Communicating with VAP Certified Labs Before Sampling Astrea Taylor.

Slides:



Advertisements
Similar presentations
Why Lab. Certification? Laboratory certification tries to insure that the laboratory is qualified and capable of analyzing the sample and obtaining quality.
Advertisements

ASPIRE Off-Site Visits. Rationale Why make an allowance for off-site visits in the protocol? Adherence & Retention Off-site visits Improving Clinic Flow.
Real-Time Ticketing Score My Team. Real-Time Ticketing Real-Time Ticketing is an evaluation of your ability to enter tickets and information into ConnectWise.
Qualifications Portal Guide
Making A Cold Call.
Cover Letter Writing.
UNDERSTANDING ENVIRONMENTAL LABORATORY/QC REPORTS Maya Murshak – Merit Laboratories, Inc.
Welcome Seniors. Overview  State and District Requirement  Great experience to explore something new. Get excited about it. Choose something you are.
Excellent investigations. Keep it simple Change only one variable. Keep all the others the same. It’s not only easier to do only one experiment at a time,
Frequently Asked Questions
Welcome To Hermiston ONLINE! Orientation for the 2012/2013 School Year.
Sampling: Your data is only as good as your field technicians.
Voting Systems.  DS200 – new 2013  DS850 – new 2013  AutoMARK Voting Equipment.
The Chairperson’s Guide What to Expect When You’re Fundraising A how-to guide: Raise a lot of money in a little time with less work Fall 2014 Chair.
“What do you want me to do now?”
Role of the Certified Laboratory What really happens when you drop off a sample at a VAP certified lab, and why it is important for CPs to know Kevin Shoemaker.
Using the Budget in Community A brief step by step guide to managing your group’s finances through the Student Activities Software.
The Admissions Office Krys Daniels – Deputy Academic Registrar (Admissions) Partner College Admissions Training.
Accounts Payable Training Vendor Information & Voucher Preparation Revised 10/16/2014.
Importance of Quality Assurance Documentation and Coordination with Your Certified Laboratory Amy Yersavich and Susan Netzly-Watkins.
Placing Order Approval Process Manufacturing Delivery SUBMITTAL PROCESS.
Return of DQOs - Data Interpretation and Risk Assessments Amy Yersavich, Susan Netzly-Watkins and Mike Allen.
Inventory in Real Time. * Make it work – Set yourself up for success * What’s the effect? * To count or not to count * Entering Inventory * Compare and.
Employment Certificate Program Guide School District 28.
Lead Dust Sampling Technician March Chapter 4 Selecting a Laboratory and Interpreting Results.
Advance Ship Notices Training Presentation for Supply Chain Platform: BAE Systems July 2012.
Voting Systems.  DS200  DS850  AutoMARK Voting Equipment.
Infinite Campus - Student Information System MMSD New Teachers Infinite Campus Information Welcome! Have a terrific year.
Centralized Library Automation Preparation Grant Training Session Spring 2008 Connie Amon Christie Thomas.
Introduction to our On-Line Self Service Center at
MERVE ALPEREN Industrial Engineering Department, The 2 nd class Dokuz Eylul University,IZMIR.
A Comprehensive Computer Application for Managing Sample Planning, Electronic Data Manipulation and Data Validation and Verification in Support of the.
© Oklahoma State Department of Education. All rights reserved.1 Credit Cards: More Than Plastic Standard 8. 1 Credit Cards and Online Shopping.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
Continue existing support for Tier 1 key customers Account managers for Tier 2 customers Dedicated helpline and account managers for Tier 3 customers Develop.
Junior Seminar The College Application Process Part II.
Troop Leader Instructions for Online Participation
Introduction to Acuity STAR Author: Paul Malcomson Introduction to Acuity STAR Author: Paul Malcomson.
Collection of Assessment Results
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
Emission Inventory Quality Assurance/Quality Control (QA/QC) Melinda Ronca-Battista ITEP/TAMS Center.
Auditing: The Art and Science of Assurance Engagements
E-Rate Training for TASBO Members October 8, 2008 Presented by Susan Sullivan Director of Technology/Media.
College Application Process Parsippany High School Fall 2015.
| Data Validity and Usability in the RI/FS Process CHRISTINA MOTT FRANS, JOSH HOPP, CHRISTINE RANSOM.
 Computer freezes  Internet won’t connect  won’t work  Sound isn’t working  Program won’t run  Document won’t print And What Is the First.
Industrial Stormwater Sampling May 25, 2011 Blaine, Minnesota.
Messages 1. Outline Fields of an Subject line One point per The expected response Be a good correspondent Final tips 2.
Completing the Tests in the Sales and Collection Cycle:
How to write a professional
HEALTHY YOUTH SURVEY 2016 SURVEY COORDINATOR TRAINING.
Sample Collection Training Guide. Sample Collection Overview It is the responsibility of the transfusing facility to collect and properly label blood.
ACCESSING AND UTILIZING THE PROVIDER PORTAL MEDICAL AUTHORIZATION UNIT 1.
TWFG Branch Meeting – 1 st Quarter Logging In AMP was designed for use with Chrome. While some features may work in Internet Explorer, we recommend.
EnergySTEP1 Data Center Assessment: After the Sale How to Present the Customer Report How to Follow up on Sales Opportunities.
Cooler Packing Instructions
Cooler Packing Instructions
Field Inventory Services-Sanofi Inventory and Audit Training
Jessica Dare, Principal Consultant
Payroll Certification
Preparing for Campus Testing
Healthy Youth Survey 2018 Survey Coordinator Training
2018 Trails-End Popcorn Training
Healthy Youth Survey 2018 Survey Coordinator Training
Qualifications Portal Guide
Qualifications Portal Guide
Order procurement Input: customer need Sales: identifies customer need
Healthy Youth Survey 2018 Survey Coordinator Training
Organizer Preparation for on-site Execution
Presentation transcript:

Communicating with VAP Certified Labs Before Sampling Astrea Taylor

Next Phase of the Project Life Cycle 1.PLANNING: 2.SAMPLING: 3.ASSESSMENT: 4.EVALUATION: Plan for data collection using the DQO process Collect data using a SAP and FSOPs Verify that data meets DQOs Make data-based project decisions

Two general ways projects arrive to CL CP 1: Clever Guy CP 2: Lyon Downonthejob Gets a quote from CL Sales Manager Talks with the Sales Manager and Project Manager Requests a bottle order with enough for duplicates and MS/MSDs Prepares a clear Chain of Custody Delivers samples with advance notice, meets short holds and rush needs Gets a quote from CL Sales Manager Doesn’t talk with Sales Manager or Project Manager Uses old bottles leftover from another project Barely completes the Chain of Custody Delivers samples without notice, short holds missed, rush missed

The difference… The first CP – Works smarter, a little harder – Saves time and money – Causes less confusion in the lab – Fewer missed holding times – More likely to receive rush data on time – Receives correct methods and detection limits – Receives VAP-certified data – Doesn’t have to resample like CP 2

Quote follow-up So you’ve awarded the project to a lab Most CPs let the CL Sales Manager know… – Always talk with the Sales Manager, because some projects aren’t entered or activated in lab systems until they’re awarded – What does the Sales Manager tell the Lab Project Manager? – Potential blind spot – Possibly a miscommunication

Lab Project Manager Talk or meet with the Lab Project Manager – Puts a voice with the name – Ensures you don’t slip through the cracks – Communicates specific details Best way to do that is…

CL Kick-off meeting Meeting with the lab is a great way to connect with the Project Manager and to ensure all the details of your project are understood. DQOs

QAPP or DQO Sharing Discuss QAPP or DQO – Analytical methods – Analyte lists – Reporting limits – Rush expectations – Delivery methods – Estimated arrival dates – Other details, like electronic data deliverables Send QAPP / DQO to the Project Manager and ask him/her to read and sign off for the lab’s part

Bottle Order Project Manager will provide sufficient bottles for all analyses – Extra containers for duplicate samples and MS/MSDs – An extra 10-15% glassware in case of breakage – Individually printed labels or barcodes (possible with some labs) – Trip blanks for VOC samples

Planning for Sample Delivery 1+ months before sampling Contact lab or meet up, give a general timeframe, DQO and QAPP sharing, indicate rush or not, order bottles “We’ll be sampling late August / early September.” 2-3 weeks before sampling Communicate planned sampling date by “We’ll be sampling around September 3 rd.” Week of sampling Ensure bottle order is correct, confirm planned date by “Changed to September 4 th.” Day of sampling Courtesy call “Samples need to be picked up by your courier at 3pm at the site.” or “We’ll ship samples tonight for delivery tomorrow.”

Chain of Custody (COC) Gives necessary information to the lab – Project name – Analytical methods and versions (8260 B or C?) – Sample name, date, time, and matrix – MS/MSD sample designations – VAP certification needed – Turn around time (rush) expectations – CP contact information – PO Number

E-Chain of custody Ask for an e-COC Complete it yourself, or ask your Lab Project Manager to create one with proper analyses Available as an Excel spreadsheet for editing ease Easier for the Field Technician Easier for Log-in Department Easier for the Project Manager Helps ensure COC completeness, including requesting VAP analyses

Smart Labs OHIO VAP

Review Talk with the Sales Manager Talk with the Project Manager – Share QAPP / DQOs – Discuss rush and short holds – Order enough bottles – Discuss delivery method and dates Have a plan for the Chain of Custody

Communication