Underfrequency Load Shedding Assessment Report Kent Bolton January 30, 2014 JGC Meeting SLC, UT.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advanced Piloting Cruise Plot.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 24, 2013 Anaheim, CA.
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Operating Reserves --- Again A Discussion Primer
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
WECC JSIS Update Dmitry Kosterev, BPA.
Composite Load Model Implementation Update Craig Quist, PacifiCorp April 25-27, 2012 TSS Meeting.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Composite Load Model Implementation Update Craig Quist, PacifiCorp January 23-25, 2013 TSS Meeting.
Composite Load Model Implementation Update
Underfrequency Load Shedding Report
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
FREQUENCY LIMITS R-BC Workshop FREQUENCY LIMITS WECC PWG August 13, 2009.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2009 San Diego.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
MINAP: DATA HANDLING PROCEDURES & DATA ACCESS Data Management Group, 13 July 2009.
ZMQS ZMQS
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Beckett Energy Systems
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
VOORBLAD.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Operating Reserves Task Force
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
CUG Meeting June 3 – 5 Salt Lake City, UT
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Edwards Aquifer Forecasts for 2014 Jim Winterle—EAA modeling supervisor HCP Stakeholder Committee May 28,
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Project WECC-0100 Update Load Modeling Task Force
WECC Planning Committee Underfrequency Load Shedding Review Group Update March 25, & 26, 2014.
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

Underfrequency Load Shedding Assessment Report Kent Bolton January 30, 2014 JGC Meeting SLC, UT

2 UFLSTF formed in 2009 by PCC & OC o Review effectiveness of Plan Designed to arrest declining frequency Assist recovery of frequency after UFLS events Coordinated Plan

3 Coordinated Plan maintained since 1998 with last review in 2009 UFLS data base developed through PRC- 006-WECC-CRT-1 UFLS relay data consistent with WECC Base Case data Several simulations evaluated – frequency in each case returned to safe operating range Main Findings

4 Coordination exists within the Coordinated Plan Anti-stalling and overshoot in accordance with Coordinated Plan Main Findings, cont.

5 13hsp1aspring on-peak 13hs2summer on-peak 13ls1summer off-peak 14hw2winter on-peak 14lw1winter off-peak Base Cases

6 WECC-WI Island (WI) Canada Island (C) North Island (N) North Island w/o Alberta (NBF) North Island w/o Canada (NWC) AESO Island (A) BC Hydro Island (BF) South Island (S) Imperial Valley Island (IV) Mexico CFE Island (CF) Islands

7 San Diego Island (SD) San Diego Area Island w/ Mexico and Imperial Valley (SIC) San Diego Area Island w/ Imperial Valley (SDI) San Diego Area Island w/ Mexico (SDC) Impact of Variable generation Islands, cont.

8 Normal topologies exhibit successful demonstration of UFLS Including 25% imbalance cases, all frequencies recovered to > 58 Hz but not > 59.5 Hz 15-sec anti-stalling stage o Doesn’t increase recovery frequency 30-sec, 60-sec stages required? Results

9 Abnormal topology – September 2011 o San Diego, IV, CFE – 50% imports Variable Generation o Increased amounts impact freq. recovery Results, cont.

10 Coordinated Plan is adequate in safety-net use and application Increased use of anti-stall component WECC Base Case and program model should be reviewed Conclusions

11 Plot

12 Assure automatically switched reactive devices are modeled Assure voltage regulators and PSS are correctly represented Review gen settings to assure correct representation Continue to annually simulate island scenarios Recommendations

13 Load controller and governor settings in WECC base cases need review Review WECC base cases for accuracy under extreme events – long and short term Review initial stage load shedding and anti- stalling settings to determine if adjustments are necessary Recommendations, cont.

14 Review simulation results to determine if Coordinated Plan needs modification Review V/Hz results and determine a defined method for measurement of performance Include composite load model in next year’s assessment Recommendations, cont.

15 UFLSRG Mtg – SLC, Ut Feb , Data Request o GO Submittals due 6/1/14 o UFLS Entity Submittals due 7/1/14 Next Steps