Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

1 NRC Status and Plans for License Renewal – A Role for Consensus Standards Allen Hiser, Jr. Robert Gramm Stacie Sakai Division of License Renewal Office.
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
1 Ching-Hui Wu Department of Nuclear Regulation Atomic Energy Council, Taiwan September 23, 2013 An Overview of PRA Activities in Taiwan.
INPO Update CMBG Meeting June 2013
10 CFR Part 26, Subpart I Managing Fatigue 10 CFR Part 26, Subpart I Managing Fatigue Kamishan O. Martin, Human Factors Engineer Office of Nuclear Reactor.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
Summary of Draft NEI Guidance - November 6, GUIDELINES FOR PRIORITIZATION AND SCHEDULING IMPLEMENTATION Pre-Draft 1 – September 30,
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Cumulative Impacts James Slider November 7, 2013.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
NRC Endorsement of Standards
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
JK August ANS Standards Board Vice Chair November 29, 2012 ANSI Office, Washington, DC.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Groundwater Protection Initiative And Other Issues Of Interest George Oliver RETS/REMP Conference Charlotte, NC June 23, 2008.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Pilot Component Design Basis Inspection (CDBI) and Equipment Qualification (EQ) Program Inspection Feedback CONFIGURATION MANAGEMENT BENCHMARKING GROUP.
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
1 Fukushima Regulatory Response Workshop Washington, DC April 6, 2012 Seismic Issues Associated with NRC Near Term Task Force Recommendations 2.1 & 2.3.
NFPA 805 AND CONFIGURATION MANAGEMENT JIM LECHNER JUNE 7, 2016.
EPRI Update Procurement and Supply Chain
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Status and Prospect of Korean Korea Electric Power Research Institute
Prescriptive vs Performance-Based Regulatory Approaches
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
Spent Fuel Pool Instrumentation NRC Order EA
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
MIT Nuclear Reactor Laboratory
Research and Test Reactor Safety: The Regulatory Perspective
Adding Nuclear Power to the Grid
Decommissioning Rulemaking
10CFR50.69 – Approaches/Impacts on Configuration Management Configuration Management Benchmarking Group Summer 2018 Conference Chattanooga, TN Glen.
TRTR Briefing September 2013
PWR Sump Performance (GSI-191) Industry Workshop
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

Plant Vogtle 1&2 10 CFR 50.69 Pilot Program NESCC Meeting November 3, 2014

Agenda Vogtle Risk Categorization 50.69 Discussion Topics Why haven’t more utilities submitted 50.69? Is a Standard needed for the Categorization Process? Is a Standard needed for the Special Treatment Process? Summary/Questions

Risk Characterization - Vogtle submittal 3 5 Risk Contributors NEI-00-04 requires peer-reviewed IE PRA Internal Events Risk Fire Risk Seismic Risk Other External Events Risk Shutdown Risk Internal Events (including Internal Flooding) PRA Fire PRA Seismic PRA Other External Events PRA Shutdown PRA Updated Seismic Margin Analysis Updated IPEEE Screening S/D DID Model via EOOS FIVE

Why haven’t other utilities submitted? Utilities did not have infrastructure when rule made effective (November 2004) Significant investment required for risk models and characterization Industry concerned NRC would regulate Special Treatment through inspection SNC believes this will change with a successful pilot

Is a standard needed for characterization? At least three utilities have used NEI-00-04/RG 1.201 to categorize Guidance turned into detailed process & procedures NRC has reviewed procedures and witnessed IDP meetings STP has categorized over 100 systems NRC SER expected soon for Vogtle pilot Model adequacy Characterization process Extensive industry experience categorizing components Maintenance Rule AP-913 (Equipment Reliability)

NEI-00-04 Categorization TOC

Regulatory Requirements that No Longer Apply per 10CFR50.69 10CFR50.69 eliminates the following requirements for components designated as RISC-3 (low risk, safety-related): 10CFR50, Appendix B (quality requirements) 10CFR Part 21 (deficiency reporting requirements) 10CFR 50.49 (Testing, documentation, and margin requirements for EQ purposes) 10CFR50.55(e) (event reporting) 10CFR 50.55a(f), (g) & (h) (Applicable portions of ASME & IEEE codes and standards) 10CFR 50.65 (Maintenance Rule) 10CFR50.72 (notification requirements) 10CFR50.73 (licensee event reports) Portions of 10CFR50, Appendix J (primary reactor containment leakage testing) Portions of Appendix A to 10CFR Part 100 (Seismic qualification with respect to extent of testing and types of analyses)

Is a standard needed for Special treatment? Rule does not prescribe special treatments Rule is performance-based Reasonable assurance vs. reasonable confidence Extensive industry comments on IP 37060 (draft) Inspections should be performance-based, not prescriptive Draft IP in 2012 incorporated many industry comments Industry has developed guidance on treatment EPRI Special Treatment Guidance (2007), plus Environmental Qualification & Seismic SNC developing treatment procedures for 10 CFR 50 App. B, App. J, 50.55a, 50.65 (Maintenance Rule)

Summary PRA Models have a Standard Categorization process in NEI-00-04 for 50.69 is similar to other risk-informed initiatives Maintenance Rule RI In-Service Inspection Surveillance Frequency Control Program Risk Prioritization – Cumulative Impacts Guidance available for Special Treatments Performance-based rule Flexibility desired to define “reasonable assurance”