Presentation is loading. Please wait.

Presentation is loading. Please wait.

Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.

Similar presentations


Presentation on theme: "Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia."— Presentation transcript:

1 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013

2 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 2 Global Cruise Passengers achieved a significant growth during the 1970s mainly in the US continuously expanding worldwide by doubling in the last decade >> 10.0 mil (2000) 19.8 mil(2011) Ratio of Cruise Passengers slightly less than 1% of the population in Europe slightly less than 4% of the population in the US against approx. 0.06% in the Asia-Pacific region >> significant increase is expected especially in the Asia-Pacific region Promotion of cruise ship port calls can significantly reinvigorate regional economies and human exchange among APEC countries Potential of Cruise Industry

3 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 3 Japan Sea East China Sea Busan, 1 berth (-11.5m, extended by 360m) [2007] In progress (80,000 GT-grade berth) [2013] Busan, 1 berth (-11.5m, extended by 360m) [2007] In progress (80,000 GT-grade berth) [2013] Shanghai, 3 berths (-9 to 13m, extended by 850m)[2008] 2 berths (-11m, extended by 1,000m) [2011] Shanghai, 3 berths (-9 to 13m, extended by 850m)[2008] 2 berths (-11m, extended by 1,000m) [2011] Hong Kong, 2 berths (-10m, extended by 701m) In progress, 2 berths (-12m, extended by 850m)[2013] Hong Kong, 2 berths (-10m, extended by 701m) In progress, 2 berths (-12m, extended by 850m)[2013] Singapore, 3 berths (-9.4 to 12.4m, extended by 730m) * Height limit: 52m 2 berths (-11.5m, extended by 720m) [2012] Singapore, 3 berths (-9.4 to 12.4m, extended by 730m) * Height limit: 52m 2 berths (-11.5m, extended by 720m) [2012] Tianjin, 2 berths [2010] In progress (A total of 6 berths will be in service. Extension: 2,000m) Tianjin, 2 berths [2010] In progress (A total of 6 berths will be in service. Extension: 2,000m) Nagasaki, 1 berth (-12m, extended by 360m) [2009] * Height limit: 65m Nagasaki, 1 berth (-12m, extended by 360m) [2009] * Height limit: 65m Naha, 1 berth (-10m, extended by 340m) [2009] Penang, 2 berths (-10 to 11m, extended by 570m) 1 berth (-12m, extended by 400m) [2010] Penang, 2 berths (-10 to 11m, extended by 570m) 1 berth (-12m, extended by 400m) [2010] Source: Websites of and documents issued by governments, port managers, etc. Hakata, 1 berth (-10m, extended by 270m) Jeju Island, 1 berth (-11m, extended by 195m) 1 berth (-12m, extended by 360m) [2011] Jeju Island, 1 berth (-11m, extended by 195m) 1 berth (-12m, extended by 360m) [2011] Xiamen, 1 berth (-12.4m, extended by 463m) [2008] Incheon, (-8.2 to 11.8m, extended by 184 to 270m) In progress (100,000 GT-grade berth) [2014] Incheon, (-8.2 to 11.8m, extended by 184 to 270m) In progress (100,000 GT-grade berth) [2014] Cruise Terminal Expansion in Asia

4 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 4 Cruise Shipping Company Port Authority Local Government CIQ relevant ministries Ministry of Land,Infrastructure, Transport and Tourism One-Stop desk Cruise Contact Desk Ports and Harbours Bureau) Coast Guard Maritime Bureau Tourism Agency Ministry of Agriculture, Forestry and Fisheries (Quarantine) Ministry of Health, Labour and Welfare (Quarantine) Ministry of Finance (Customs) Ministry of Justice (Immigration) Other Ministries Japan Cruise Port Association Port Authority Local Government National Government Others E-mail cruisecontact@mlit.go.jpcruisecontact@mlit.go.jp Tel +81-3-5253-8678 (Direct) HP http://www.mlit.go.jp/en/kowan/index.html Operating Hours 9:30 - 18:15 (JST) weekdays E-mail submitted during holidays or after operating hours will be responded after next operating day.

5 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 5 Phase 1 Collection of the information on cruise port facilities by paper-base Each member state of APEC collects necessary information on cruise port facilities using a common format. (Japan will provide a common format according to members request.) Phase 2 Provision of the information through integrated website Each member state arranges a website which integrates and provides the information collected in Phase 1. Also, APEC TPTWG secretariat establishes a portal page and links to each states website to provide all necessary information in an integrated manner. * No special budget excluding the expenses for the establishment of the portal page and the manpower of the secretariat is expected by APEC. provision of the information contributes to port authorities and private companies effective promotion activities Proposed Project (Phase 1 and Phase 2)

6 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 6 Example Facility Specification data (Request for comments)


Download ppt "Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia."

Similar presentations


Ads by Google