1 TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June 11 2004 Gary S. Tarplee - Chair

2 2 Complete generator Automatic Voltage Regulator (AVR) Policy. Completed Complete Power System Stabilizer Design and Performance Criteria. Completed Complete review of 2002-2003 Disturbance Reports. 60% complete Update the following guidelines: Guidelines for Time Synchronization of Protection, Control and Monitoring. Underfrequency Load Shedding Relay Application Guide. Both have completed due process. Both will seek approval at Octobers OC meeting. Progress on 2004 TOS Goals

3 3 Automatic Voltage Regulator Policy Statement. Requires AVRs on all synchronous generators. 30 MVA and above new or existing units that are replacing their exciter shall be required to have high initial response excitation systems. AVR equipment shall be tested and calibrated in conjunction with the balance of the excitation system as often as necessary, but no less frequently than required by NERC/WECC Standards. Outlines minimum performance requirements. Completed due process and approved by TOS. OC Approval Items