WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH.

Slides:



Advertisements
Similar presentations
ODOT FUEL USAGE BENEFITS OF IDLE REDUCTION. Rudolf Diesel Rudolf Diesel constructed the first diesel engine in 1897 This led to an 1898 patent #608,845.
Advertisements

BETTER SOLUTIONS KMS : PRESS Transport/Installation
Fuel Oil A Refiners outlook A student presentation For class-VII By Shagufta shaheen.
Resource and Energy Recovery Facility A technological breakthrough that redefines the waste-to-energy category June 26, 2009.
SIERRA CLUB MARYLAND COOL CITIES WORKSHOP JUNE 27, 2009.
Concession Agreement Tirana International Airport Nene Tereza
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Reefer market overview
PORT OF LAKE CHARLES. CITY DOCKS 11 USAID/USDA approved transit sheds 13 Ship Berths 1.3 million square feet waterfront storage 600,000 square feet of.
GREEN GLOBAL LOGISTICS VIETNAM (GGLC) GGLC - Your Reliable Partner NO.01, CAI LAN ROAD, BAICHAY, HALONG CITY, QUANGNINH PRO., VIETNAM TEL/FAX: (84) ;
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Energy Market Tutorial Presented by Company Webb.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
Martin Grohman, LEED®AP Director of Sustainability, GAF Slide 1 Recycling Roofing.
INTERTANKO,ATHENS 13th April
SK E&C Engineering & Construction.
Express Shipping & Logistics (EA) Ltd is a leading total logistics service provider. From a humble beginning in 2001, we have achieved sustainable,
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Oil And Gas Development In Iran
AARAS SHIPPING AGENCIES (PVT) LTD. handled three Vessels XIANG GUIMEN, HONG PROSPERITY and M.V SE PELAGICA simultaneously in the month of July, 2013,
Singapore as a Global Logistics Hub
First Solar FuelSmart™: Powering Energy Security
AARAS SHIPPING AGENCIES PRIVATE LIMITED Break bulk, Heavy lift, Oversized, Project & Ro-Ro Cargoes Expert In Pakistan NEW’S OF RECENT EVENT AT PORT MOHAMMAD.
Port of Duqm Company profile
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Company profile. Logistics Redefined Leader Group is a freight forwarding company founded in Lebanon in 2000 after its great success in Egypt. Our philosophies:
PAST, PRESENT AND FUTURE Jason Smith, TERA Environmental Consultants February 20, 2014 Simon Fraser University.
MV. “AMBER ALENA” arrived at Karachi Port on Oct 16, 2014 consisted Packages of Power Generation units 50MW, Oil Field Machinery, Land Drilling.
TERMINAL OPERATIONS GENERAL ASPECTS GENERAL ASPECTS CRITERIA FOR YARDPLANNING CRITERIA FOR YARDPLANNING CRITERIA FOR SHIPPLANNING CRITERIA FOR SHIPPLANNING.
The vessel “M.V. KING BRIGHT ” loaded from Shanghai (China) and arrived at Karachi – Pakistan on 15 th April 2013 and berthed at Berth No. 4-East Wharf.
THE ECONOMICS ASSOCIATION OF ZAMBIA P. CHISALE ( PhD, MSc., MEIZ, MZAA, REng.), Senior Lecturer, Thermal Fluids, Department of Mechanical Engineering,
Транспортно-экспедиционная компания ООО «АЛАВЕС ДНЕПР» TRANSPORTATION BY TRUCKS TRANSPORTATION AND FORWARDING COMPANY “ALAVES DNEPR”
AARAS SHIPPING AGENCIES PRIVATE LIMITED Break Bulk, Heavy Lift, ODC, Ro-Ro & Project Cargo Experts in Pakistan.
Viability of Small Refineries: Kenyan Perspective Presentation to: UNCTAD 11 th Africa Oil & Gas, Trade and Finance Conference Nairobi Kenya By John Mruttu.
AARAS SHIPPING AGENCIES (PVT) LTD are proud to announce that we have successfully handled the 2 nd Part of UCH Power Project vessel into our agency.
Muhammad Azam Director Refining Ministry of Petroleum and Natural Resources (September 13-14, 2006, Karachi) Fuels Quality Scenario in Pakistan.
World Bank Port Reform Toolkit Module 2 The Evolution of Ports in a Competitive World.
LATEST NEWS UPDATE NOVEMBER-2013 AARAS SHIPPING AGENCIES (PVT) LTD BREAK-BULK, PROJECT, HEAVY LIFT, ODC & RO-RO CARGO EXPERTS IN PAKISTAN.
AN OVERVIEW BY MR. FARHAN AHMED LPI AND PAKISTAN.
Specialized in ODC & Project Cargo
INTRODUCING: THE SUSTAINABLE I-5 MARINE HIGHWAY Astoria, OR Port Hueneme, CA.
Muhammad Azam Director Ministry of Petroleum and Natural Resources Government of Pakistan Steps towards; “Developing Fuel Quality Road Maps in Asia” (May.
Content Gas Turbine Overview V94.2 Gas Turbine Product Line
Message of the Managing Director EXCELLENT TRANSPORT NETWORK(ETN) is established in 2007 as one of the specialized Services providing company to Oil and.
BREAK-BULK, PROJECT, HEAVY LIFT, OVER DIMENSIONAL, OIL & GAS, ENERYGY & RO-RO CARGO EXPERTS IN PAKISTAN.
Maersk Line Presentation By Mr. David Williams, Managing Director of East China Cluster 09 Jan 2015 Leading the way to innovation.
1 Heavy Lift handling in Shanghai On Mar. 19 th, 2014 GSL refreshed our Heaviest Cargo Record! Cargo dimension and weight: 2 pieces each: x 5.7 x.
Ministry of Land, Infrastructure, Transport and Tourism Activities to ensure safety of international intermodal container transportation related to road.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
Your Logistics Window to Global Trade SA Global Logistics [SAGL] is an India based International Freight Forwarder offering a Innovative Logistics solutions.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
Global Project Cargo Solutions brunelprojectcargo.co.uk.
BP Holdings. Kinder Morgan and BP North America Enter into Long-Term Agreements Kinder Morgan Energy Partners, L.P. (NYSE: KMP) and BP North America (NYSE:
Atlantic Shipping Co. Ltd Atlantic Building Commercial Zone | P.O. Box : 1300 Port Sudan I Tel: I Fax:
How Much Oil?. In the United States, plastics are not made from crude oil They are manufactured from petroleum products, which include liquid petroleum.
Specialized in ODC & Project Cargo First Floor, Prachi Enclave, Near Maxus Mall Police Station, Bhayander (W), Mumbai INDIA.
BY:- AIYAPPA T.B, 5TH SEM CIVIL, KPT.
2002 – 2016 : 14 YEARS OF SERVICE EXCELLENCE
Project cargo.
Transport System.
NATIONAL COMPANY INDUSTRIAL ZONES
INTEGRATED TRANSPORT AND LOGISTICS An Intoduction
HARBOUR LOGISTICS KARACHI-PAKISTAN
INTRODUCTION Accenture Logistics Kenya Limited of P.O. Box 41560
WE/AARAS SHIPPING AGENCIES PRIVATE LIMITED PLEASED TO REPORT YET ANOTHER NEWS ABOUT OUR RECENT PROJECT SHIPMENTS WHICH WAS HANDLED IN THE MONTH OF DEC/JAN,
The EU Strategy and Action Plan for customs risk management
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
OUR ALL PAKISTAN SERVICES
INTERNATIONAL MARITIME SECURITY.
Presentation transcript:

WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH OF OCT/NOV 2014 WHERE MV. HAN ZHI APPOINTED TO OUR AGENCY SERVICES WITH COMPLETE LOGISTIC OPERATIONS. THE CARGO CONSISTED 179 HEAVY AND LONG PACKAGES OF PROJECT CARGO WHICH ARE WEIGHING AROUND MTONS AND 7176 CBM APPROX. OUR STEVEDORES EFFICIENTLY AND SAFETY DISCHARGED THE CARGOES FROM VESSEL AND TAKE DIRECT DELIVERY UNDER HOOK/HOOK AND ARRANGED INSIDE TRANSPORTATION FROM BERTH TO STOWAGE AREA ALLOTTED BY THE PORT QASIM AUTHORITY, AT THE STOWAGE AREA WE MADE SOME SPECIAL ARRANGEMENT FOR HEAVY UNITS TO OFFLOAD ON JACK STAND FOR SMOOTH LOADING/SHIFTING, AND AS ON COMPLETION OF CUSTOM FORMALITIES WE ARRANGED INLAND TRANSPORTATION OF CARGOES TO JOB SITE WHICH’S DISTANCE TO 1460 KM APPROX.

Attock Refinery (ARL) signed contracts with Hyundai Engineering Company for execution of the ARL up-gradation project which comprises installation of a pre-flash unit, Isomerisation unit, Diesel Hydrodesulphurisation unit and expanding the capacity of existing captive power plant. The overall cost of the project amounts to $251 million, which will be financed with a debt-to-equity ratio of 80:20. After the installation of the pre-flash unit, ARL’s refining capacity will increase by 10,400 barrels per day or 25%. Once the Naphtha Isomerisation unit is completed, ARL will be able to enhance production of premier motor gasoline by 20,000 tons per month. The Diesel Hydrodesulphurisation unit will make Attock Refinery capable of producing low sulphur content high speed diesel, which burns cleanly and efficiently. Moreover, Hyundai Engineering has also been given the contract to expand ARL’s captive power plant by 18 megawatts (MW). The agreement was signed at a ceremony at ARL, Morgah, Rawalpindi, where ARL CEO Adil Khattak and Hyundai Engineering Company Project Director Won Ock Kim were present. Speaking on the occasion, Khattak said that the project will prove to be of immense value not only for ARL, but also for the country. He appreciated the efforts of both ARL and Hyundai’s project management teams for their hard work in concluding these agreements and hoped that refinery up-gradation project shall be completed within the agreed time frame. ARL’s CEO also thanked the Ministry of Petroleum and Natural Resources for enabling the local refineries to undertake up-gradation and expansion projects in the country. PROJECT OVERVIEW:-

“MV. HAN ZHI” ARRIVED AT: PORT QASIM PAKISTAN ARRIVED ON : OCT PORT OF LOADING: SHANGHAI CHINA BERTHED AT : MW # 02 CARGO MEANT FOR : ATTOCK REFINARY LIMITED (ARL) MORGAH RAWALPINDI : OIL AND GAS DEVELOPMENT COMPANY LIMITED, KARAHCI : CHINA HARBOUR ENGENEERING CO. LIMITED, DHA KARACHI COMMODITY: 137 HEAVY/LONG HAUL PACKAGES FOR UP-GRADATION PROJECT which COMPRISES INSTALLATION OF A PRE-FLASH UNIT, ISOMERISATION UNIT, DIESEL HYDRODESULPHURISATION UNIT AND EXPANDING THE CAPACITY OF EXISTING CAPTIVE POWER PLANT. : 12 PACKAGES /8 TH PARTIAL SHIPMENT AMINE ABSORBER, AMINE REGENERATOR, CONDENSATE STABLIZER INLET GAS ABSORBER, COLUM DE-ETHAIZER : 30 PIECES OF PRETENSIONED SPUN CONCRETE PILES TOTAL PACKAGES: 179 PACKAGES TOTAL WEIGHT: 2, METRIC TONES TOTAL CBM : 7176 CBM APPROX

Suite 701, 7 th Floor, Business Plaza, Mumtaz Hassan Road, I.I. Chundrighar Road, Karachi – Pakistan Tel: Fax: THANK YOU FOR YOUR TIME