RMSC / SEE December 2016

2 Purpose of Presentation
Understand PWROG efforts in place for 50.69 Understand PWROG plan to deliver to members Members should be able to communicate this presentation to their sites – and help incorporate PWROG effort into their own plans

3 What is 10 CFR 50.69? 50.69 provides an option to reduce regulatory burden via risk-informing to make plants more cost-effective and provide flexibility to refocus resources on areas that matter. NEI provides the guidance.

4 How is the PWROG Involved?
Delivering the Nuclear Promise Risk Informed Operations NEI Task Force The PWROG’s Top Priority Moving into is to align to Deliver the Nuclear Promise. PWROG Generic Implementation via RMSC/SEE

5 How is the PWROG Involved?
OG’s provided support for the NEI LAR Template OG’s helping craft NEI (50.69 Guidance) Overall OG program being designed to accommodate industry effort The OG’s have been working in the background since early 2016 to ensure coordinated, industry effort

6 Annual Expected Savings for 1 Unit for 1 system –
Justify Industry Costs and Savings to Sites Cost Range to Implement for 1 System - $50,000 - $300,000 Total Cost Range to Generically Categorize a System (~40% of effort generic + site costs) - $21,000 - $124,000 Annual Expected Savings for 1 Unit for 1 system – $29,000 - $176,000 $ based on APS estimates

7 Why is the PWROG the Best Route for 50.69?
Network to Ensure Consistency – Improves Efficiency Categorization Alternate Treatments Common Industry databases Cost Savings Beyond Itself Generic categorization via OG avoids duplicate individual site work Each system ~650 hours Strength in numbers to support licensees during inspections The PWROG removes the duplicative nature of the work – doing it once for all

8 Suggested Industry Group Swim Lanes
Industry Guidance Industry Coordination Resolution of Generic Issues NEI Detailed Implementation Guidance Implementation Tools (Categorization Database, Dissemination of OE OG Alternate Treatments New Categorization Approaches (e.g. passive cat.) EPRI Time

9 PWROG Generic Implementation
Identification of Low Risk Systems (PA-RMSC-1477) Pilot Generic Categorization of Containment Spray (PA-RMSC-1516) Generic Categorization for Industry Site Implementation / Incorporation Coordinate between PWROG (RMSC, SEE), NEI, BWROG

10 Incorporating PWROG 50.69 Work
Containment Spray (pilot) Radiation Monitor NSSS What Systems Can Sites Plan OG to Cover? Plant Specific Systems Cooling Water BOP What Systems Should Sites Factor into their Workload Start Planning Now

11 Efforts Combine for Efficient 50.69 Implementation
PWROG Effort Complements and Plugs Into Ongoing Work at Site Site Work OG Work Efforts Combine for Efficient Implementation OG work does not duplicate site work…

12 RMSC/SEE Project Authorization Plan Overview

13 Technical Inputs Risk Characterization System Functions Definition
PRA model required for Internal Events (including Internal Flood) PRA or Qualitative Assessment for remaining hazard groups System Functions Definition UFSAR Design Basis Documents Master Equipment List Maintenance Rule Program System Functions Categorization PRA model driven – from mapped components Qualitative Assessment

14

15 1 Industry Tool (PA-RMSC-1515)
Vendor Tools Utility Tools 1 Industry Tool (PA-RMSC-1515) The Industry is Best Served with 1 Tool for Generic Categorization Multiple categorization databases are in progress…we need to combine efforts For a WIN. The PWROG (in coordination with the BWROG)has the infrastructure to coordinate 1 tool for the industry.

16 The Next Steps for 50.69 in the PWROG
OG Steps PAs for generic cat. Expected in Winter 2016/2017 Continued coordination with NEI Maintain timeline for sites to implement OG products Member’s Steps Members need to reinforce this info packet to site management Coordinate site effort with PWROG effort Prepare to approve PAs in Winter 2016/2017 Ready teams at site to respond to PA-RMSC-1477 surveys in Winter/Spring 2017