TASK B1 OVERVIEW Y.ONEL Y.ONEL DOE SITE VISIT Dec 10-11, 2001 I) E781 II) CMS FORWARD CALORIMETRY.

Slides:



Advertisements
Similar presentations
THE PHENIX/RHIC AND TOTEM/LHC EXPERIMENTS Status and Hungarian activities M. Csanád for PHENIX/Hu & TOTEM/Hu +
Advertisements

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CASTOR at CMS Enhancing Forward Physics
SIKKIM MANIPAL INSTITUTE OF TECHNOLOGY (SMIT) IN INDIA-CMS Gobinda C Mishra & Raman K Jha SMIT September 27-28, 2007 India-CMS Meeting, Delhi University,
Apostolos Tsirigotis HELYCON Hellenic Lyceum Cosmic Observatories Network a progress report Hellenic Open University, University of Patras, University.
Status of the  0  Experiment A. Gasparian NC A&T State University, Greensboro, NC for the PrimEx Collaboration Outline  Physics Motivation  PrimEx-I.
Basic Measurements: What do we want to measure? Prof. Robin D. Erbacher University of California, Davis References: R. Fernow, Introduction to Experimental.
Far forward angle physics at the LHC E. Norbeck and Y. Onel University of Iowa For the 24th Winter Workshop on Nuclear Dynamics South Padre Island
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Polarisation transfer in hyperon photoproduction near threshold Tom Jude D I Glazier, D P Watts The University of Edinburgh.
T.C. Jude D.I. Glazier, D.P. Watts The University of Edinburgh Strangeness Photoproduction At Threshold Energies.
Research at Jefferson Lab – K. A. Aniol, M.B. Epstein, D.J. Margaziotis What ? 1)Investigate the structure of nucleons and nuclei. 2)Determine at what.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
U.T. Arlington High Energy Physics Research Summary of Activities August 1, 2001.
October 16th 2000 NSERC Site Visit M. Lefebvre1 ATLAS at the University of Victoria M. Lefebvre NSERC Site Visit October 16th 2000 The ATLAS Experiment.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
1 TASK B1 OVERVIEW By YASAR ONEL The University of Iowa DOE SITE VISIT 2009 (fy10) I)CMS EXPERIMENT HCAL (HF) CALORIMETERHCAL (HF) CALORIMETER II)CDF EXPERIMENT.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
First Results of Curtis A. Meyer GlueX Spokesperson.
Hiroaki Ohnishi RIKEN For the J-PARC E15 collaboration A search for deeply bound kaonic nuclear states by in-flight 3 He(K -,n) reaction ストレンジネスとエキゾティクス・理論の課題.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
Task A1: Collider Physics Introduction Sally Seidel 29 November 2005.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
COMPASS FRC – November 29, COMPASS FRC Novembre 29, 2013 COMPASS – phase II MoU Technical Coordinator Preparations for 2014 run Publications.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
MICE CMPB Alain Blondel 1 Highlights on MICE.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
India in DØ Naba K Mondal Tata Institute, Mumbai.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Harvard Neutrino Group DoE Review August 21, 2006.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS HCAL at Fermilab Feb 6-8, 2003.
APS April2000 Meeting Ahmet Sedat Ayan Dept. of Physics & Astronomy University of Iowa.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA HF-RBX PRR CERN Apr 3-4, 2003.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Know How at LLR Ultra-granular calorimetry AFTER vs CHIC 1F. Fleuret - LLR11/05/ LPSC.
1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
STATUS OF COMPASS. /74 Status of the Collaboration MoU signatures Status of the run – Preparation – Run 18/11/2014COMPASS FRC - 17th meeting2 Outline.
Iowa PMT Test Station Ugur Akgun 1. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,2001.
Project Overview James Fast Pacific Northwest National Laboratory.
Analysis of    production ► Data taking ► Reaction identification ► Results for double polarization observable F ► Summary Based on data taken in the.
SELEX (SEGMENTED LARGE-X BARYON SPECTROMETER) Fermilab 96-97
News and Misc UPO Meeting Jan 16, 2012
HCAL M&O-B Budget CMS Finance Board
HF QUARTZ FIBER Y.Onel , J.P.Merlo, K.Cankocak, I.Dumanoglu, I.Schmidt and A.Penzo.
Strange Particle Production at the ZEUS detector
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
NA61 news and plans News from other labs/experiments
HE Calorimeter Upgrade Studies
HCAL Commissioning and Related Activities
HE Calorimeter Upgrade Studies
CMS Goal of the experiment
Preparation of the CLAS12 First Experiment Status and Time-Line
Presentation transcript:

TASK B1 OVERVIEW Y.ONEL Y.ONEL DOE SITE VISIT Dec 10-11, 2001 I) E781 II) CMS FORWARD CALORIMETRY

TEAM MEMBERS WHO CONTRIBUTED TO I or/and II U.AKGUN, GRADUATE STUDENT S.AYAN, GRADUATE STUDENT P.BRUECKNEN, QUARK-NET TEACHER M.KAYA, GRADUATE STUDENT (Ph.D 2001, Asst. Prof., Kars University, Turkey) A.KOCBAY, GRADUATE STUDENT E.MCCLIMENT, PROFESSOR M.MILLER, ELECTRONICS ENGINEER K.NELSON, GRADUATE STUDENT (Ph.D 1999, University of Alabama) Y.ONEL, PROFESSOR E.OZEL, GRADUATE STUDENT (M.Sc. 1998, University of Kansas) S.OZKORUCUKLU, GRADUATE STUDENT (Ph.D 2001, Asst. Prof., S.Demirel University, Turkey) P.POGODIN, GRADUATE STUDENT (Ph.D. 1999, Sun Computer Systems, California) I.SCHMIDT, MECHANICAL ENGINEER A.TAUKE, UNDERGRADUATE PRESIDENTIAL SCHOLAR (U of California, Santa Barbara)

NEW TEAM MEMBERS Alexi Mestvirishvili [Perugia, Italy/CERN] Ed Norbeck [CMS Heavy Ions] Chris Like [Quarknet Teacher] Ron Newland [Quarknet Teacher] Jonathan Olson, Undergraduate Student

I) E781 responsibilities A) HARDWARE M1 AND M3 SPECTROMETERS (NO DOE SUPPORT) SCIFI HODOSCOPE WITH MULTIANODE PMT'S ( NO DOE SUPPORT) M1 WAS CRUCIAL DETECTOR ( INCREASED CHARM PRODUCTION BY FACTOR 2) DETECTORS WORKED WELL (>95 % EFFICIENCY), MAINTAINED OVER TWO YEARS OF RUNNING PERIOD ( NO DOE SUPPORT) DRAFT NIM PAPERS (2) DRAFT PHYS REV. LETTERS PAPERS (3) B) ANALYSIS B) ANALYSIS SERVICE ANALYSIS (Akgun, Ayan, Kaya, Ozkorucuklu) PRODUCTION POLARIZATION OF THE  + WITH 800 GEV PROTONS ON CU AND BE TARGETS. P.POGODIN, PHD THESIS, 1999, (Y.ONEL, E.MCCLIMENT ADVISORS) (DRAFT PAPER IS READY AND SUBMITTED TO THE SELEX COMMITTEE)

E781 Setup

M1PWC&M1DC

Charm Plots

INCLUSIVE  0 POLARIZATION PRODUCED BY A 610 GEV  - BEAM K.NELSON, PHD THESIS, 1999, (E.MCCLIMENT,YONEL ADVISORS) (DRAFT PAPER IS READY AND SUBMITTED TO THE SELEX COMMITTEE) D s CHARGE ASYMMETRY OF STRANGE D s MESON PRODUCTION WITH HYPERON BEAM M. KAYA, Ph.D THESIS, 2001 (Y. ONEL ADVISOR) (DRAFT PAPER IS READY AND SUBMITTED TO THE SELEX COMMITTEE) K/л CHARGED K/л FLUX PRODUCTION RATIOS WITH , , AND p ON CARBON AND COPPER TARGETS S. OZKORUCUKLU, Ph.D THESIS, 2001 (Y. ONEL ADVISOR) MAGNETIC FIELD VALUES OF THE E781 SPECTROMETERS E.OZEL, M.SC THESIS DEC ANALYSIS OF 2 nd PASS DATA U. AKGUN, A. AYAN, A. KOCBAY (HAREWARE CMS, PHYSICS ANALYSIS E781) AKGUN AND AYAN HAVE PASSED “QUALIFIER” AND “ COMPS” AKGUN [LIFETIME MEASUREMENT ON  C +,  C 0,  C - ] AYAN [  C 0 PRODUCTION STUDIES]

Spin Physics with E781

 c +  c 0  c + &  c 0 Search in E781 Selex Experiment Monte Carlo study has been done for the decay following modes of  c 0 :  c 0   -  -  +  +  c 0   -  +  c +   0  -  +  +  c +   -  +  +  c +   +  -  + with  +  p +  0 with  +  p +  0 and  +  n 0  + and  +  n 0  + Reconstruction efficiencies have been calculated.

 c +  c 0  c + &  c 0 Search in E781 Selex Experiment  c +, Currently  -  +  + and  + K -  + decay channels for  c +,  -  + and  -  -  +  + decay channels for  c 0 are being studied. Lifetime calculations will be made for these events.

 c 0 Search in E781 Selex Experiment Monte Carlo study has been done for the decay following modes of  c 0 :  -  +  -  -  +  +  - K -  +  +  + K - K -  + Reconstruction efficiencies have been calculated.

 c 0 Search in E781 Selex Experiment Currently  - K -  +  + and  + K - K -  + decay channels are being studied.  -  + and  -  -  +  + channels will also be investigated.

II) CMS - HF IOWA HAS MAJOR MANAGEMENT AND CONSTRUCTION RESPONSIBILITIES IN THE CMS HF AND HB. MOU'S ARE SIGNED BETWEEN FERMILAB AND UI SOW'S ARE PREPARED FOR EACH YEAR USING LEHMAN APPROVED PROJECT FILES (MPO'S) Y.ONEL U.S COORDINATOR, USCMS EXEC.BOARD MEMBER AND PROJECT MANAGER FOR PHOTODETECTORS [L3] E.MCCLIMENT US TRIG/DAQ INSTITUTIONAL BOARD MEMBER SEVERAL PROTOTYPES HAVE BEEN BUILT AT IOWA PRIOR TO PPP1 [EM 96, RADDAM 98]

CMS HF PPP1 AT IOWA AND CERN ( APRIL-SEPTEMBER 99) TEST BEAM SEPT 99 ( SEVEN IOWA TEAM MEMBERS PARTICIPATED) INTERNATIONAL MILESTONE HF PRR FOR PMT AND FIBERS HF EDR MARCH 2001 HF ABSORBER PRODUCTION IN OCTOBER 2001 HF PROCUREMENT FOR PMT AND FIBERS BEGAN NOVEMBER 2001 (INTERNATIONAL MILESTONES) HF NEW SCHEDULE HF UI RESPONSIBILITIES (HF PHOTODETECTORS, INCLUDING PMT OPTICAL TEST STATIONS CONSTRUCTION AND TESTING, HF CALIBRATION SYSTEM (LED, SOURCE), HB LED, (1/2)HF OPTICS, (FIBERS QP), RADIATION DAMAGE, INTERGRATION ENGINEERING, AND INTERNATIONAL RELATIONS AND PHYSICS AND TRIGGER SIMULATIONS)

OTHER RELATED ACTIVITIES ANALYSIS OF TEST RUN DATA ANALYSIS OF RADDAM 98 TEST RUN DATA LED/PID -PD SYSTEM DEVELOPMENT FOR HF/HB RADIATION DAMAGE STUDIES ON SINGLE QUARTZ FIBERS AT LIL/CERN (IOWA TEST FACILITY-NO DOE FUNDS INITIALLY)

CMS DETECTORS

Higgs Search

Missing E t and η in HF

Raddam ‘98 Module

IOWA LIL-CERN Radiation Damage Facility

CMS-HF PPP1

HF READOUT BOX & OPTICS DESIGN

HF PUBLICATIONS 1- NIM A 406, , NIM A 408, , NIM A 411, 17-30, NIM A 409, , NUCL.PHYS B510,3-11, AIP, /98 7- NIM A (TO BE SUBMITTED) 8-SEVERAL CMS TECHNICAL NOTES MORE INFO AT IOWA HEP WEB PAGE:

Progress

quarknet