ROBOTIC TIGER P13029

Slides:



Advertisements
Similar presentations
Introduction to Pneumatic Components Build a Working Pneumatic Circuit
Advertisements

Nonlinear & Neural Networks LAB. PART State Reduction ( )
Fig. S1 Cytoplasm V c Periplasm V pp Microenvironment V e D pp AiAi A pp AeAe k IMOM * * * D.
LDK R Logics for Data and Knowledge Representation Exercises: First Order Logics (FOL) Originally by Alessandro Agostini and Fausto Giunchiglia Modified.
NEGpre-221 pre-222pre-221/222 NEG DMSO 100 nM Fulvestrant for 72h Figure S1. Cell morphology of MCF7 cells after treatment with fulvestrant, with or without.
Ryen W. White Microsoft Research Steven M. Drucker Microsoft Live Labs
Fig. S1 Fig. S1 Correlation between microarray and qRT-PCR expression analyses. The linear regression compares expression ratios of salinity to control.
WT GRX-V GRX-VI GRX-VII 12-day-old seedlings on MS medium20-day-old seedlings on soilrite Mature plants in pots Supplementary Fig. S1 Phenotype of wild-type.
Lexical Analysis Dragon Book: chapter 3.
Site Planning LA 222 King Abdulaziz University
Publish-Subscribe Approach to Social Annotation of News Top-k Publish-Subscribe for Social Annotation of News Joint work with: Maxim Gurevich (RelateIQ)
Engineer Training Machine Electrical Cabinet TJ8300 / TJ8500 Machine Electrical Cabinet (EC)
Crystal Free USB with mTouch Demonstration
OCR Nationals ICT – Unit 22 Task Overview You will be creating an audio clip of at least 30 seconds that mostly consists of audio you have recorded yourself.
Cell number (% vehicle control) cisplatin concentration (µM)gefitinib concentration (µM) cell number expression level (fluorescence intensity)
1 ARIN – KR Practical 2 OWL & Protégé Suresh Manandhar; Dimitar Kazakov.
1 Testing Stochastic Processes Through Reinforcement Learning François Laviolette Sami Zhioua Nips-Workshop December 9 th, 2006 Josée Desharnais.
The third MSG RAO Workshop E. Oriol-Pibernat MSG Mission Manager GIST, Exeter, 24 October 2006.
IMPACT PROJECT Flood Propagation Progress Review 2 nd Impact Workshop Mo i Rana, Norway September 12-13, 2002 Francisco Alcrudo University of Zaragoza.
descriptions, and instructions?
Compiler Construction LR(1) Rina Zviel-Girshin and Ohad Shacham School of Computer Science Tel-Aviv University.
Figure S1 – Calibration curve SEC ideal mode Protein Quantitation using various modes of HPLC l Grotefend, Kaminski, Wroblewitz, El Deeb, Kühn, Reichl,
1 A Systematic Review of Cross- vs. Within-Company Cost Estimation Studies Barbara Kitchenham Emilia Mendes Guilherme Travassos.
A B C FBG (mg/dl) ** PPAR  2 LacZ IB: PPAR  WAT Weight (g) ** Body Weight Change (g) * Uno et al.
© Ipsos MORI Paste co- brand logo here Young People in Scotland Survey School toilets Summary of findings for Scotland’s Commissioner for Children.
Scalable Points-to Analysis. Rupesh Nasre. Advisor: Prof. R. Govindarajan. Comprehensive Examination. Jun 22, 2009.
Agenda Review Problem Statement Customer Requirements
Amanda Neves URI Biomedical Engineering.  Fit of the prosthesis is extremely important for the comfort of the limb and prevent skin irritation or pain.
2007 FIRST Robotics Conference Pneumatic Power Presented by: Raul Olivera, WildStang
P15503 Electrophotographic Cascade Test Rig System Level Design Review Dalton MeadBridget Kearney Mike WarrenRuishi Shen Tom WossnerZack Foggetti.
ROBOTIC TIGER P13029
Air Muscle Robotic Tiger P Presentation Agenda Specs and Customer Needs Concept Summary Design Summary System Testing Results Successes and Failures.
 Consultant ◦ Mike Zona (Xerox)  Sponsor ◦ Dr. Lamkin-Kennard Chris Anderson, Jon Gibson, Kurt Stratton, Josh Koelle.
E3 Teacher Summer Research Program Aerospace Engineering Texas A & M University By Moses Z. Horton Ali A. Jafry Lesson Plans Algebra I & II.
“Develop a Scalable Robotic Limb that Accurately Models All Degrees of Freedom of the Fingers.”
Pneumatic Power FRC Conference 4/27/06
LABVIEW INTERFACE CONTROL LOGIC DESIGN FEATURES Pneumatic power source encapsulated by single connection Opposable muscles for full range of motion Independent.
Pneumatic Actuators Brief Overview Kunal Sinha Grad General Engineering EFR : 2 per min.
Bicycle Harvesting Waste Energy: Bicycle Power Generation MSD-I RIT-Systems Design Review Winter/Spring P12414 January 13, 2012 Group # P12414.
System Design Review P15007: Anti-Rollback Wheelchair
Physics 6A Work and Energy examples Prepared by Vince Zaccone For Campus Learning Assistance Services at UCSB.
 Consultant ◦ Mike Zona (Xerox)  Sponsor ◦ Dr. Lamkin-Kennard Chris Anderson, Jon Gibson, Kurt Stratton, Josh Koelle.
Team P14029: McKibben Muscle Robotic Fish
Vibration Isolation Overview Session 3 Examples. Choosing the right part Example.
Nick Dominesey Matthew Myers Michael Edson Ellie Sanford Chris Smith Jason Inman.
Underwater Robotic Fish Phase II: Buoyancy P15029 Project Summary The objective of this project is to create an underwater robot that looks and swims like.
Fluid Resistance.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND 1.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
ROBOTIC TIGER P13029
Motor Assisted Wheelchair Design Review 10/01/15.
Active Ankle-Foot Orthotic Air Muscle Tethered Team P13001 Nathan Couper, ME Bob Day, ME Patrick Renahan, IE Patrick Streeter, ME This material is based.
P16452 Active Reciprocating Compressor Valve Assembly System Review.
Week 3 Review Team P14029 McKibben Muscle Robotic Fish Zak Novak John Chiu Seaver Wrisley Felix Liu.
Date of download: 7/8/2016 Copyright © ASME. All rights reserved. From: An Approximate Formula to Calculate the Restoring and Damping Forces of an Air.
 Consultant ◦ Mike Zona (Xerox)  Sponsor ◦ Dr. Lamkin-Kennard Chris Anderson, Jon Gibson, Kurt Stratton, Josh Koelle.
Dr. Szlivka: Fluid Mechanics 7.1 ÓBUDA UNIVERSITY Dr. Ferenc Szlivka professor.
Planetary Lander PDR Team Name
Writing Product Requirements
Pneumatic Power FRC Conference 4/27/06
GE alternative and outcome
Equilibrate System upgrade
Self-Adjusting Jacket ECE 445 SP2017
Tub Lift Rev. 2 Dom Group
P08024 AIR MUSCLE ARTIFICIAL LIMB
Writing Product Requirements
Focuses for Long Jump Jared Vlastuin.
Wednesday, February 16, 4:00-6:00PM
Presentation transcript:

ROBOTIC TIGER P

Agenda Project Goals Legacy Projects Air Muscle Info Customer Needs Specs Functional Decomposition System Flow Chart Tiger Jump Dynamics Jump Logic Morphological Chart Concept Selection (Pugh) Tentative Parts List Kinetics Testing Theoretical Muscle Force Calculations 3D Modeling Feasibility Risk Assessment Schedule

Project Goals  The project goal is to create a robot that mimics a jumping tiger both dynamically and to a lesser extent, aesthetically  The jumping force is to be provided by air muscles

Legacy Projects  P08023/ Artificial Limb I/II  P Artificial Limb III  P Process Development for Air Muscles  P Biomimetic Crab  P12029 – Biomimetic Robo Ant

Air Muscles  Rubber tube inside of a braided mesh sleeve  Pressurized tube inflates causing the mesh to contract in length  Closely mimics biological muscles

Air Muscle Contraction 28% contraction at 49psi under 29lb load

Air Muscle Fill Speed.18s to reach 28% contraction Source:

Customer Needs Customer Need Importance (1 = high)Description CN11 Can jump forward a distance equal to at least the length of its body (only 1 jump required per tank fill) CN21Use air muscles to provide jumping force CN31Lands safely without damage CN42 Is ready to jump again after landing, without user adjustment of robot body or legs CN52Self-contained (on board power sources) CN62 Portable (small enough for one person to carry) CN72 Reasonable battery life; battery charging takes hours CN83Resemble a tiger CN93Controls do not yield a noticeable delay

Specifications SpecSourceMetric Unit of Measure Marginal Value Ideal Value Preferred Direction S1CN1Horizontal Jump DistanceFeet 1*body length 1.5*body lengthUp S2CN1,2Uses Air Muscles Binary Yes S3CN3Sliding Distance After LandingInches 3 2Down S4CN4,5Self-Contained Binary Yes S5CN3,6Overall WeightLbs5025 Down S6CN3,5,6Overall LengthFeet42Down S7CN3,5,6Overall HeightFeet21Down S8CN3,5,6Overall WidthFeet1 Down S9CN8Resemble a Tiger Percent80 100Up S10CN2Regulated Air Pressurepsi<60 Down S12CN9 Total Response Time to Jump Commands Down S13CN2,9Solenoid Response Timems5025Down S14CN2,9Muscle Fill Times Down S15CN2,7Battery Life # of Jumps50100Up S16CN2,8Four Actuated LegsBinary Yes S17CN4,5 Tank can be removed in 5 min, without toolsBinary Yes S18CN1,2,3,4 Allowable error in leg measurement/adjustmentDegrees31Down

Functional Decomposition

System Connections Battery/Tether Power Runs Compressor Air Energy from compressor is stored in tanks Pressure energy is converted into motion Air Muscles and Cables Moves hind legs for jumping action Leg Mechanism function simultaneously for Jumping motion Control system Designed for system (Lab View) Sends a Output through Wireless transmitter Output Changes the state of the Solenoid Valves Tiger Jumps Forward

Tiger Locomotion Using the average cat as a model, the muscular and skeletal systems were observed to get a basic idea of what muscles are involved in a feline jump with special attention given to the front and hind legs

Tiger Locomotion  Jumping force will come from the hind legs and lower back  Front legs will be used as shock absorbers for landing as well as getting the robot in position for each jump 1st 2nd 3rd Bracing for Impact

Air Muscle Layout Concept 1 Concept 3 Concept 2

Leg Design Overhang for cable attachment

Jump Logic Power On Reset Muscle Positions to normal Wait for Go Input Command Return Go? No Contract muscle Group 1 Yes Contract muscle Group 2 Wait for landing Sensor input Hold Release Muscles No Yes

Morphological Chart

Concept Generation ComponentCheapBaselineLight WeightSturdyGroup Opinion Air Supply single tank carbon fiber tankmultiple tankssingle tank Electrical source NiMH 2000 mAH lithium ion NiMH 2000 mAH Controller push button w/ delay tethered control push button w/ delay Transport no handles handlesno handle Base plateframe and plateframeframe and plate Base Material plasticsaluminumcarbon fibersteel plastics plate, aluminum tube Leg Material plasticsaluminumcomposit tubingsteelaluminum Joint Material plasticsaluminumplasticssteelplastics Housing Cover nonefiber glassnonecarbon fiberrapid prototyping

Pugh Chart ABCDE CheapBaselineLight WeightSturdyGroup Opinion Selection CriteriaWeightRating Weighted Score Rating Weighted Score Rating Weighted Score Rating Weighted Score Rating Weighted Score cost+/-313 DATUM technical risk+/ portability+/ land safely without damage +/ air capacity+/ reuses available parts yes/no weight+/ Total Score Rank24351

Tentative Parts List  Legacy parts used to reduce cost  Clippard Pneumatic parts Material/ItemNameQTYDescription/Part Number Air TankPaintball HPA Tank13000psi compressed air 48 cubic inches RegulatorRegulator for Paintball Tank1High pressure air regulator Solenoids 24V solenoids Manifolds Air Muscles Air Hose Used to connect muscles to manifold Air Fittings Tank to manifold connections Batteries24V 2000 mAhr NiMH Battery1Existing battery pack from previous projects ChargerTenergy Smart Charger V1Existing charger from previous projects ArduinoArduino Mega 25601Mouser 782-A Wiring Various electronic connections and wires

Kinetics  MATLAB simulation will yield required forces from air muscles  Simulation consists of two portions  Take off  Free flight

A quick rough test rig was set up (see video bellow) In order to see how muscles behave under loading (deflections, Inflation speeds, max force to failure) and also get a rough idea of what kind of forces and deflections we can get out of an air muscle, Much more testing to come Blue air muscle specs: Roughly.5” deflection 32 lbs till Failure (fitting pulled out) Preliminary Testing

Test Muscle Data Tested Air Muscle Dimensions\Information Tube and Mesh ConstructedTubeMesh Muscle Identity Uncompressed Length Compressed Length Dia. at Rest Max Dia.ODID Material Type ThicknessRest Dia. Contracted Dia. Orange Mesh Silicone RWB Mesh Silicone Red Mesh Silicone Tan Mesh Silicone Blue Mesh Rubber Theoretical Calculations Calculations Muscle Identity Weave Angle (degrees) Weave Angle (radians) Pressure (psi) Dia. at Rest εF Orange Mesh RWB Mesh Red Mesh Tan Mesh Blue Mesh

Theoretical Air Muscle Calcs Source:

Theoretical Air Muscle Calcs

3D Modeling Rendering 2: Legs and tiger design in a ready to jump position. Rendering 3: Concept in a fully extended position, just after jump initiation.

3D Modeling Rendering 1: Shows the right side view of the 3D modeled concept leg design.

Design Sensitivity Diagram: Shows dimensions used in design sensitivity analysis of leg joints. D R F

Design Sensitivity

Feasibility  Battery Life (continuous use, 2000mAh 24V NiMH)  L=battery life, I=current per solenoid  Force  Simplified linear actuator model  165lbs of force for 20lb robot to jump 1.6ft

Risk Assessment RiskEffectCause Chance of Occurri ng Severity Importan ce Action to Mitigate Long Lead Time Unable to complete robot construction due to lack of certain ordered parts. Natural for some unique parts. Poor group planning 3412 Make sure to plan on ordering specialized parts promptly. Include shipping times in planning. Mismanaged Budget Could result in changes in development. Poor group planning and limited funds. 248 Exercise budget management properly. Mismanagement of Time Unable to complete some aspects of project. Poor group planning. Lack of time management. 236 Plan out all aspects of development and testing properly for allotted time. Poor Documentation Dissatisfied customer. Follow up projects would be hindered Poor documentation throughout design and testing process. 248 Continually update logs and keep track of data. Make back-ups of data. Group Dysfunction Divergent design ideas. Poor communication and decision protocol. 122 Build a decisions making system. Inadequate Muscle Displacement Lack of or sub-par jumping ability. 339 Research muscle capabilities before application. Inadequate Muscle Force Lack of or sub-par jumping ability. 339 Research muscle capabilities before application. Inadequate Air Lack of or sub-par jumping ability. 339 Test air supply options vigorously. Malfunction of Air Muscle Cables Binding or stretching of cables. Improper transmission of muscle force. Improper cable material selection. Poor design/placement of cable paths. 224 Carefully design cable pathways and be aware of binding possibility during testing. Air Muscle Contraction Timing Uneven firing of leg muscles. Poor jump coordination Improper circuitry. Poor design of calculations Properly test the programming of muscle firing.

Risk Assessment RiskEffectCause Chance of Occurring SeverityImportanceAction to Mitigate On Board Power Supply Failure of electronics to operate. Not enough power supplied from on board Test power supply. Dynamics Design Proper jump motion is not achieved. Poor leg design 5420 Take care when in design phase. Dimension Related Muscle Interference Muscles cannot expand fully causing less than full utilization of muscle potential Poor layout planning. Inadequate attention paid to design around muscles. 236 Take care when in design phase. Account for muscle expansion. Air Muscle Performance Failure Muscle tears or expands in an unexpected manner leading to poor dynamics and function Poor construction protocol. Non-uniform construction quality of muscles Take great care when constructing each air muscle to ensure quality and uniformity. Electrical Communication Failure Failure of all solenoids to release air to muscles. Extreme movement of this robot could loosen wires. Landing may also cause strong enough impulses to disconnect electrical circuits. 212 Make sure electrical connections are secure. Material FailureMaterial yielding leading to failed operation. Poor material selection/design. 326 Consider strains and stresses induced in structures when designing tiger.

Schedule MSD1Week 1Week 2Week 3Week 4Week 5Week 6Week 7Week 8Week 9Week 10 SuMTWRFS MTWRFS MTWRFS MTWRFS MTWRFS MTWRFS MTWRFS MTWRFS MTWRFS MTWRFS Meet With Guide Learn Edge Code of Ethics Customer Needs Specs Benchmarking Functional Decomp System Flow Chart Risk Assesment Morph/Pough Chart Leg Concepts Tiger Leg Modeling Jump Logic System Design Prep System Design Review Muscle Data Collection Peer Review Create Test Plans Prototyping CAD Models Bill of Materials Arduino Code Project Manag. Review