European GNSS Evolution Programme

Slides:



Advertisements
Similar presentations
Proddage Generic Material
Advertisements

G alileo T est R ange 21 March 2007, Rome Raniero Pasquali Telespazio SpA.
GALILEO and EGNOS Fotis Karamitsos, European Commission
ESA Iris Programme workplan of activities
1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
EGNOS Evolution Program Update D
Galileo System Overview
Galileo Europe’s Satellite Navigation System Professor Terry Moore.
FIX_8 (High Accuracy Positioning using EGNOS and Galileo Products) Galileo SME Workshop 5 th & 6 th April 2006.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
GALILEO INTERIM SUPPORT STRUCTURE EUROPEAN COMMISSION International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9.
Container Management in the Port of Antwerp using EGNOS
1 AAU-Cubesat ”Educational Benefits from the AAU-Cubesat student satellite project” by Student Ms. C. E.E. Lars Alminde, Aalborg university Denmark.
Refinement of maritime users needs, Brussels December 18, 2002 The Galileo support to the Search and Rescue Programme (SAR/Galileo)
Pg 1 of 12 AGI GPS Signal Simulation & Visualization Oct 11, 2005 Curtis Hay Spirent Federal Systems.
U.S. Space-Based Positioning, Navigation, and Timing Policy and Program Update The Third Annual European Defence Geospatial Intelligence Conference (DGI.
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
Modernization and GPS III Southern California Section ION Meeting 11 March 2009 Lt Col David Goldstein, US Air Force Chief Engineer GPS Wing This briefing.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Activities proposed for procurement (EGEP-1st Batch ) 1.RIMS V3 Prototype Development 2.Galileo 2G Phase A/B Satellite Studies 3.Electrical Propulsion.
Extending GPS and Galileo interoperability: from frequency/signals to integrity Francisco Salabert Head of GNSS Policy Office DDAS/ EUROCONTROL.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
Navigation solutions powered by Europe 1 WORKSHOP: European GNSS Applications in H2020 Introduction Christoph Kautz Prague, 4 February 2014 Navigation.
UK Space Agency Saleh Ahmed Assistant Director, UK Space Agency
GLONASS Government Policy, Status and Modernization
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Galileo: programme status and research activities
ESA Technology Programmes Workshop on Space Technology Management and Innovation German Space Technology Strategy – Management of Innovation Process Uwe.
GPS Modernization 14 March 2005 CGSIC IISC Europe.
FAA GNSS Evolutionary Architecture Study
ESA/ESTEC, TEC-QQS August 8, 2005 SAS_05_ESA SW PA R&D_Winzer,Prades Slide 1 Software Product Assurance (PA) R&D Road mapping Activities ESA/ESTEC TEC-QQS.
Boeing Space & Intelligence Systems Non-ITAR Data 1 GPS IIF Program Update National Space-Based PNT Advisory Board Presented by Mr. Ken Torok V.P. Navigation.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
European GNSS Supervisory Authority Galileo: Application domains and research activities Stefano Scarda European GNSS Supervisory Authority.
GALILEO The European Programme for Global Satellite Navigation Services GALILEO 03/2004 EUROPEAN COMMISSION.
Observational Platforms Vito Vitale, Lars-Otto Reiersen, Jan René Larsen SAON Board Meeting, 29 April 2013, Vancouver, Canada,
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
U.S. Space-Based Positioning, Navigation, and Timing Policy and Program Update Briefing to the International Committee on Global Navigation Satellite Systems.
1 Galileo Research and Development Activities GALILEO GALILEO 6 th Framework Programme Aeronautics & Space November 2003.
National Space-Based PNT Coordination Office Global Positioning System: A Policy and Modernization Review United Nations International Committee on GNSS.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
ESA’s GSTB Programme GSTB-V1 is a ground system to test Galileo’s key algorithms using GPS data GSTB-V2 consists of a pair of satellites: –GSTB-V2/A (SSTL)
2nd European Space Weather Week Nov 2005, ESTEC1/5 SEIS: The INTEGRAL Experience F. Di Marco – INTEGRAL FCT- VEGA IT GmbH, Germany A. Baumgartner – SOLENIX.
ProDDAGE Programme for the Development and Demonstration of Applications for GALILEO and EGNOS GALILEO.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
GPS Status and Modernization Munich Satellite Navigation Summit Munich, Germany 3 March 2009 Colonel David Buckman, US Air Force PNT Command Lead Air Force.
Possibilities for joint procurement of commercial cloud services for WLCG WLCG Overview Board Bob Jones (CERN) 28 November 2014.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
1 Galileo / EGNOS Status GNSS Regional Plan Workshop July 12 th Casablanca Morocco Dr. Cedric Seynat Technical Department European GNSS Supervisory.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters.
19-21 February 2008 Michael Shaw, Director U.S. National Coordination Office for Space-Based Positioning, Navigation, and Timing (PNT) GPS-Galileo Progress.
D/IMT-T ESA’s Technology R&D Programmes IST ‘98 Vienna December 1998 N.E. Jensen Head of Technology & Systems Studies Dept. ESA/ESTEC, Noordwijk, The Netherlands.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
ISRO – NASA Space Science Co-operation S.Seetha Programme Director, Space Sciene Programme Office, ISRO HQ & Co-Chair-INMWG Meeting on 24 th Feb 2016 at.
WP3 - Evaluation and proposal selection
ESA Iris Programme workplan of activities
Space-oriented startup is looking for talents
Galileo European Commission The European Satellite Navigation Program
What’s next: R&D funding opportunities
International Civil Aviation Organization
GNSS opportunities in Road Transportation
Introduction to GNSS opportunities in different Market Segments
ESA SSA Roadmap for the L5 Mission
2018/19 Annual Performance Plan
Autonomous Operations in Space
Giove and Galileo: Effects
SPLITTING THE ATOM TO CONNECT THE PLANETS
Presentation Title (optional)
Presentation transcript:

European GNSS Evolution Programme 2013-15 IWG, New Delhi, India, 05 Feb 2014

OVERVIEW Initiated 2013 in EGEP EGEP Workplan 2014

G2G DEVELOPMENTS STARTED 1 ELECTRICAL PROPULSION SUBSYSTEM INDUSTRIALIZATION AND THRUSTER OPERATIONAL CHARACTERISATION Prerequisite for G2G to keep launch costs of larger platforms in present launch cost envelope E. g. 3 sats in Soyuz ST or 1 sat in VEGA Transfer time of 12 months requires new launch strategy First contract kicked-off Dec. 2013, second one follows in Feb. 2014

G2G DEVELOPMENTS STARTED 2 GALILEO 2nd GENERATION SPACE SEGMENT PHASE A/B1 Follows Galileo-1 after 2021 Flexibility to replenish in different planes w/ one single launch Increasing Galileo payload capability (ISL, increased signal power levels, upgraded PRS, more robustness, etc.) Two parallel contracts kicked off in Dec. 2013, third one follows

G2G DEVELOPMENTS STARTED 3 INTER-SATELLITE LINK PRE-DEVELOPMENT Improved Security Less dependence on ground segment Lower number of GDDN connections Improved command capabilities within seconds Improved Accuracy Performance Smaller ODTS UERE, faster convergence after maneuvers, improves integrity/RAIM, AUTONAV Additional Benefits Sounding of atmosphere Activity kicked off in Dec. 2013

G2G DEVELOPMENTS STARTED 4 G2G SUPPORTING ACTIVITIES Development of Advanced Multi- constellation Signal & Interference Testbed Enhancement of Orbit Determination & Time Synchronisation PRS Signal Robustness KO in Sept 2013, currently at PDR ODTS using ISL and G1G lessons learnt Negotiations w/ selected bidder presently Improved PRS (classified activity) Evaluation presently going-on

G2G DEVELOPMENTS STARTED 5 CLOCK DEVELOPMENTS Miniaturized low-maintenance PHM Robust RAFS Caesium clock Ends Q2/2014 (cont’d in 2014) Ends Q2 /2014 (cont’d in 2014) Finished Q4/2013 (cont’d in 2014)

G2G DEVELOPMENTS STARTED 6 G2G SYSTEM ENGINEERING STARTED Joint G2G System Engineering Office established System Support from Industry under negotiation

EGNOS NEXT GENERATION V3 1 EGNOS V3 Phase A/B1/B2 (2 parallel contracts) RIMS V3 Prototype ARAIM Thales-F: Phase B2 started Astrium-D: Phase B2 starts end of Jan. 2014 Proposals presently evaluated / clarified Parallel activities w/ IFEN and GMV Skysoft end Q1/2014

EGNOS NEXT GENERATION V3 2 SUPPORTING ACTIVITIES Standardization Ionosphere characterization Two parallel Testbeds on V3 Integrity Q1/2014 KO Jan 2014 HISTB KO Jan 2014 NISTB KO Jan 2014

AO SCIENCE & TECHNOLOGY Scientific applications of Galileo (GNSS) and EGNOS Innovative proposals on technology for the evolution of Galileo and EGNOS Two step procedure: First extended abstracts, then pre-selection of invited bidders and submission of full proposals Submitted abstracts: 29 science, 41 technology Pre-selection took place Requests for full proposals in preparation

EGEP WORKPLAN 2014 EGNOS NEXT GENERATION V3 Continuation of EGNOS V3 Testbeds (Part 3) - HISTB Q3/2014 - NISTB Q3/2014 GALILEO NEXT GENERATION (G2G) • On-board Clock Ensemble CMCU new • Miniaturised low-maintenance PHM (cont’d) • ARAIM Detailed Threat Allocation and Barriers Q2/2014 • Next Generation Signal Generator (cont’d for PRS) • Robust RAFS (cont’d) • On-board Caesium Clock Design Consolidation • Ground Caesium Development Prop. under evaluation • 2nd Call AO Science and Technology Q2/2014