S.A.B. Welcomes all Visitors Discussion on Proposed N2 Wild Coast Toll. With specific reference to the Joyner rd Toll.

Slides:



Advertisements
Similar presentations
We need a moratorium Give us the time to find a solution We have an incompatible land-use puzzle to solve The southwestern portion of Buffalo County is.
Advertisements

A Northern Gas Pipeline: The Big Picture Patrick D. Daniel President & CEO Enbridge Inc. : Far North Oil & Gas Conference September 20, 2001.
Economic Impacts of Climate Change
© 2004 Dominion Dominion Proposal January 24, 2005.
Smarter Travel Programmes– Financial impacts for Transport for London COLIN BUCHANAN
©2009 ViTAL Economy, Inc. ViTAL Economy Alliance Initial Market Assessment Transportation Distribution and Logistics Cluster.
Oklahoma Department of Environmental Quality October 23,
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
1 Administrator Introduction Driver Discount Lodging Program For T-Chek Systems.
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
When Markets Dont Clear: Ceilings and Floors When Markets Dont Clear: Ceilings and Floors VALUATION OF BENEFITS AND COSTS 2.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
Hong Kong-Zhuhai-Macau Bridge
Public Goods and Common Resources. Introduction We consume many goods without paying: parks, national defense, clean air & water. When goods have no prices,
Existing approach from Chandapura Circle to Garden Retreat Distance from Chandapura Circle: 6 km (including 2 km stretch of 80-feet road in JR Gardens)
Author, other info SCF Phase II [1] Seafront Cycle Route: Phase II.
GREATER LINCOLNSHIRE GROWTH DEAL PROJECT NAME:GRANTHAM SOUTHERN RELIEF ROAD PROJECT LOCATIONSpitalgate, Grantham LEAD APPLICANTSouth Kesteven District.
Chapter 12 Global Marketing Channels and Physical Distribution
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
European Commission Directorate-General for Energy and Transport n° 113/12/2002 IDEAS FOR COMMON CHARGING PRINCIPLES TO ALL MODES December 2002 Catharina.
Economic Geography, Linkages and Low Carbon Economy Business Geographies and Linkages John McCreadie – 6 th July 2010.
MTF Rail Development Forum
Road charging and vehicle taxation - the EU perspective
A Very Big Experiment Congestion Charging in London Peter Jones Transport Studies Group University of Westminster.
Attitudes to alternative transport funding Graeme Colman Principal, Horizon Research Limited NZCID 25 July 2012.
Transport Investing in Regions SEATS Meeting 17 February 2012.
COROZAL LPWG Municipal Development Plan Presentation of draft chapters 1, 2 and 3 2 nd National Workshop Belmopan, December
Externalities A cost or benefit to a third party who is not involved in the transaction between producer and consumer External cost is also known as “negative.
TRACECA PROJECT EVALUATION
TOLL ROAD IMPACT - TOYOTA SA Richard Wingfield Manager - Communications : Toyota SA.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Professor: Keren Mertens Horn Office: Wheatley 5-78B Office Hours: TR 2:30-4:00 pm ECONOMICS OF THE METROPOLITAN AREA 212G,
Public Transit in the Lowcountry and the Bus Livability Grant MTAP/SCOPTSavannah December 7, 2010.
Tourism.
SAACI PRESENTATION TO THE KZN TOURISM QUARTERLY GROWTH FORUM 3 FEBRUARY 2012.
Phase 1 Consultation Results 23 rd September 2014.
XUE JI (ZOE).  Pro: Brings in money  Helps to promote the region to outsider investors,  Puts you "on the map“  The region builds more attraction.
FOCUS AREAS ON NATIONAL ROADS Congestion. FOCUS AREAS ON NATIONAL ROADS Causes – Traffic Density.
ROAD ADOPTION PROCESS TOPIC GROUP OVERVIEW OF HCC ROAD ADOPTION PROCESS DAVID HUMBY 24 TH & 25 TH FEBRUARY 2010.
Market Failure.
Road pricing. Why ? What is it ? How might it be introduced ? Where and when ? How might it work? Why ? What is it ? How might it be introduced ? Where.
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Safer roads, better journeys. Welcome Anthony Meehan School Travel Plan Team Gloucestershire Highways.
Unit 5 Operations Management Location. Learning Objectives To be able to explain the causes and consequences of location and relocation – domestically.
PRESENTATION TO NATIONAL TRANSPORT PORTFOLIO MEETING 15 February 2011
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
C OMMITTEE FOR A DELAIDE R OADS Adelaide’s Missing North-South Link.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
Ministry of Transport, Maritime Affairs and Communications of the Republic of Turkey Intermodality leads to Sustainability A workshop for the Working Party.
Grade 8 term 4.  Scarcity of resources  Surplus : having more than required ie Middle East has plenty of oil, but not enough agricultural industry.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Free Personal Care at Home The Story So Far. Key stages Summary of the proposals ADASS’s view – the positives ADASS’s view – the problems What happened.
Prepared for the Milford Board of Selectman May 9, 2016.
Strategies for industrial development
Gauteng Freeway Improvement project e-toll new dispensation presentation to the portfolio committee on transport 09 June 2015.
Downtown Valdosta Truck Traffic Mitigation Study
Presentation to the Portfolio Committee
Autonomous Vehicles The Implications on Urban Transportation
SIZEWELL C: STAGE 2 CONSULTATION
Chisinau-Gurgiulesti Motorway, Construction of Comrat Bypass
X E FEIKIE D K DAS and MMH MOSTAFA
BLUE ROSE CITY DEVELOPMENT
Problems with Toll Point Position
Hong Kong-Zhuhai-Macau Bridge
Prepared by Candice Au-Yeung. CEE 424: GIS for Civil Engineers
Future Visions: overview of GCP plans and proposals
Session 3: Market Efficiency and Sustainability
Presentation transcript:

S.A.B. Welcomes all Visitors Discussion on Proposed N2 Wild Coast Toll. With specific reference to the Joyner rd Toll.

AGENDA - N2 WILD COAST TOLL MEETING 2pm – 4.30pm SAB Admin Boardroom 13/11/02 Welcome and Introductions. (10 min) - GF Detailed Map of the Upper South Coast Toll Plaza’s and alternate routes. (15 min) – Developers/PS Expected Costing’s and Concessions. (15 min) – Developers/PS Concerns by relevant business parties. –SAB. (15 min) - GF –Toyota. (15 min) - RW –Sappi. (15 min) - MH –Unilever/Robertsons. (15 min) - WW Response by developers and consultants. (30 min) – Developers/PS The way forward. (20 min) - All Close and drinks in 4.30pm - All

Prospecton Rd Joyner Rd Dickens Rd Moss Kolnik Rd Adams Rd SAB TSA Rob TSA PRIMERESIDENTIALPRIMERESIDENTIAL Toti CBD Sappi Toll TT TT TT N2 North

PROS RE THE N2 WILD COAST TOLL ROAD It will provide much needed employment in the area It will boost business along the EC section of the road with erection of Fuelling stations etc. It will provide a safe and cost beneficial transport route for business to distribute their goods to the Eastern Cape. Surely this is where the cost vs benefit lies and this is where the substantial percentage of the funding for the Toll road should come from ? It will encourage tourism down the South Coast – one of the most scenic stretches of coastline in the country. It will allow for a reliable safe alternative of Transport should the Durban harbour not be able to cope with demand, then business could use road to PE or Cape Town harbours. It will alleviate the strain on the rail system for transport of raw materials such as coal and timber to big industry. At the onset I must start by saying we agree totally will tolling of new roads, it makes socio – economic and environmental sense, however tolling of existing roads in our view is preposterous.

CONS RE THE KZN LEGS OF THE N2 WILD COAST TOLL ROAD We have over 240 heavy-duty reticulated vehicles going in and out of Joyner road every single day. This will cost us over R750000/annum – for absolutely no benefit as the current N2 is perfect. Over 50% of the staff that work at SAB Prospecton live South of this toll road, this will have financial implications on them as they will have to pay for a road they already travel on and is currently perfectly suitable. There is absolutely no benefit for them either. Their alternative route is the R102, which is already very congested and would become extremely over congested, dangerous and time consuming for these employees Their properties will be substantially devalued as a result of the South Durban area becoming less desirable than it already is, especially those properties along the R102 as this will become a congested highway and significantly spoil the current appeal of this section of Amanzimtoti. We are all for the Eastern Cape Toll road as there are benefits to everybody. We just cannot accept the Joyner road as a feasible Toll plaza point.

CONS RE THE KZN LEGS OF THE N2 WILD COAST TOLL ROAD The current taxi fees are already high and will only go up if Taxi operators use the Toll road. We subsidise our staff to get to and from work, this will again be at a cost to SAB at no benefit. The value of our business premises as well as those of other big and small business in the area will decline, as the area will be less desirable to manufacturers and Distributors than other areas that are not affected by tolls outside their front door. Our raw material suppliers will have to incur costs to get product to us from the harbour and Durban. Costs that will inevitably be passed on to us. An alternative route will pass outside our main gate, which as has already been discussed will be immensely over congested. This will severely affect our Distribution vehicles getting in and out of the depot; it already is a problem with trucks parked back up to 500m from the main gate at times, so I cant imagine how it would work. We pride ourselves on having amongst the best distribution service in the beverage industry and cannot compromise on these standards having trucks being delayed at gate our whilst waiting to get on to the N2. The already high noise and air pollution levels will only get worse, affecting the working environment for our employees as well as the value of the properties of those employees who live South of Joyner road. The South Durban Basin is allready clouded by negatives such as pollution, poor town planning and an absurd railway travelling along the coastline, these all add to making it a non preferred place to live and invest. A Toll road will only make this worse.

SOME SUGGESTIONS Leave the Park Rynnie Toll plaza and put a “self funding” one up at Port Edward as this is where public and business will see the benefit and be prepared to pay to use a new stretch of road there. Offer residents, big business and taxi operators in and around the area, significant concessions to make it benefitial for them to use the toll road and also implement a system to discourage the use of the R102 as an alternative. Build and erect an entirely new toll road, linking up to the Marianhill toll plaza to a Park Rynnie plaza. This will offer business in the Northern Province a cost effective route down the coastline to EC and WC – This will aslo encourage significant development in KZN along this new route and help subsidise future toll roads down to the EC. In summary we want to see a better road linking KZN and EC, however we do not agree that by tolling an existing road of >25 years and making the residents and business in these areas subsidise the EC section is once again preposterous. Thank You We Have some Suggestions