B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum April 13, 2012 1:00 – 2:00 p.m. To participate.

Slides:



Advertisements
Similar presentations
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Advertisements

Market Support Generation Workshop October 2, 2000.
Renewable Energy and Energy Efficiency Program: Farm Bill Section 9006 Section 9006 Program : Rural Energy Efficiency Renewable Energy Projects May 9,
Modeling Work Group Discussion Points MWG Meeting June 6, 2011 Web Meeting.
WECC System Schedulers Meeting Las Vegas, Nevada, May 10 – 11, 2010.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
ACE Diversity Interchange (ADI)
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
1 Electricity Markets and Policy Group Energy Analysis Department Exploration of Resource and Transmission Expansion Decisions in the Western Renewable.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Still River Study Sponsored by Friends of the Lake Presented by Curtis Read November 17th, 2005.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
What is NAP? NAP is a program of the State of Indiana in which tax credits are distributed to eligible non profits for sale as a fundraising and capacity.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Probabilistic Volatility in the Western Interconnection Matthew Elkins.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
BC SUPPLY GAP: A REDEFINITION OF SELF- SUFFICIENCY 32 nd USAEE/IAEE Conference, Anchorage AK July 29, 2013.
New Jersey Board of Public Utilities (USA) World Forum on Energy Regulation Québec City, Canada May 15, 2012 Jeanne M. Fox, Commissioner.
End Simplify A. 13B. 147 C. 17D – 2(5)+7.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum June 15, :00 – 2:00 p.m. To participate.
August 2008 DOE Uranium Leasing Program 2008 Overview August 14, 2008 Steven R. Schiesswohl, Project Manager U.S. Department of Energy Office of Legacy.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
Electric System Reliability in a Post SONGS World.
Mi-Project Program Breakout Session MDIT/DMB. IT Supplier Forum Breakout Session: Mi-Project Program Mi-Project  Introductions  Diana Quintero, MDIT.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.
TMT Presentation March 31, 2010 Scott English Water Quality Program Manager NWD Reservoir Control Center.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Federal Columbia River Power System Operations Planning.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
Southwest Hydrometeorology Symposium Tempe, AZ September 28, 2011 Kevin Werner NWS Colorado Basin River Forecast Center : A Year of Extremes.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Company Information US Geothermal Inc. Founded in Idaho and based in Boise Publicly traded on TSX Venture Exchange - GTH and OTCBB - UGTH.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
CEC/CPUC Energy Storage Workshop LADWP Pumped Hydro John R. Dennis LADWP Director Power Planning & Development November 20,
PacifiCorp and CAISO Expanding Regional Energy Partnerships
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
Demand Response 2010 and Beyond April 28, 2011 Pete Pengilly.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Outline Background Study Assumptions Study Results To Do
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
Pacific Power Seismic Preparedness Update
Albeni Falls Dam Operations
Vetting the GENESYS Model
PCM (Production Cost Model) Data Work Group Webinar
National Weather Service Missouri Basin River Forecast Center Mid-West Electric Consumers Association Annual Meeting Water & Power Panel 11 December.
PCM (Production Cost Model) Data Work Group Webinar
Progress on Resource Adequacy Assessment for 2017
Base on maximum operating wind capacity at end of planning period
Presentation transcript:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum April 13, :00 – 2:00 p.m. To participate in the call please dial: (877) When prompted, enter access code:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 Hydro Operations Update The Federal Columbia River Power System is being operated for system wide flood control objectives. All reservoirs are drafting to meet their April 30 flood control objective. River Forecast Center’s Water Supply Forecast is million acre feet issued on April 12.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 Actions to manage overgeneration  Since 4/7 we have successfully acquired over 25,000 MWh of load under the Mid-C Spill Exchange agreement.  Positioning Banks Lake to have the maximum amount of pump load available.  Have moved non-essential generator and transmission maintenance outages out of May and June.  Coordinated spill on Willamette projects.  CGS has been reduced to 85% during periods when it was helpful to minimize spill.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 4 Weather and Streamflow

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 5 Balancing Authority Load and Total Wind, Hydro, and Thermal Generation

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 Transmission Updates  COI N>S 2950 MW:3/30 to 4/23 due to CAISO Round Mountain-Table Mountain 1 500kV.  PDCI N>S 2990 MW : At rated capacity next seven days except as noted above. 0 MW:4/14 and 4/15 HE 07 only due to LADWP testing.  NI S>N 1950 MW: Prescheduled forecast at or near capacity next seven days.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 Chart available on BPA’s Web site at:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 8 Chart available on BPA’s Web site at:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 9 Contact Information  To discuss within month commercial transactions, please contact Robert Johnson at (503) ,  To discuss prompt month and forward transactions, please contact Alex Spain at (503) or Mark Miller at (503)  For additional information on Oversupply, please contact: Project Manager: Nita Burbank - (503) , Public Engagement: Maryam Asgharian - (503) ,  Overgeneration Web site: