Presentation is loading. Please wait.

Presentation is loading. Please wait.

WE/AARAS SHIPPING AGENCIES PRIVATE LIMITED PLEASED TO REPORT YET ANOTHER NEWS ABOUT OUR RECENT PROJECT SHIPMENTS WHICH WAS HANDLED IN THE MONTH OF DEC/JAN,

Similar presentations


Presentation on theme: "WE/AARAS SHIPPING AGENCIES PRIVATE LIMITED PLEASED TO REPORT YET ANOTHER NEWS ABOUT OUR RECENT PROJECT SHIPMENTS WHICH WAS HANDLED IN THE MONTH OF DEC/JAN,"— Presentation transcript:

1

2 WE/AARAS SHIPPING AGENCIES PRIVATE LIMITED PLEASED TO REPORT YET ANOTHER NEWS ABOUT OUR RECENT PROJECT SHIPMENTS WHICH WAS HANDLED IN THE MONTH OF DEC/JAN, WHERE 02/TWO BREAKBULK/PROJECT CARGO VESSEL APPOINTED TO OUR AGENCY SERVICES WITH COMPLETE LOGISTICS OPERATION. THE TOTAL WEIGHT OF THE CARGOES THAT HAS BEEN DISCHARGED BY OUR STEVEDORES FROM THESE TWO VESSELS WERE AROUND 17, MTONS APPROX., MOST OF THE UNITS WERE LONG AND OVERSIZED WHICH DETAILS ARE MENTIONED AGAINST EACH PERFORMANCE BELOW:

3 MV. “SERPENTINE” ARRIVED PORT QASIM ON 29TH DEC 2015 CONSISTED “POWER GENERATION PROJECT” UP TO MEGAWATT CAPACITY (PARTIAL SHIPMENT) OF WIND MILL POWER PROJECT FOR M/S. MASTER WIND ENERGY LIMITED, COMPRISES 188 PACKAGES OF WIND MILL BLADES HAVING DIMENSION 41.X2.95X3 METER, WEIGHT MTONS AND CBM APPROX, OUR STEVEDOVERS EFFICIENTLY AND SAFETLY DISCHAGRED THE CARGOES FROM VESSEL UNDER DIRECT DELIVERY HOOK/HOOK AND ARRANGE INSIDE TRANSPORTATION FROM BERTH TO STOWAGE AREA ALLOTTED BY THE PORT QASIM AUTHORITY AND AS ON COMPLETION OF CUSTOM FORMALITIES WE HAVE ARRANGED INLAND TRANSPORTATION OF CARGOES TO JOB CITE, THEREAFTER VESSEL CALLED KARACHI PORT FOR DISCHARGING OF REMAINING CARGO WHICH INCLUDES 01/UNIT OLD AND USED ASPHALT MIXING PLANT TANAKA 2500 ASPHALT MIXING PLANT (PARTIAL 1) FOR M/S. MOHAMMAD ARIF CONSTRUCTION (PVT) LIMITED, AND OTHER CARGOES COMPRISES 658 PACKAGES OF STEEL STRUCTURE, PRIME GALVANIZED STEEL COILS, PRIME HOT ALLOY CHEQUERES STEEL SHEET, PRIME HOT ROLLED ALLOY STEEL SHEET IN COILS ETC,

4

5

6

7 MV. “HAN REN” ARRIVED PORT QASIM ON 30TH DEC 2015 CONSISTED 805 PACKAGES WITH TOTAL WEIGHT MTONS APPROX. THE PROJECT PARTS INCLUDES 139 PACKAGES OF WIND MILL TOWER SECTION, NACELLES, HUBS FOR “POWER GENERATION PROJECT” UP TO MEGAWATT CAPACITY (PARTIAL SHIPMENT) FOR M/S. MASTER WIND ENERGY LIMITED WHICH WERE WEIGHING AROUND MTONS AND CBM APPROX., 548 PACKAGES OF “COAL FIRED POWER GENERATION PROJECT” UP TO 2X660 MEGAWATT CAPACITY FOR M/S. PORT QASIM ELECTRIC POWER COMPNAY LTD, WHICH COMPRISES BOILER STRUCTURE (INCLUDING THE STAIR AND PLATFORM), STEEL STRUCTURE FOR PLANT, HIGH STRENGTH BOLT, PIPES, AIR PREHEATHER, ANDOIC SYSTEM ETC., 08 PACKAGES OF USED & OLD POWER PLANT OF 8000KVA HFO GENSET COMPLETE WARTSILE HFO GENERATOR, RADIATOR, EXHAUST SILENCER WITH ALL STANDARD ACCESSORIES AND ESSENTIAL PARTS STUFFED IN 4X40’GP & 1X40’HC (SOC CONTAINER) FOR THE PROJECT OF M/S. KOHINOOR TEXTILE MILLS LIMITED, 92 PACKAGES OF CRAWLER CRANES AND ACCESSORIES WITH CONTAINER ACTIVITY ROOMS ALONG WITH WORK CLOTTES ETC FOR THE PROJCET OF M/S. STEADY LIFT PAKISTAN PVT LTD, OUR STEVEDORES & OPERATION TEAMS WORKED DAYS AND NIGHT TO FACILITATE PRINCIPLE FOR FAST TURNAROUND THE VESSEL TO HER NEXT DESTINATION.

8

9

10

11 THANK YOU FOR YOUR TIME Suite 701, 7th Floor, Business Plaza,
Mumtaz Hassan Road, I.I. Chundrighar Road, Karachi – Pakistan Tel: Fax: Website:


Download ppt "WE/AARAS SHIPPING AGENCIES PRIVATE LIMITED PLEASED TO REPORT YET ANOTHER NEWS ABOUT OUR RECENT PROJECT SHIPMENTS WHICH WAS HANDLED IN THE MONTH OF DEC/JAN,"

Similar presentations


Ads by Google