Doc.: IEEE 802.11-14/0333r2 Submission July 2014 TGaj Editor Report for CC12 Jiamin Chen, HuaweiSlide 1 Date: 2014-07-14 Author:

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

The Fall Messier Marathon Guide
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
SKELETAL QUIZ 3.

/ /17 32/ / /
Reflection nurulquran.com.
EDA Lab. Dept. of Computer Engineering C. N. U. 1 FSM Structures Mealy, Moore and Combined Mealy/Moore outputs Figure 8.3.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Peter Grimm, DO Prostate Cancer Center of Seattle
RM WD-97 WD-101 WD-102 WD-124 a IIIh-H : RM110 (2.1) Hainan c agGY Ia-1 (2) Anhui agGY Ia-2 (3) agGY Ia WD-2 WD-8 WD-36 agGY Ia
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 When you see… Find the zeros You think…. 2 To find the zeros...
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
Chapter 12 – Data Structures
MM4A6c: Apply the law of sines and the law of cosines.
2002 Prentice Hall, Inc. All rights reserved. Outline 25.1Introduction 25.2Basic HTML Tables 25.3Intermediate HTML Tables and Formatting 25.4Basic HTML.
Look at This PowerPoint for help on you times tables
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
The Camo Bots Hiding Since Team Members Mr. Brian Landry - Advisor Mr. Patrick Farley - Advisor Mr. Marty OHora - Advisor Doug Yatsonsky.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Making Landmark or Friendly Numbers. Category 1 Designed to be one away from a landmark or friendly number.
Slide P- 1. Chapter P Prerequisites P.1 Real Numbers.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
11.0 Release Training Online Credit Unions: April 17, 2011 CU*NorthWest/CU*South: May 9, 2011 Self Processing CUs: May 9 & 10, 2011 Posted: April 8, 2011.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
1 Some Pitfalls in Testing … Japan Imports of Wheat US Pacific and Gulf Export Ports.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
Presentation transcript:

doc.: IEEE /0333r2 Submission July 2014 TGaj Editor Report for CC12 Jiamin Chen, HuaweiSlide 1 Date: Author:

doc.: IEEE /0333r2 Submission July 2014 Comment resolution on TGaj D0.01 (CC12) update 26 CIDs (out of 151 CIDs received from CC12) have been resolved and passed motion in March meeting: –19, 20, 21, 22, 24, 28, 29, 30, 31, 32, 65 (from11-14/0407r3, 11-14/0408r1) –116 (from 11-14/0445r1) –13, 63, 73, 76, 77, 79, 80, 81, 111,112, 113, 117, 133, 149 (from 11-14/0334r2) 86 CIDs(out of 151 CIDs received from CC12) have been resolved and passed motion in May meeting: –CID 1-12, CID 14-18, 23, 25, 34, 36, 39, 48, 54-58, 60-63, 69, 74, 75, 84, 88, 90-93, 95, 98, 100, 103, 106, 110, 122, 123, 126, , 148 (from 11-14/0503r2) –CID 72, 119, 128 (from 11-14/0508r4, 11-14/0509r3) –CID 82, 83, 85, 86, 87, 89, 94, 96, 97, 99, 101, 102, 104, 105, 107, 108, 109, 129, 131 (from 11-14/0506r3) –CID 146 (11-14/391r1 and 11-14/718r0) –CID 59, 64, 78, 121 (from 11-14/0715r1) These CIDs that passed motion have been incorporated into TGaj D0.2. Jiamin Chen, HuaweiSlide 2

doc.: IEEE /0333r2 Submission July 2014 Comment resolution on TGaj D0.01 (CC12) update Jiamin Chen, HuaweiSlide 3 31 CIDs (received from CC12) have been presented during the conference call held on June 12 th and July 1 st : –CID 127 (11-14/759r2), 144 (11-14/761r0), 145 (11-14/762r0), –CID 120(11-14/782r0), 150 (11-14/758r1), –CID 26, 27, 37, 38, 40-47, 49-53, 67-71, 114, 115, 118, 124 (11-14/786r0) 29 CIDs (received from CC12) will be presented and plan to pass motion in July meeting: –CID 120(11-14/782r1), CID127 (11-14/759r3), CID 150 (11-14/758r1) –CID 26, 27, 37, 38, 40-47, 49-53, 67-71, 114, 115, 118, 124 (11-14/786r1) 10 CIDs (received from CC12) are still outstanding : –33, 35, 66, 125, 130, 132, 142, 143, 147, 151

doc.: IEEE /0333r2 Submission July 2014 Thank You! Slide 4Jiamin Chen, Huawei

doc.: IEEE /0333r2 Submission July 2014 TGaj Editor Report for May 2014 Slide 5Jiamin Chen, Huawei

doc.: IEEE /0333r2 Submission July 2014 Comment resolution on TGaj D0.01 update 26 CIDs (out of a total of 151 received from CC12) were resolved and passed motion in March Beijing session: –19, 20, 21, 22, 24, 28, 29, 30, 31, 32, 65 (from11-14/0407r3, 11-14/0408r1) –116 (from 11-14/0445r1) –13, 63, 73, 76, 77, 79, 80, 81, 111,112, 113, 117, 133, 149 (from 11-14/0334r2) 2 CIDs were discussed but not motioned in March Beijing session : –127 (from 11-14/389r0 and 11-14/390r0), –146 (from 11-14/391r0) 80 CIDs were presented and discussed during the April 4 th conference call: –1, 2, 3, 4, 6, 7, 9, 10, 11, 12, 14, 15, 16, 18, 23, 25, 34, 36, 39, 48, 54, 55, 56, 57, 58, 60, 61, 63, 69, 74, 75, 84, 88, 90, 91, 92, 93, 95, 98, 100, 103, 106, 110, 123, 134, 135, 136, 137, 138, 139, 140, 141, 148, 122, 126, 5, 8, 17 (from r0) –72, 119, 128 (from 11-14/0508r1, 11-14/0509r1) –82, 83, 85, 86, 87, 89, 94, 96, 97, 99, 101, 102, 104, 105, 107, 108, 109, 129, 131 (from 11-14/0506r1) Jiamin Chen, HuaweiSlide 6

doc.: IEEE /0333r2 Submission July 2014 Comment resolution on TGaj D0.01 update Jiamin Chen, HuaweiSlide 7 CIDs will be updated during the May session: –6, 14, 58, 61, 62 (from 11-14/0503r2) –72, 119, 128 (from 11-14/0508r3, 11-14/0509r3) –146 (from11-14/0391r1) –83, 96, 99, 101, 102, 105, 108 (from 11-14/0506r2) 6 CIDs will have resolution proposed during the May session: –59, 64, 78, 121 (from 11-14/0715r1) –144 (from 11-14/0713r1) –145 (from 11-14/0714r1) 37 CIDs will be processed later: –26, 27, 33, 35, 37, 38, 40, 41, 42, 43, 44, 45, 46, 47, 49, 50, 51, 52, 53, 66, 67, 68, 70, 71, 114, 115, 118, 120, 124, 125, 130, 132, 142, 143, 147, 150, 151

doc.: IEEE /0333r2 Submission July 2014 TGaj Editor Report for March 2014 Slide 8Jiamin Chen, Huawei

doc.: IEEE /0333r2 Submission July 2014 TGaj draft specification update TGaj Draft 0.01 was approved as baseline for TGaj technical specification for 60GHz in January session TGaj Draft 0.01 is available at (members’ area of website): ‒ aft%20P802.11aj_D0.01.pdf aft%20P802.11aj_D0.01.pdf Slide 9Jiamin Chen, Huawei

doc.: IEEE /0333r2 Submission July 2014 Comment submission A WG Comment Collection (CC12) on TGaj Draft 0.01 was opened following the approval of D0.01 A total of 151 comments were received. Comment database document: /0332 –r0: Containing 141 comments from CC12 –r1: Added 10 late comments –r2: Added proposed comment resolutions, assignees Comments were classified into following groups: –68 editorial comments (ER) –19 General comments (GR) –64 Technical comments (TR) Slide 10Jiamin Chen, Huawei