O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Evaluation of Mitigation Effectiveness at Hydropower Projects: Fish Passage James M. Loar.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Números.
JavaScript: Functions
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
EuroCondens SGB E.
Worksheets.
Climate Prediction Applications Science Workshop
Prepared by: ACTION Registry-GWTG Results: January – December, 2008.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
Grande Ronde Supplementation Lostine River: Operation and Maintenance and Monitoring and Evaluation Sponsor: Nez Perce Tribe Project Number:
Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Project No Tara White, Shannon Jewett, Josh Hanson,
1 When you see… Find the zeros You think…. 2 To find the zeros...
Jeopardy General Compare & Order AdditionSubtraction Vocabulary Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
NTDB ® Annual Report 2010 © American College of Surgeons All Rights Reserved Worldwide National Trauma Data Bank 2010 Annual Report.
We need a common denominator to add these fractions.
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Regional Routing Model Review: C) Model Formulation and Scenario Analysis Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program.
Regional Routing Model Review Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program Review December 12, 2005 Washington DC.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
0 - 0.
1 1  1 =.
Addition Facts
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 Building Data Entry Issues in NEAT/MHEA and Oak Ridge National.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
The basics for simulations
Connecticut Mastery Test (CMT) and the Connecticut Academic Achievement Test (CAPT) Spring 2013 Presented to the Guilford Board of Education September.
Fish Passage Effectiveness Its Not Just Counting Fish Studies on the Deerfield River John Ragonese, FERC License Mgr. USGen New England Inc. FERC Fish.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 NPTS Transferability Project: A Feasibility Study P. Hu, T. Reuscher, R. Schmoyer Oak.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Chapter 1: Expressions, Equations, & Inequalities
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
SCOH Technical Meeting October 18,  Why the new approach?  Risk-based Project Involvement  Required Project Actions  Compliance Assessment Program.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
DSS Decision Support System Tutorial: An Instructional Tool for Using the DSS.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Addition 1’s to 20.
Subtraction: Adding UP
Test B, 100 Subtraction Facts
Upstream and Downstream Passage of American Eels at the Medway Project, Penobscot River, Maine Scott Hall ————————————— PPL Maine, LLC Milford, Maine Steve.
Week 1.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
SCOPE CREEP IN LICENSE IMPLEMENTATION  Root Causes Ambiguous license terms/plans Ambiguous license terms/plans Changing social values Changing social.
Fish Passage Lessons Learned on the Hudson River Hudson Valley Restoration Coordination Meeting Columbia Greene CC, Hudson, NY, Oct. 15, 2015 Curtis Orvis,
Presentation transcript:

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Evaluation of Mitigation Effectiveness at Hydropower Projects: Fish Passage James M. Loar Glenn F. Cada Environmental Sciences Division Oak Ridge National Laboratory FERC Fish Passage Workshop Alden Research Laboratory Holden, MA November 13, 2003

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Outline of Presentation  Introduction  Background  Purpose of study  Approach  Information sources  Description of database  Results  Measuring effectiveness  Upstream Fish Passage  Characterization  Effectiveness  Downstream Fish Passage  Characterization  Effectiveness  Effectiveness Monitoring Plans  Conclusions and Recommendations  Monitoring  Mitigation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 Background  Evaluation of mitigation effectiveness was included in the FERC strategic plan for complying with the Government Performance and Results Act of 1993  Present study is one of several FERC studies to evaluate the effectiveness of mitigation requirements included in FERC licenses  Shoreline management  Water quality  Fish passage  Recreation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 Purpose of Study  Assess the effectiveness of mitigation measures for upstream and downstream fish passage at projects licensed between 1987 and 2001  Improve FERC internal practices by ensuring that mitigation measures are both necessary and effective

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 Information Sources Primary: FERC eLibrary database (formerly FERRIS)  Effectiveness monitoring plans and reports submitted by licensees  Orders issued by Commission  Comment letters from resource agencies Secondary: Previous mitigation studies  DOE (1991, 1994)  Peer-reviewed journal articles

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 Description of Database: Number of Projects  213 projects with at least one fish passage requirement  Comprised 66% of the 324 projects that were licensed during the period  123 of the 213 projects had only the reservation of authority (Federal Power Act, Section 18)  90 projects consisting of 108 developments (=dams) constituted the actual database available for analysis

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 Geographical distribution of 213 projects with at least one license article that addressed fish passage

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 Regional summary of 108 hydropower developments with fish passage requirements in addition to Section 18 authority Region No. of Projects No. of Projects with Settlement Agreements FISH PASSAGE REQUIREMENTS Upstream Only Downstream Only Upstream and Downstream Effectiveness Monitoring Northeast (CT, MA, ME, NH, NY, VT) North Central (MI, WI) Northwest (AK, CA, ID, OR, WA) Southeast (GA,VA, WV) Total

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 Measuring Effectiveness  Used proportion of fish passed upstream or downstream  Requires an estimate of the population available for passage  Number of radiotagged fish released  Number of fish passed at downstream dam  Radiotagging most commonly employed to assess effectiveness of downstream fish passage

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 Characterization of Upstream Fish Passage Facilities  Mitigation required at 71 of the 108 developments (66%)  Only 40% of the fish passage facilities are installed (and 71% of these are located in the Northeast)  Northeast and Northwest regions together account for 94% of the installed upstream fish passage facilities  Most common installed facilities are lifts/locks and Denil fishways in the Northeast and pool-weir fishways in the Northwest

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 Effectiveness of Upstream Fish Passage  Adequate data to measure effectiveness were available for 3 of the 108 developments, all in the Northeast  No facilities installed at 52% of the developments  No effectiveness monitoring required at another 19%  5 of the 108 developments had fish counts but no estimate of the population available for passage  Effectiveness ranged from 45 to 67% for 3 anadromous species, based on counts at adjacent dams or mark-recapture study  All three facilities were lifts or locks  Effectiveness values are within the range stipulated in the management plan for American shad in the Connecticut River basin

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 Characterization of Downstream Fish Passage Facilities  Mitigation required at 96 of the 108 developments (89%)  Only 41% of the fish passage facilities are installed (and 76% of these are located in the Northeast)  Northeast and Northwest regions together account for 91% of the installed downstream fish passage facilities  Most common type of facility (installed and uninstalled) in both the Northeast and Northwest is a sluiceway

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 13 Effectiveness of Downstream Fish Passage  Adequate data to measure effectiveness were available for 11 of the 108 developments  Results available from 28 studies (93% in Northeast)  Radiotagging of Atlantic salmon smolts used to assess effectiveness at 7 of the 11 developments  Surface collection with conveyance below the dam was evaluated in 14 of the 28 tests (4 developments)  Same species and similar methods used  Effectiveness ranged from 17 to 78% across projects  Effectiveness highly variable between years at same project (e.g., 17-59% over 6 years; 17-63% over 4 years)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 14 Effectiveness of Downstream Fish Passage (cont’d)  Variability in river flow influenced results  Studies scheduled to avoid periods of spill where possible  Bypass effectiveness increased with reduced generating flow (bypass:intake flow ratio important)  Other methods of downstream fish passage were evaluated, but data on effectiveness were limited  Effectiveness of spill reached 100% following continuous design modifications over a 3-year period  Maximum effectiveness of sluices with louvers (72%) exceeded that of sluices without louvers (27%)  Effectiveness of angled bar racks not quantitatively assessed with anadromous species

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 15 Effectiveness Monitoring Plans  Requirement for 76 of the 108 developments (70%)  Emphasis on monitoring to determine mitigation effectiveness is relatively recent (past years)  Requirement has regional focus that reflects the importance of anadromous fish passage  76% of developments in Northeast  75% of developments in Northwest

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 Conclusions  Effectiveness has been quantitatively evaluated at relatively few projects  Most (at least 70%) licenses require effectiveness monitoring  Technology advancement depends upon knowledge gained from monitoring effectiveness of existing facilities  Criteria to assess the success of fish passage mitigation were generally not available  Greater variability in the effectiveness of downstream vs. upstream fish passage, reflecting the importance of flow (bypass, generation, spill) as a factor influencing downstream fish passage effectiveness  Upstream fish passage is a mature, well developed technology, but downstream fish passage remains more experimental in approach

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 17 Recommendations Monitoring  Requirements for fish passage should include an effectiveness monitoring plan  Duration of monitoring should be defined  Can use radiotagging to test effectiveness for 2-4 years, depending upon flow conditions  May want to continue counts of upstream fish passage (i.e., “monitoring only”) and report annually

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 18 Recommendations Mitigation  Additional information should be obtained on the most effective measures for downstream fish passage  Field applications of new technologies  Passage of resident fishes  Need well-defined performance criteria to provide an unambiguous measure of the success of fish passage mitigation