What’s Happening? What’s happening in Tysons? A lot!

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Planning for New Neighborhoods linked to Transit: Santa Monica’s
Emphasizing TDM in Transportation Planning Asher Mercer TDM Summit November 18, 2009.
Steel Valley Intergovernmental Initiative: The Boroughs of Homestead, West Homestead and Munhall.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
Putting TDM in TOD Dulles Area Transportation Association & Dulles Corridor Rail Association Transit Oriented Development (TOD) Session 3: Making TOD Work.
Noor Ismail, AICP, Director of City Planning Joy Abbott, Assistant Director, Strategic Planning Division Corey Layman, Senior Planner Stephen Patchan,
12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
July 19, Horizon West Area 28,000 Gross Acres Six (6) Planned Villages / Communities Includes one (1) Town Center ~41,000 Planned Households.
Module 7 STATION AREA PLANNING. Module 7 Station Area Planning Introduction This is one of seven Transit Oriented Development training modules developed.
OLDE TOWN ARVADA TOD Community Meeting November 13, 2013 Olde Town TOD.
Community Meeting Olmsted Township Comprehensive Land Use Plan Update PLANNING TODAY TO ACHIEVE OUR HOPES FOR TOMORROW May 21, 2012.
400 North Orange Avenue Orlando, FL
Presentation will begin at 6:00 P.M. Welcome to the LYNX Blue Line Extension Transit Station Area Plans Kickoff Meeting!
Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
Advisory Committee Meeting #3 July 17, :30 p.m. Downtown Livability Initiative.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
1. 2 o Initial Affordable Housing Ordinance adopted in 1997 o Community College District Ordinance adopted in 2000 required 15% affordable housing. o.
TOD Toolkit: TOD potential at the Hi-Lake Station along Hiawatha Corridor Developed by Support from WORKING DRAFT.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
9 th & Colorado Proposed Urban Redevelopment Area 1 Land Use, Transportation & Infrastructure Council Committee June 4, 2013.
TYSONS THE AUDACITY OF CHANGE
Twinbrook Sector Plan A New Community in the Technology Corridor
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Markham Centre TDM and Land Development Case Study ACT Canada – TDM Summit October 21, 2008.
City of Fitchburg, WISAA Design Group + Teska +Montgomery NORTH STONER PRAIRIE NEIGHBORHOOD PLAN Steering Committee Workshop: Plan Vision, Principles,
Sustainable Community Principles and Air Quality 2010 East/Southeast Fort Worth Economic Development Summit September 17, 2010 Carl E. Edlund, P.E. Director,
Comprehensive Plan for Tysons Corner 1. 2 Land Use Categories 1.Transit Station Mixed Use: the overall percentage of office uses throughout all of the.
VISION FOR A KEARNY TOD February 27, 2008 Rob Lane Regional Plan Association.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Part II: Case Studies 1.Arlington, VA: Transit-oriented Development Boosts Economy County-wide. 2.Portland, OR: Streetcar Increases Investment and Redevelopment.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
Land Use Benefit/Cost Transit Slides. Development – Sprawl – Traffic – Roads An Important Local Issue In America  “What do you think is the most important.
Land Use Study for the Community of Winchester May 21, 2012.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
Economic Development and Placemaking. New Urbanism Since World War II, cities have been spreading ever-outward. Strip malls, parking lots, highways, and.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Mueller Redevelopment
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
City of Carrollton Transit Oriented Development January 5, 2008 Peter J. Braster TOD Manager.
Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008.
1. 2 Which attributes make a community successful?
Urban Design and Transportation Creating options and opportunities.
Board of County Commissioners Second Public Hearing August 10, /10/
Railroad Ave eBART Station Area Specific Plan TOD MarketPlace, September 29, 2006 C I T Y O F P I T T S B U R G.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
The Concept for City Center – The Power of TOD TOD Advisory Committee Meeting 3 December 10, 2009 The Premier Place for a Premier City.
Form & Function of Metropolitan America WALKABLE URBAN DRIVABLE SUB-URBAN WALKUPS: (Walkable Urban Places) DRVABLE EDGE CITIES WALKABLE NEIGHBORHOODS.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
planning and zoning committee presentation September 19, 2016
Council for Quality Growth North Fulton Advisory Meeting
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Presentation to Brookhaven City Council
Recommendations on Parking Requirements in Transit Oriented Development (TOD) Areas Outside Tysons TRANSPORTATION ADVISORY COMMISSION July 16, 2013 This.
Planning for New Neighborhoods linked to Transit: Santa Monica’s
WWPNA General Member Meeting October 16, 2018
Presentation transcript:

Transforming Tysons Barbara Byron Office of Community Revitalization Fairfax County, Virginia September 16, 2014

What’s Happening? What’s happening in Tysons? A lot! 2005 – Planning for Tysons with Silver Line Begun Task Force representing full spectrum of stakeholders 100+ public workshops, outreach sessions and public hearings Over 4 years discussion about “what Tysons should be” Resulted in shared community plan for Tysons 2010 – Tysons Plan Amendment Adopted Moved into implementation phase Creating new ways to make the community vision for Tysons happen 2014 – Visual Transformation of Tysons Evident The Silver Line is open Developments have been approved Development activity is occurring The Plan is happening! 2005 -- Discuss some of the planning background (earlier plans had rail/no rail options) 2010 – mention staff changes (core team, dedicated site plan reviewers, exploration of urban development) 2014 --

Vision for Tysons A Livable Urban Center Multi-modal transportation options Focus on urban design and the pedestrian realm Transportation infrastructure coordinated with development Improved jobs/housing balance 200,000 jobs; 100,000 residents Growth focused at Metro (75% of growth within 1/2 mile) This is to just sort of throw up on the screen what topics you’ll cover more as follows 2

Tysons Today Economic engine of No. Va. 12th largest CBD in U.S. 49 million sq. ft. of development 28 million sq. ft. of office 12 million sq. ft. of residential 6 million sq. ft. of retail 3 million hotel, industrial, car dealerships, etc. Poor jobs/housing balance with 105,000 jobs/17,000 residents 167,000 parking spaces Lack of parks, public facilities Auto-oriented, single-use pattern CHANGE FROM 2010 – APPROX 2 million more development overall 1 million more office 1 million more residential 1 million more retail 1 million LESS etc. (hotel / industrial / auto dealers +) Image source: Fairfax County EDA 3

Tysons Today New development primarily a mix of residential and office Near term market appears to favor residential products Current residential focus is rental apartments Owner-occupied on horizon 12th largest business district in the U.S. and largest outside of a central city More office space that Downtown Denver, Cleveland, Baltimore, or Atlanta. Wasn’t planned for lots of residential, so parks and public facilities were not a significant part of earlier planning efforts Image source: Fairfax County EDA 4

Implementing the Vision 19 rail-related development applications have been approved to date: 13 million sq. ft. of office 15 million sq. ft. of residential 2 million sq. ft. of retail and hotel (in addition to what is existing and under construction today) 9 additional rail-related development applications under review 4 million sq. ft. of office 8 million sq. ft. of residential 1 million sq. ft. of retail and hotel If all are built:  93M sq. ft. total development in Tysons An increase of over 23,600 residential units An increase in the ratio of non-residential to residential from 3:1 to 3:2 Today 10,000 residential units 5

Vision: People-Focused Urban Setting A place people want to live, work and play A new grid of streets to break up superblocks into pedestrian scale Urban standards for buildings, services, roads, public facilities and infrastructure Incorporation of parks, public facilities, cultural and institutional uses Tysons today has a Image source: PB PlaceMaking 6

Vision: Focus Density/Improve Use Mix TOD development pattern: Focus density at metro stations - 1/8 and 1/4 mile rings have no maximum FAR 1/3 and 1/2 mile rings planned for 2.0 - 2.5 FAR Orange areas are assigned specific densities in the Plan, up to 1.8 FAR plus bonuses Yellow areas are planned for low densities to provide a transition to the surrounding neighborhoods

Shift in Employment and Housing 2011 2050 Red Dot = 50 Employees Blue Dot = 50 Residents

Vision: Quality Urban Design Tysons Corner Urban Design Guidelines; endorsed by BOS in 2011 Integral part of all recent applications design Support the transition from an auto-oriented suburban place into a cohesive, functional, pedestrian-oriented and memorable urban destination

Vision: Parks and Active Rec Concept Parks Plan for Tysons; update to concept in Comprehensive Plan “Green network” will be public and private: small urban pocket parks, civic plazas and common greens, two large central parks 90 acres of parkland in Tysons today Additional 50 acres have been proffered via approved applications 3.5 new athletic fields have been proffered via approved applications New residents in high-density environments– parks will be essential. Plan sets a hierarchy of urban parks modeled on successful park standards in cities like Seattle and New York. Also a need for athletic fields, but since land is at a premium, we are looking at creative strategies like rooftop fields. Currently have commitments for 3.5 athletic fields approved, plus 2 confirmed in current cases, working with the rest of the applicants Image source: LCOR/WDG Architecture; 10

Vision: Public Facilities 6 existing public facilities within Tysons Additional facilities needed to meet new demands resulting from development Fairfax has been aggressive in securing facilities with development applications Existing Facility (1) Fire Station #29 (2) Dominion Power Electrical Substation (3) U.S. Post Office (4) Fairfax Water Storage Tank (5) Tysons Corner Center Community Space (6) Westgate Elementary School Proffered Facility (7) Replace Fire Station #29 (8) Arts Office & Funding (9) New Elementary School (10) Community Center (11) New Fire Station (12) College/Community Space (13) Indoor Recreation Space Additional commitments for facilities include: a new fire station, a relocated fire station, a new elementary school site, a community center, and education and indoor recreation spaces 11

Vision: Increase Transportation Options Fundamental to success of Tysons Multi-modal Urban Standards Multifaceted public/private funding plan Construction with development Road fund contributions Tax District Federal, State and Local funds 12

Transit - Metrorail Silver Line Metrorail Silver Line opened for service on July 26, 2014 Other transit options adjusted, including Fairfax Connector and Metrobus Tysons Circulator Pedestrian access improvements for key links to Metro 13

Smaller, walkable, human-scale blocks Improved Road Network 2010 2050 In addition, larger transportation improvements are in design. The first large project to be completed will be the Jones Branch Connector, a new multi-use crossing over I-495. Tysons “super-blocks Smaller, walkable, human-scale blocks An urban street grid = pedestrian scale, more choices for vehicles, bicycles and pedestrians Intersection improvements in surrounding neighborhoods

Greater Accessibility in Tysons Facilities for pedestrians, bikes, transit vehicles, and cars currently 2.7 mi of bike lanes and shared use paths propose 57.7 mi by 2050 Expanded bicycle network and bicycle parking requirements Ashgrove Trail – complete Vesper Trail – in design Sidewalks included in all new developments currently 47mi of sidewalks critical links of up to 7.5 mi to be added, plus new street sidewalks TMSAM projects – 11/41 completed to date. County has allocated $21.7M for these projects 15

2014 Building Deliveries In 2014, three major buildings were delivered: The Ascent at Spring Hill (404 unit, high-rise residential) First building constructed under the new Plan and Zoning District Tysons Tower (526,000 sq. ft. office) Largest in Tysons since 2002 Ovation at Park Crest (231 unit, high-rise residential) 16

Under Construction There are 7 buildings currently under construction: Two residential buildings with 890 units total (1M sq. ft. total) Retail expansion of the Tysons Corner Center (37M sq. ft. total) Hyatt Regency hotel at Tysons Corner Center (252M sq. ft. total) 3 additional office buildings (1M sq. ft. total) Anticipate an additional 6 buildings will begin construction within 12 months 17

Community Building Tysons Partnership: Partner in implementing the Vision 18