sent around the draft of the proposal to have a feedback about the agreement on the philosophy we are implementing

3 EU calls plan First point: –It is necessary to understand the importance of catching this opportunity NOW, otherwise the next time window will be in 2010

4 FP7 Call The amount of money available is almost ridiculous: –29M€ for all the disciplines for all the Europe –The size of a project should be of the order of 3M€, but this is not the main subject of this meeting –The success probability follows the rare events statistics

5 Proposal timeline

6 Meeting aim The aim of this meeting is: –Confirm and elaborate the philosophy of the project we defined –Set-up the team that must converge to a proposal within the specified time We need four coordinators (= four WPs) that must write the WP content in a coordinated way in the WG3 group We need a contact person for each institution that will appear in the project –This contact person must react and solve all the bureaucratic problems –Find a name for the proposal and identify a project coordinator (EB session?)

7 Proposal Philosophy Conceptual design of a 3 rd generation GW detector Any technological demonstration must be realized in activities parallel (but external) to the project –This is also foreseen in the new FP7 call Minimize the deliverables related to experimental activities –Result of the project must be the realization of a series of reports that are collected in a conceptual design –The most detailed result is the definition of the infrastructure needed for the 3rd generation GW detector »This requires the “a posteriori” selection of the detector topology and geometry

8 … Proposal Philosophy Hence, the main target for the money should be: –Few fellowships devoted to the project –Travel expenses for the coordination of the activities –Project administration

9 Project description Duration: –DS projects can have a duration between 24 and 60 months –Piling up the different activities we arrived to a duration of 40 months, still compatible with the possibility to apply to the next step in the FP7 framework Structure –The project is organized in 4 technical working packages and 1 administration WP Tasks have been inserted in these WPs, but the role of the writers will be to complete this operation

10 WP1 – site identification The WP1 must define the infrastructures needed for a 3rd generation GW detector –Obviously it is interconnected with all the other WP –The first answer asked to the WP1 is the “site level”: Underground or not? Obviously the answer can arrive only by analyzing the seismic+newtonian+control noise requirements

11 WP2 – suspension requirements definition Definition of the requirements that a suspension must satisfy to be compliant with a 3rd generation detector –Thermal noise requirements Test masses and suspension itself –Thermal conduction requirements –Seismic filtering properties –Cryogenic suspension conceptual design

12 WP3-topology identification Current and future technologies investigation Detector topology modeling Detector geometry modeling –Main information supplier of the WP1 and WP2

13 WP4 – Astrophysics requirements Must define the detection capabilities of a 3 rd generation detector –What means to make GW astronomy? –Where it is better to tune the detector sensitivity Large bandwidth or tuned detector? It supplies the info to all the other WPs –Also computation requirements must be addressed

14 WP5 - Management Define the review periodicity –Verify the accomplishment of the objectives Summarize the results and organize the final report to the institutions Project Coordinator WP1 coordinator Task responsible WP2 coordinator WPn coordinator Administration secretary

15 Coordinators-Writers selection We need to select now the writers –Duties of the writers complete the project structure filling the tables 1.3c of the project Identify the milestones and fill the table 1.3e Collect the contribution offers from the institution, select the right balance, identify the real man power contribution that each institution can give and fill the table 1.3d The weakness of the FP6 proposal has been the lack of homogeneity of the project We must avoid it –All the outcomes of the activities of the writers must be agreed with the proposal coordinator(s) in order to have an unique scenario Names?

16 Project coordinator It must interface the consortium with the EU It must do the real coordination job It must follow the design activity of the different WP It is both a Scientific and Administrative coordinator –In the last activity it is supported by a secretary Names (EB decision?)

17 Contact persons Decide the contact person for each institution –They must solve all the bureaucratic problems –They must fill the section 2.2 of the document Names?

18 Consortium structure We must describe the consortium structure At least three institutions of different European countries must participate at the proposal Two possibilities for budget sharing –Centralized management More homogeneous project handling Difficulties in attributing the fellowships to the different institutions –“A priori” money subdivision Easier use of the money (fellowships) Because of the restricted amount of money available it will be really difficult to make “everybody happy” Honestly I prefer the first solution

19 Time line End of February –Declare to the EU our “intention” to submit a proposal Name of the proposal, Coordinator, institutions Middle March –Circulate a second version (completely filled) of the proposal –Ready for the end of March APPEC meeting Beginning of April –Pass through the GEO-VIRGO executive boards Middle April –To have a final version, ready for the last reading End of April –Proposal submission

20 Evaluation Criteria

21 Maximum Reimbursement rate