Cross-Bores – Best Practices Outreach and Education

Slides:



Advertisements
Similar presentations
CGU Padlock An innovative insurance solution for the Commercial Property Owner.
Advertisements

Elements of an Effective Safety and Health Program
[Imagine School at North Port] Oral Exit Report Quality Assurance Review Team School Accreditation.
Managing Compliance Related to Human Subjects Research Review Joseph Sherwin, Ph.D. Office of Regulatory Affairs University of Pennsylvania Fourth Annual.
Museum Presentation Intermuseum Conservation Association.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
for Cabin Safety Inspectors
Module N° 9 – SMS operation
Illinois Department of Children and Family Services, Pathways to Strengthening and Supporting Families Program April 15, 2010 Division of Service Support,
Create an Application Title 1A - Adult Chapter 3.
Report to TACIR on Underground Utility Damage Prevention in Tennessee
1 Career Pathways for All Students PreK-14 2 Compiled by Sue Updegraff Keystone AEA Information from –Iowa Career Pathways –Iowa School-to-Work –Iowa.
Accident and Incident Investigation
LIBRARY WEBSITE, CATALOG, DATABASES AND FREE WEB RESOURCES.
Lock Out/Tag Out (LO/TO)
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Gaining Senior Leadership Support for Continuity of Operations
Site Safety Plans PFN ME 35B.
Module 3: Developing Plans
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Loading and Unloading Students
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
May 15, 2013 Does GIS Stop at the Entrance Door of a Building? Wolfgang Haller Munich Airport.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Red Tag Date 13/12/11 5S.
Let’s watch a DVD… DVD Instructor Notes
1. 2 Earthquake effects on health care facilities 2.
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
1. 1.To gain a basic understanding of the Support Services Pathway. 2.To discover career options available within the Support Services Pathway. 3.To explore.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Checking & Corrective Action
Last Planner ® National Capital Region Community of Practice Victor Sanvido – Southland Industries Matt Bruening – Southland Industries 1.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Red Flags Rule BAS Forum August 18, What is the Red Flags Rule? Requires implementation of a written Identity Theft Prevention Program designed.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
General OH&S Induction Training Course 1 WHAT’S SO IMPORTANT ABOUT OCCUPATIONAL HEALTH & SAFETY? IN THE YEAR 2003, MORE PEOPLE WERE KILLED IN WORK RELATED.
1 A GUIDE TO LABORATORY SAFETY School of Engineering and Science February 2009 HEALTH, ENGINEERING AND SCIENCE.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
There are three types of emergencies:  Internal  External  Natural disasters.
Safety and Health Programs MODULE 7. 2©2006 TEEX Brainstorm  What makes a good safety and health program?  What does a good program do for you?
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
Functional Areas & Positions
1 BRState Software Demonstration. 2 After you click on the LDEQ link to download the BRState Software you will get this message.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 12 View Design and Integration.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Command and Management Unit 5.
Emergency Action Plans
Facilitating a Dialog between the NSDI and Utility Companies J. Peter Gomez Manager, Information Requirements, Xcel Energy.
Cross-Bores – Best Practices Outreach and Education Jim Marean Gas Technology Institute.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
CIS Case History NACE Eastern Area Conference
February 18, 2010 Terasen Gas. A Fortis company. Dig Safe B.C. Abbotsford Damage Prevention Burn blue. Save green.
1 Information Hearing The San Bruno Explosion: Pipeline Safety In California Panel IV – Maintenance, Inspection & Financing of Gas Transmission Pipelines.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
Hot Work Permit Osan AB Fire Emergency Services.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Union Gas Ltd. Cross Bore Safety Program
Gas Utility Operations Best Practices Program
Sewer Line Crossbore Program
Presentation transcript:

Cross-Bores – Best Practices Outreach and Education Jim Marean Gas Technology Institute Thank you for the opportunity to present this information on cross bore best practices. The presentation will be focused on improving safety for both existing installation where a cross bore may have occurred as well as for new installations to ensure no new cross bores occur We will review: What cross bores are How they occur Why you should care What we did to develop the best practices guide What’s included in the guide

Jim Marean – Senior Program Manager Senior Program Manager, Intelligent Infrastructure Initiative As a Senior Program Manager for GTI’s intelligent infrastructure initiative, Jim Marean leads efforts to assess and articulate natural gas’ role and value as part of the smart energy grid. In 2011 Jim co-authored a white paper (available on the GTI website) with Navigant Consulting titled Natural Gas in a Smart Energy Future which provides a compelling vision for the natural gas industry through 2030 and beyond. Marean comes to GTI from New York State Electric and Gas (NYSEG), where he spent 30 years in positions of increasing responsibility. His background includes a variety of management and technical research responsibilities. He has wide-ranging experience with distribution engineering, natural gas and compressed air energy storage evaluation, alternative fuel and natural gas vehicles, environmental matters and manufactured gas plant investigation and remediation strategies. Most recently at NYSEG he managed a large technical support services team, with significant focus on new innovations in technology and demonstration deployment. He has specific expertise in smart energy grid technology, geographic information systems and data mapping, bio-methane to pipeline quality, and exploration of new energy sources like wind and solar technologies. He has held positions on the Board of Directors for Operations Technology Development (OTD) and Utilization Technology Development (UTD). Marean earned a B.S. degree in Wildlife Biology and an M.S. in Fisheries Biology from SUNY Environmental Science & Forestry, and an M.S. in Science Education from Syracuse University.

Cross Bore Program Cross Bore Best Practices Guide - single source of information for natural gas operators to investigate and remediate existing cross bores as well as prevent future cross bores Outreach and Education Program - information to effect positive changes in attitude, practices and operations. Cross Bore Database - A national database of damages and incidents to assist in identifying trends. New Developments – Acoustic Pipe Locator, Cross Bore Detection, Obstacle Detection Best Practices Guide OTD Project 1.11.d, GTI Project 21178 Issued January, 2011 The development of this Guide included the review of information from a wide variety of sources across North American (excluding Mexico) including numerous natural gas distribution companies that were either individual companies or multiple companies as part of a larger holding company referred to here as Local Distribution Companies (LDCs), installation contractors, remediation contractors, equipment providers, industry associations and industry literature. The combined customer base of the 23 LDCs interviewed represent 80% of the 75 million natural gas customers in the United States and Canada. The information included in this Guide summarizes the best practices to investigate and remediate existing cross bores and to avoid future cross bores during the process of installing new mains and services. Specific conversations and company specific documents have been kept confidential unless the information is in the public domain or a release has been provided by the company. 84 Pages Outreach & Education Program – Phase 2 of OTD/GTI Best Practices Projects To develop an outreach program to raise awareness and streamline implementation of cross bore best practices with natural gas system operators, other utility operators, the sewer and plumbing industry and the contractor community at large. This program will provide information to effect positive changes in attitudes, practices and operations related to cross bores. Cross Bore Database OTD Project 1.11.e, GTI Project 21186 Ongoing To develop a national database to address the cross bore issue in the natural gas industry. The national database will collect information from natural gas operators on damages and incidents to assist in identifying trends and gaining a better understanding of the scope of the cross bore threat.

Table of Contents Introduction to Cross Bore Regulatory Reactions Best Practices Tidbits and Observations Quick Guide Who to Involve Public Awareness Tailgate Briefings Documentation New Developments

Introduction to Cross Bores http://www.youtube.com/watch?v=g_dUMLSLYtw&feature=email or Library

Cross Bores – What are They and Why is There Concern? What is a sewer cross-bore? A sewer cross-bore is the inadvertent placement of a gas main or service through a sewer line. Cross-bores typically occur during trenchless construction. What can happen? A blockage may occur. Clearing the line may damage the gas line which could result in an explosion or fire. The terms sewer or sewer system are used exclusively throughout this Guide to represent both the sanitary and storm sewer systems, as well as private septic systems.

Types of Cross Bores Legacy Cross Bores Cross bore events that currently exist due to previous installations. Investigate using a risk-based approach that progresses from a review of records to a focused field investigation Future Cross Bores Cross bores that do not currently exist but may occur as new gas mains and services are installed. Items to Consider: First date when trenchless technology was used to install mains or services Do not assume that the lack of a natural gas services installation excludes a location

This is one scenario representing possible cross bore locations

Regulatory Reactions First Incident – Kenosha, WI 1976 Investigations Minnesota Department of Public Safety Alert

First Recorded Cross Bore Incident Kenosha, WI August 29, 1976 NTSB Recommendations Complete inspection of those locations along the construction route where gas mains and sewer laterals may be in proximity to one another and correct any deficiencies. Examine records to determine other locations where gas lines were installed near existing sewer facilities (including a review of sewer blockage complaints), then inspect these locations and take corrective action where necessary. Revise construction standards to require the underground facilities be located accurately before construction and to provide protection for these facilities near boring operations. Inform inspectors and supervisory personnel of the circumstances of this accident, train them to be alert for similar conditions, and advise them of preventive actions. NOTE: 2 deaths, 4 injuries The first recorded event was at a location that was not a natural gas customer The first recorded event was in 1976, over 36 years ago The full text of the NTSB recommendations can be found in Appendix A of the Guide. Or by going to the following - National Transportation Safety Board, Safety Recommendation(s), Pg. 76-83 through 76-86, Issued November 12, 1976. http://www.ntsb.gov/recs/letters/1976/P76_83_86.pdf

Cross Bore Investigative Results Minnesota Public Utilities Commission - 27 cross bores reported in a 6 month period Palo Alto, CA - 4 blocks inspected. 24 cross bores found City A - 2 cross bores per mile in 200 miles of sewer main, One cross bore at a school City B - 3 cross bores per mile of sewer main, One cross bore at a hospital City C - 2% cross bores out of 11,000 sewer laterals inspected Cross Safety Association – 2-3/mile of sewer main It was noted during the surveying of companies that when a cross bore is reported it is probable that others may have occurred in the same are due to similar utility installation practices or field conditions

Minnesota Department of Public Safety – Alert Notice May 10, 2010 - The Minnesota Office of Pipeline Safety (MNOPS) is now aware of at least 155 instances in Minnesota where gas pipelines were inadvertently installed through privately owned sewer service laterals due to trenchless construction techniques; MNOPS believes there are probably more. The majority of these “cross bores” were found by plumbers while cleaning sewer service laterals. Since 2000, six gas lines have been punctured by sewer cleaning contractors. On three occasions, the gas ignited, resulting in significant injuries and property damage. https://dps.mn.gov/divisions/ops/forms-documents/Documents/Alert%20Notice%2001-2010.pdf Use the link shown above for more information.

Tidbits and Observations Quick Guide Who to Involve Best Practices Tidbits and Observations Quick Guide Who to Involve

OTD Project Cross Bore Best Practices Sources – LDCs, Installation and Remediation Contractors, Equipment Providers, Industry Associations and Industry Literature http://www.otd- co.org/Documents/OTD_1_11_d_FinalReport_Nov2012_Public Version.pdf Guide provides information that can be used to investigate and remediate existing cross bores as well as prevent future cross bores. The combined customer base of the 23 LDCs interviewed represent 80% of the 75 million natural gas customers in the United States and Canada. The first section of the Guide provides best practices and general guidelines for LDCs on the cross bore topic. The second section of the Guide provides best practices for addressing cross bore events that currently exist due to previous installations, referred to in the Guide as legacy installations or legacy cross bores. The third section of the Guide is focused on preventing cross bores during new installations. The Guide also provides contact information for organizations with additional information and a series of appendices that provide the full text of the NTSB summary of the first incident investigation in 1976, examples of a wide variety of communications and education materials, a summary of cross bore related legislation and regulations and a summary of technologies under evaluation for further development to detect if a transaction of a sewer line has taken place as part of a new installation.

Tidbits and Observations (1) Interviewed 23 LDC’s Regional Differences in the Approach Used to Assess Likelihood of a full basement or the need to construct the sewer at a depth to be below the level of frost penetration Soil conditions The influence of existing or proposed legislation The use of the One-Call System or Call Before You Clear programs The use of bi-lingual outreach materials A "found" cross bore was the best indicator that there may be others in the immediate area

Tidbits and Observations (2) Legacy Program Status – of 23 Companies 9 (~39%) have a legacy program in place 4 (~17%) are developing a legacy program 3 (~13%) do not have a legacy program but are exploring the option 7 (~30%) do not have a legacy program Legacy Program - Change in Process 4 of 23 companies made a process change that facilitates inspection or discovery of legacy cross bores Most Beneficial Changes Collaborative effort with the sewer operators Separate department or an integrated team with a common goal, focus, and awareness The terms sewer or sewer system are used exclusively throughout this Guide to represent both the sanitary and storm sewer systems, as well as private septic systems.

Best Practices – Quick Guide Organizational Commitment Support From Highest Level Compliance with All Regulations Dedicated Resources Common Goals Risk Based Approach Customer Type Lack of Natural Gas Service Does Not Excludes a Location Previous Claims or Incident Reports Attributes with Higher Probability Auditable Record Keeping System Operating Procedures and Training Specific to Cross Bores Include in DIMP Coordinate With One Call Systems Use a GIS Risk Based Approach A cross bore to a sewer serving a home or business can occur regardless of whether the structure is served by natural gas, the two systems are independent. The first recorded incident in 1976 in Kenosha, WI was an example of an incident of this type.

Legacy Cross Bores

Who Should Be Involved - Internal Executive Management Regulatory Affairs Finance and Accounting Public Relations Training Customer Service Call Center Reps Dispatch Operators Field Operations Engineering Construction General Utility Personnel

Who Should Be Involved - External Customers and Premise Owners Bill Inserts Direct Mailings Door Hangers Sewer Tags Outgoing Calls Media Municipal Gov’t and Sewer Owner/Oper. One-Call System Other Utilities Contractors Plumbers Equipment Rental Owners First Responders Regulatory Agencies

Public Awareness

Cross Bore Public Awareness Increase awareness of the hazards associated with gas/sewer conflicts Plumbing and sewer cleaning contractors Equipment rental companies Customers Safety DVD Bill inserts, advertisements, news media, online The terms sewer or sewer system are used exclusively throughout this Guide to represent both the sanitary and storm sewer systems, as well as private septic systems. Could use your help to identify one or more topics for a How-To Video

Public Awareness Example

Public Awareness – Door Hanger Examples

Public Awareness – Sewer Tag Example

Awareness Tailgate Briefings Documentation Gas Operations Awareness Tailgate Briefings Documentation

Sewer Cross-Bore Awareness for Gas Operations What is a sewer cross-bore? The inadvertent placement of a gas main or service through a sewer line. Sewer cross-bores typically occur during trenchless construction. What can happen as a result of a sewer cross-bore? The sewer line may become blocked and need to be cleared with mechanical clearing tools. This may cause the gas line to be cut which could cause an explosion or fire. How can I avoid causing a sewer cross-bore? Excavating and locating sewer lines in advance of trenchless construction. What do I do if I discover a sewer cross-bore? Relocate the gas line and properly repair the sewer line. If you discover any other utility’s cross-bore, notify the building owner and the other utility. What do I do if I damage a sewer line? Ensure that it is repaired properly.

Tailgate Briefing – Existing/Legacy Visual Tolerance/Safety Zone Around Sewer Minimum 2 Ft/0.6 m Horizontal 1 Ft/ 0.3 m Vertical Do Not Assume Depth or Location of Any Facility Use Locating Tools to Pinpoint Sewer & Natural Gas Lines Use Sewer Camera to Verify No Cross Bores Hand Dig/Pothole Each Cross Point to Verify Location of Facilities Repair All Cross Bores Before Leaving Site Schedule Repair of Intersected Facilities Schedule Property Restoration Establish a tolerance/safety zone with a minimum clearance of 2 foot/0.6 meters horizontal and 1 foot/0.3 meters vertical based on sewer and natural gas mark-outs Do not assume the depth or location of any facility, use locating tools to pinpoint the sewer and natural gas lines Use a sewer camera to verify no cross bores occurred, or Hand dig/pothole at each cross point or parallel construction within the tolerance zone to verify location of natural gas and sewer lines Repair all cross bores prior to leaving the site Schedule repair of intersected facilities and property restoration

Tailgate Briefing – New/Replacement Contact One Call or Sewer Operator Visual Tolerance/Safety Zone Around Sewer 2 Foot/0.6 Meters Horizontal 1 Foot/0.3 Meters Vertical Do Not “Blind Bore” or Assume Location of Other Facilities Measure, Calculate, Locate and Expose Use a Sonde or Camera – Pre and Post Installation Hand Dig Pothole(s) at Each Crossing Point or Parallel Construction Observe Bore Passing Cross Points and Reamer During Pull Back Report and Repair All Cross Bores Before Leaving Site Schedule Repairs of Damage Facilities Schedule Property Restoration Tolerance Zone Establish a tolerance/safety zone with a minimum clearance of 2 foot/0.6 meters horizontal and 1 foot/0.3 meters vertical based on sewer mark-outs Do not “blind bore” or assume the depth or location of any facility, use locating tools to pinpoint the sewer lines Use a camera for pre and post installation inspection to establish the condition of the sewer prior to installation and to verify no cross bores occurred during the installation, or Hand dig/pothole at each potential cross point or parallel construction within the tolerance zone Observe/verify location of natural gas and sewer lines Repair all cross bores identified during post installation inspection prior to leaving the site Schedule repair of intersected facilities and property restoration

New/Replacement Documentation If trenchless methods are used records should be kept of the decisions made by the crew or supervisor Indicate the number of sewer laterals cleared of conflict Use a sewer crossing verification summary on an “as-built” drawing or an electronic job record Sign and date the document

Sewer Crossing Verification

Customer Service Representative or Dispatcher Quick Reference

CSR or Dispatch Operator - Quick Reference Flowchart Sign of a Natural Gas Leak – Odor, Hissing Sound, Bubbles in Standing Water – Toilet? Yes or Unknown Instructions to Caller Stop Work Exit Building DO NOT turn on/off any device, light a match or do anything that could cause a spark Move 150 feet away, wait for utility Rep. Collect Data Once Caller is in Safe Location Issue order to Investigate – Class 1 Leak No Clog/Blockage Inside or Outside Building? Inside – Not a Natural Gas Issue Outside Wait for Utility Rep. Collect Data From Caller Issue Order to Investigate - Class 1 Leak CSR’s/Dispatchers are often the first point of contact Need training on the topic which should be company specific Procedures for handling a call should be clear and concise Example here shows a flowchart that would be accompanied by questions prepared in more than one language as appropriate for the service territory Depending on the status of the legacy investigation within the company it may be possible for the CSR to “clear” (determine there is no conflict) the affected address via the companies GIS cross bore database Data to be collected and information to be verified during the call would include: Address of the premise to be investigated Home phone number Callers name Access arrangements A phone number where the caller can be reached

New Developments

Acoustic Pipe Locator Need/Benefits: Locate gas distribution pipes with emphasize on detecting plastic pipes 300,000 miles of plastic pipes without tracer wires in US alone 500,000 to one million miles of plastic pipes without tracer wires in the world Tracer wires prone to damage/corrosion Increases miles of plastic pipes to be detected 60%+ damage by third party Direct implications on operating cost and safety Water and sewer lines Requirements: No special coupling liquids Use of same transducers for expected field conditions (dirt, grass, concrete, asphalt, etc.) Simple to operate and immediate results Pipe(s) display for locator/surveyor Cost-effective

OTD Project Acoustic Pipe Locator Display Ultra-Trac APL Technology licensed to Sensit Technologies http://www.gasleaksensor s.com/products/ultra-trac- acoustic-pipe-locator.html

OTD Project Mechanical Spring - Cross Bore Detection Goal - a tool that will detect a hit to sewer laterals during the HDD or mole installation of PE gas pipe. The tool uses a low-cost, easy to use mechanical spring system attached to the HDD/mole head during drilling or to the PE pipe during pullback. The spring system is activated inside the sewer pipe void; locating the lateral and providing a real-time alarm identifying a hit.

OTD Project Mechanical Spring - Cross Bore Detection Milestone Achieved: Completed design of Prototype C (4- inch diameter unit) Next Step: Address new design options for the smaller diameter units (Prototype D) Complete IP-patent issue, contact HDD contractors Coordinate with contractor, run test at GTI Expected Deliverable/Format: Refine design with HDD contractors Contact: Michael Adamo …….

OTD Project Mechanical Spring - Schematic Design

OTD Project Mechanical Spring - Cross Bore Detection Prototype B (direct signal to surface) Prototype A (no electronics) Prototype C (Signal stored in device)

OTD Project Obstacle Detection During HDD Requirements: Detect obstacles in advance of HDD operations Sense both ahead of and adjacent to the drill bore Data acquisition and display must be rapid Simple display; Real time processing and display Projects: Acoustic-based technology; Sensors on the ground GPR-based technology; Sensors incorporated in the drill head Status: Acoustic technology provided detection of pipes about 20 ft. in front of drill head; Applicable for most soils; Requires improved accuracy/repeatability GPR technology detects pipes in close proximity; Good accuracy; Requires increase in pipe detection range; Issue on applicability in different soils Both projects running in parallel; Potential to combine efforts into one system; Very challenging projects OTD and GTI Confidential 41

Sources of Additional Information