SUCCESSFUL PLAN REVIEW

Slides:



Advertisements
Similar presentations
Installation Law Briefing
Advertisements

Framing.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
PERMIT INTAKE Applicant is greeted by permit staff Permit staff determines nature of permit, assists in gathering forms, and begins calling necessary staff.
1 The New Steel Erection Rule: Highlights. 2 Steel Erection Final Rule Published January 18, 2001 Implemented January 18, 2002 Includes exceptions for.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
2006 Residential Code of Ohio
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
Access BDD Survey School
CBJ Planning Commission Presentation November 9, 2010 Subdivision Ordinance Revision Update.
Guidelines and Required Codes That Affect Building Design
2009 IRC Bracing Provisions
Loads and Load Paths "Architecture is inhabited sculpture."
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Copyright 2006 Assurance Check, LLC ICC Boot Camp Instructor Greg Bell Greg Bell.
CE A434 – Timber Design Structural Behavior.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Oklahoma Uniform Building Code Commission IRC Building Subcommittee Presentation to Commission November 17, 2010.
PowerPoint Presentation
Chapter 33 Foundation Systems.
ePermitting Roofing System Boris Sursky LEED AP BD + C
Chapter 8 Plot Plans.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Blue Prints.
Application Process USAJOBS – Application Manager USA STAFFING ® —OPM’S AUTOMATED HIRING TOOL FOR FEDERAL AGENCIES.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
Constructing Homes and Other Buildings
Appendices Subpart R Steel Erection
Architectural Design Construction of a Wall Section Upon completion of this assignment, you will be able to accurately and neatly draw, to scale and limits,
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Governmental Constraints on Construction Chapter 2.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Governmental Constraints on Construction Chapter 2.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Building Codes Intended to protect the public by establishing minimum standards of building safety.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Affordable housing project
FRAMING SEMINARS 2012 PRESENTED BY KW ENGINEERING 1.
Chapter 32 Drawing Framing Plans.
Lecture 15 - Timber Wall Framing Example
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
MWFRS Method v/s Components and Cladding Method for Truss Uplift Connection Design for Wind Overview.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Permit Process & Application Guide
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Building Construction for the Fire Service
Department of Permits, Licenses, and Inspections
RESIDENTIAL GARAGE ADDITION
Building Planning and Drawing
Prepared by John R. Henry, P.E. Senior Staff Engineer
City of Healdsburg Construction Codes Amendments & Adoption: 2016 Building Standard Codes Title 24 Parts 1 Thru International Property Maintenance.
Total Fitness Gym By Student Architect Jhonatan Rubio
Wood Structures Topic 8 Quality Workmanship
Prepared for Municipal Officials in the Prairie Provinces March 2018
ePermitting Roofing System
Module 4: Technical Requirements for Prefabricated Buildings – Alberta
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
City Council Meeting November 14, 2016
Building standards Mr. Da Silva.
MSB High Value Tool Detailed Example August
Presentation transcript:

SUCCESSFUL PLAN REVIEW GUIDE TO: SUCCESSFUL PLAN REVIEW Take roll: engineers, architects, designers, contractors (NIBCA), home owners

WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review. Today we will be focused primarily on residential submittals. We realize first time success is low. Think of us as a source of information. We encourage applicants to come in for a pre-submittal conference.

REMEMBER THESE THREE THINGS: 1. Each application needs to have ONE PERSON WHO IS RESPONSIBLE for compiling a complete and accurate submittal package. 2. The plans are required to demonstrate Code compliance and be clear enough that a qualified 3rd party is able to understand the proposed project without any prior knowledge. If you fall asleep and forget everything else remember this. BREAK come back and talk about applicants who assume someone else does there job and doesn’t.

3. We are a valuable source of information. for you. Our staff is 3. We are a valuable source of information for you. Our staff is always available to answer questions an we encourage pre-submittal meetings.

LET’S GET STARTED PUTTING THE PUZZLE TOGETHER!

STEP ONE… Each applicant begins by presenting a site plan and all other documents to one of the Planners at the front counter…

PLANNING, ZONING, & STORMWATER ISSUES For the purposes of this presentation let’s assume there aren’t any, however…………………

PLANNING AND ZONING Please remember to Always consult with one of our staff Planners for other potential requirements.

COMMON MISTAKES MADE WHEN PREPARING A SITE PLAN Only a portion of the parcel is shown on the site plan; the entire parcel boundary must be delineated. Distance from the proposed structure to the property lines, and to other existing structures are not labeled. Site plan is not on an 8.5x11 sheet of paper. Site plan is not drawn to scale.

COMMON MISTAKES MADE WHEN PREPARING A SITE PLAN 5. Streams, drainage ways, and other land features are not delineated. 6. Current easements are not shown on the site plan. Existing roads, driveways, parking areas, decks and other impervious areas are not shown or labeled on the site plan. Directional arrows are not labeled.

STEP TWO………… After review and approval by the front counter Planner for land use requirements, the applicant will proceed to one of the Permit Techs.

STEP TWO… This is the point where your submittal is actually entered into “TRAKiT”, our project tracking software system. At the time your Building Permit Application is accepted and entered into our tracking system, the Plan Review Fee is due and will be collected by the Permit Tech; so please remember the checkbook.

INITIAL REVIEW FOR COMPLETENESS & COMMON ERRORS The Permit Tech will do a preliminary review of the plans and other submittal documents; truss sheets, HVAC design, engineering, etc. to verify if the submittal is complete. Please remember that the Permit Techs do not perform a complete review for Code compliance, but they do look for common inadequacies and may ask for additional information or corrections. The final Code review will be performed by one of the Plans Examiners after the submittal is accepted.

IS THE SUBMITTAL COMPLETE? Incomplete submittal packages to “Get in line” will usually not be accepted. This practice is unfair to those who have done their due diligence to compile a complete package.

RESIDENTIAL BUILDING PERMIT SUBMITTAL REQUIREMENTS AND CHECKLIST This “Submittal Checklist”, which will be covered in detail later, is required to be included in the Building Permit submittal package and must be completed and signed. This list will be covered in detail later

TECHNICAL QUESTIONS MAY BE ASKED… The person who brings in the submittal package should have adequate knowledge of the project. “He told me to just drop it off?!”

STRUCTURE AREA The SQUARE FOOTAGES of all living spaces, garages, decks, and covered porches are required to be clearly noted on the plans. The areas are necessary to calculate fees and is required information for the Fire Districts. AREAS Basement 1000 sq ft First floor 1000 sq ft Bonus Room 500 sq ft Decks 750 sq ft Garage 750 sq ft Total 4000 sq ft

OUTSIDE AGENCY APPROVAL By Ordinance, relevant outside agency approval must be provided to us before a Building Permit can be issued. At the time of submittal, as a courtesy, the Permit Tech will send notification by e-mail to the relevant outside agencies, such as Panhandle Health District, the Fire District, etc. that there is a proposed project in their jurisdiction.

PLEASE FOLLOW-UP It is important to remember that it is the responsibility of the APPLICANT to follow up with any additional requirements an outside agency may have. Please remember: You can track Permit approval progress on our website at “PERMIT SEARCH”: http://permits.kcgov.us/index.asp If an outside agency is not responding, please contact THAT AGENCY to follow up.

AFTER ALL REVIEWS AND APPROVALS ARE COMPLETE….. The applicant will be notified to come in to our office for the Permit to be issued. Remaining fees will be collected at that time. Again, please don’t forget the checkbook.

PERMIT TRACKING Again; the public can search the status of all Building Permits on the Kootenai County website! Please visit: http://permits.kcgov.us/index.asp Plan review, outside agency review, inspections

TRY ELECTRONIC SUBMITTAL! Kootenai County Building and Planning Department now accepts and encourages electronic plans for review. Both Building and Site Disturbance Permits. Upload to Net Account, or On CD.

A LITTLE BIT OF PAPER IS STILL REQUIRED…… At this time permit applications are required to be submitted in person. The 8 ½ x 11 site plan must also be submitted in person to check for land use issues. If the structure is residential over 3,600 square feet (or commercial) one paper set is required by the Fire Districts to be submitted to us and receive our stamps for the applicant to take to them for review.

IT’S A MUCH EASIER AND MORE EFFICIENT METHOD MUCH LESS PAPER Corrections can be e-mailed or downloaded between the Plans Examiner and the Designer. Plan review is faster. Easier to store plans. It’s GREEN!

INCLUDE ALL CONSTRUCTION DOCUMENTS Construction drawings Engineering calculations Truss data sheets RESCHECK HVAC design ETC. Everything is required to be in PDF format

ELECTRONIC SUBMITTAL Contact the Building Division to set up a Web Submittal Account. It is necessary to provide an e-mail address and choose a password. We’ll teach you how to download and retrieve documents. You will be notified automatically by e-mail when any document is downloaded to your account.

UPON APPROVAL After all documents are approved, we will e-mail or download the approved set to you for printing. The applicant is required to get one approved set printed which will then be kept on the jobsite as the approved plans required for inspections. The approved and printed jobsite set is required to be brought in by the applicant for signing at the time the permit is issued.

New customer computer! Please check out the NEW customer self-help computer in our office. There are links to many helpful sites and tools, and we’ll keep adding to the list.

GREAT SOURCES OF INFORMATION……… Kootenai County Building and Planning: http://www.kcgov.us/departments/bandp/ or call 208-446-1040 International Code Council: www.iccsafe.org Idaho Association of Building Officials: www.idabo.org Air Conditioning Contractors of America: http://www.acca.org/ Stairway Manufacturers Association: www.stairways.org

GREAT SOURCES OF INFORMATION ……… Idaho Division of Building Safety: www.dbs.idaho.gov APA-The Engineered Wood Association: www.apawood.org American Wood Council: www.awc.org Simpson Strong Tie: www.strongtie.com Wood Truss Council of America: www.woodtruss.com N.I.C.E. has donated the most relevant Codes and Commentaries to five area libraries: www.nice.idabo.org/index.htm All great info. Anyone is invited to attend NICE meetings……………………..

RESIDENTIAL REQUIREMENTS AND CHECKLIST

WHY ALL OF THE PLAN REQUIREMENTS? Not all requirements can be assumed on the plan, but most are. In the IRC alone, there are approximately 30,000 requirements.

Besides the basics, many of the plan review requirements are based on issues commonly encountered by the field inspectors.

Most would agree that It’s MUCH easier to make a correction on paper than by demolition.

WHO’S THE TEAM LEADER? AGAIN………….PLEASE REMEMBER: It can’t be stressed enough that for successful plan review, each permit application must have ONE PERSON WHO IS RESPONSIBLE for compiling a complete and accurate submittal package.

WHO IS ON THE TEAM? YES - A design TEAM creates the construction documents. Architect?...................................YES Designer?...................................YES Engineer?...................................YES General Contractor?...................YES Home owner?.............................YES Sub Contractors?.......................YES Building and Planning Staff?......YES

WITHOUT TEAMWORK, well…… ?

HERE’S WHAT THE BUILDING CODE REQUIRES OF THE PLANS: Notice that the plan is required to show compliance in detail. In detail is relative – stapling a code book to the plan isn’t what is required, but it has to be enough Braced wall lines shall be identified on the construction documents, including, but not limited to, bracing methods, location and length of braced wall panels, attachment of the braced wall panels at the top and anchorage of the braced wall panel at the bottom.

The days of plans on a napkin are behind us now! WHAT DOES THAT MEAN? The days of plans on a napkin are behind us now!

ACCURACY IS A MUST The scope of work and Code compliance is required to be clearly and accurately indicated in the plans.

PUT THE PIECES TOGETHER Please put the pieces of the puzzle together before you come in to submit for an application.

PUT THE PIECES TOGETHER Most delays in the permit process are a result of incomplete, inaccurate, conflicting or unclear documents.

Is there too much information in the General Notes? Are the plans to scale? Are the notes, details, truss data sheets, RESCHECK, engineering, etc. consistent with each other?

CLEAR AND ACCURATE? Have canned plans been modified to reflect what will actually be in the scope of the proposed work? Flipped or mirrored plans will not be accepted. Old “whiteout” plans that have been used before will not be likely be accepted.

DETAILS If generic file details are used on the plan, include ONLY those which specifically apply to your project. Two story section for a one story house, etc. Cross reference all details to the location they will be used such as: 3 A 1.1

OLD HANDOUT DETAILS All old details we have provided in the past are obsolete; PLEASE put them in the recycle bin.

DON’T LEAVE IT TO OTHERS We can’t accept notes on the plan such as these: “By Others” (Who is Mr. Others?) “By Vendor” “Preliminary” “See Engineering” (if there isn’t any)

BUILDING ORDINANCE 450 The Building Ordinance contains all of the Code adoptions and amendments. It is a companion to the various Codes. The Building Ordinance also lists the relevant design criteria. The Building Ordinance details code violation and appeal requirements

IS A PERMIT REQUIRED? There are few things that don’t require a building permit. IRC Section R105.2 lists exempt work. It is always best to contact us and ask.

USE THE CORRECT CODES (And note them on the plan) 2009 International Residential Code 2009International Building Code 2009 International Energy Conservation Code Plumbing and electrical under jurisdiction of the State of Idaho

PLEASE DON’T USE OLD CODES Remove notes such as 1997 UBC, NW Energy Code, etc. Here’s a classic: “All work shall comply with the requirements of the 1988 Uniform Building Code and all applicable regulations of Bonner County”

LIST (And Use) THE CORRECT DESIGN CRITERIA WIND: 90mph 3 second gust (76 mph sustained) Exposure? B,C, or even D

SEISMIC ZONE C R301.2.2: Exception: Detached one- and two-family dwellings located in Seismic Design Category C are exempt from the seismic requirements of this code.

SOIL Assumed soil bearing pressure is 1,500 psf -If an engineered design is for more than 2,000 psf, a geotechnical report is required. -Minimum frost burial depth is 24”

Zone A: Minimum 40 psf Roof Snow Zone A: Minimum 40 psf Roof Snow Load or Engineered Design Zone B: Minimum 50 psf Roof Snow Load or Engineered Design Zone C: Engineered Design based upon the snow load findings of the engineer. (Exceeds the limits of the IRC)

WHY ENGINEERING FOR ZONE C ? R301.2.3 Snow loads. Wood framed construction, cold formed steel framed construction and masonry and concrete construction in regions with ground snow loads 70 pounds per square foot (3.35 kPa) or less, shall be in accordance with Chapters 5, 6 and 8. Buildings in regions with ground snow loads greater than 70 pounds per square foot (3.35 kPa) shall be designed in accordance with accepted engineering practice.

HOW MANY PSF IS IT?

ZONE C ? The engineer determines the ground snow load and from that, determines the roof snow load and construction requirements for the entire building. It may be a full design from the roof to the ground. It may be determined that standard light frame construction is adequate. The engineer decides to what extent the building needs to be designed.

THE IRC IS PRESCRIPTIVE This is a limited “cookie cutter” code. Buildings or portions of buildings that are not conventional, light frame platform and balloon frame construction require an engineered design.

ENGINEERING REQUIREMENTS If engineering is submitted, supporting calculations must be included with the submittal. The engineer’s requirements are required to be transferred onto the plan and be consistent with the remainder of the plan. Any engineered design in the plans is required to be stamped. An engineer’s letter endorsing another’s work will not be accepted unless that work was supervised by the engineer.

NON-PRESCRIPTIVE METHODS Any type of construction or structural component which is not contained prescriptively in the International Residential Code requires an engineered design.

ALTERATION TO AN ENGINEERED DESIGN Any alteration which is attached to or otherwise affects an engineered design requires stamped engineering.

MANUFACTURED HOMES Any alteration or addition to a mobile or manufactured home requires an engineered design.

BEARING WALL STUD LENGTH Laterally unsupported (perpendicularly) stud length is limited to 10’. May be increased to 12’ if the required length of bracing in Table R602.10.1 is multiplied by 1.20. Greater un-restrained bearing stud lengths require a stamped engineered design.

BEAMS Calculations are required for any beam exceeding 6’ in length. Stamped engineering with calculations is required for beams exceeding 25’ in length, not uniformly loaded, or with a point load. Cross reference all calcs to the plan: B1, B2, etc.

BEAM ENGINEERING Design of a beam could easily include the design of other components; hangers, columns, footings, etc. to complete the load path.

COMPLETE LOAD PATH The IRC states that design and construction must provide a complete load path that meets all of the requirements for the transfer of all loads from their point of origin through the load resisting elements to the foundation. Gravity, uplift, and lateral forces should be considered.

CANTILEVERED FLOOR Floor cantilevers exceeding those allowed by R502.3.3, Table R502.3.3(1), or Table R502.3.3(2) require an engineered design.

RETAINING WALLS Any unrestrained retaining wall exceeding 4’ high measured from the bottom of the footing requires stamped engineering. Any restrained retaining wall, such as a basement, exceeding 9’ high and retaining more than 8’ of fill requires stamped engineering. Any retaining wall retaining additional surcharge requires stamped engineering.

15% slope Any building site with a slope steeper than 15% requires a stamped engineered foundation plan.

Cut / Fill Cut or fill slopes steeper than 2 horizontal units to 1 vertical unit require a stamped engineered design.

2 / 1 Slope (50%) 1 unit 1 unit 2 units

SETBACKS FROM SLOPES

SETBACKS FROM SLOPES…

5’ SETBACK FOR CUT OR FILL Kootenai County Site Disturbance Ordinance Section 7 A. (4) Except where roads or driveways cross property lines, the tops and toes of cut and fill slopes shall set back from property boundaries one half the height of the slope with a minimum of 5’ and a maximum of 20’, unless the design professional has demonstrated to the Administrator that smaller setbacks provide a sufficient measure of safety and stability for activities which may occur on adjacent property.

PROPERTY LINE SETBACK FOR CUT ½ THE HEIGHT OF THE SLOPE WITH A 5’ MINIMUM AND 20’ MAXIMUM OR PROVIDE ENGINEERING CUT LINE – 2:1 MAX OR PROVIDE ENGINEERING

PROPERTY LINE SETBACK FOR FILL ½ THE HEIGHT OF THE SLOPE WITH A 5’ MINIMUM AND 20’ MAXIMUM OR PROVIDE ENGINEERING FILL

HVAC DESIGN Beginning January 1, 2010 all of the area jurisdictions began seeking compliance with the Code requirements for HVAC system design based on ACCA Manuals J & D (S).

NEW SYSTEMS ONLY This requirement only applies to new complete systems which are submitted for permitting after January 1, 2010. Simple appliance change-outs do not apply if the structure was submitted for permits before January 1, 2010.

WHAT IS REQUIRED? ACCA Manuals J & D worksheets, either paper and pencil or spreadsheets: http://www.acca.org.speedsheet/ or; ACCA certified software reports such as Wrightsoft and Elite. Other methods may become approved in the future.

AND……………… Completed Kootenai County HVAC Review Form. The Manufacturer’s data performance sheets for the appliances that will be used. A mechanical plan drawing which shows the location of the appliances, the locations, sizes, and fittings of the duct system.

TUTORIALS @ ACCA.ORG There are several great training tools available free on the ACCA website: http://www.acca.org/codes/brochures/ http://www.acca.org/speedsheet/ http://www.acca.org/codes/reviewform/index.php More future.training will be hosted by N.I.C.E.

FLOOR PLAN Intended use of each room. All window and door sizes and method of operation. Note all required EGRESS. Indicate all required safety glazing.

FLOOR PLAN Complete dimensions. Location of all required smoke detectors. Location and CFM of all required ventilation. Location and type of all heat sources. Location and type of all fuel appliances. Indicate all required fire separation. Indicate vehicle impact protection.

ELEVATIONS Provide elevation views from all sides. Accurately demonstrate the adjacent grade at least 20 feet.

FOUNDATION PLAN Indicate the location of all footings, stem walls, piers, and retaining walls with dimensions. (include all decks) Note the size and placement of all rebar. Note specific hardware and it’s location.

FOUNDATION PLAN Indicate the depth of the footings. Indicate the method and amount of ventilation. Indicate the access opening and size.

FLOOR FRAMING PLANS Indicate all joist sizes and spacing. If I-joists, indicate manufacturer and series. All beam sizes and locations. Include all decks. Include all specific connecting hardware.

DECK FRAMING Include joist size and spacing and all beams. Include ledger and flashing details. See section R502.2.2.1 of the Building Ordinance. Include all connecting hardware.

ROOF FRAMING PLAN Indicate all rafter sizes and spacing. If I joists, indicate manufacturer and series. Indicate all beam locations and sizes. Include construction details for all over-framing or infill including support. Indicate all connecting hardware, including uplift restraint.

TRUSSES The truss plan is required to match the construction plans. Include data sheets for each truss. Check uplift and required bearing length.

WALL BRACING Indicate the location and methods of required wall bracing. Provide ONLY details for braced wall panels specific to the job. Include required interior wall bracing. If hold down hardware is required, indicate the locations and specific hardware.

CONTINUOUS SHEATHING If the continuous sheathing provisions of IRC R602.10.5 are used, all requirements must be met and demonstrated on the plan. Any wall bracing design method is required to apply to an entire braced wall line.

CROSS SECTIONS Must be specific to the proposed project. Identify all construction materials. Note all insulation Provide stair, handrail, and guard details.

STAIRS Provide stair, handrail, and guard details.

ENERGY CODE COMPLIANCE May be prescriptive. Otherwise provide RESCHECK http://www.energycodes.gov/rescheck/ Either method is required to be consistent with what is noted on the plan and in the HVAC Manual J load calculations.

IF THERE IS A CORRECTION LETTER… Double check to make sure all of the items have been addressed before re-submitting. All required additional information is required to be be transferred onto the plans. It speeds up the re-review if changes are flagged on the plans. Return the original redlined documents. Provide two new clean sets of plans. If a second correction letter is issued, the application may move to the end of the first time submittal line.

WHO COMPLETES THE CHECKLIST? THE TEAM LEADER !

REMEMBER THESE THREE THINGS: 1. Each application needs to have ONE PERSON WHO IS RESPONSIBLE for compiling a complete and accurate submittal package. 2. The plans are required to demonstrate Code compliance and be clear enough that a qualified 3rd party is able to understand the proposed project without any prior knowledge.

3. We are a valuable source of information for. you 3. We are a valuable source of information for you. Our staff is always available to answer questions an we encourage pre-submittal meetings.

QUESTIONS?