MONITORING ON TUNNEL CONSTRUCTION IN CZECH REPUPLIC.

Slides:



Advertisements
Similar presentations
BERNARD Ingenieure Best solutions ensure enthusiasm
Advertisements

Chapter 2 Table of Contents Section 1 Displacement and Velocity
Sage of America 7907 Old Lee Highway Collegedale, Tennessee SURFACE DIFFUSION ALLOYED (SDA) STEEL FOR OILFIELD TUBULARS CORROSION TEST PROGRAM SAGE.
Are You Smarter Than an 8 th Grade Math Student?
Objective: Know the sum of angles at a point, on a straight line and in a triangle. Vocabulary:
Ph.D. Completion and Attrition CGS Board of Directors December 4, 2007.
Motor Installation By Bill Lee Article 430. NF 15HP NF 25HP NF 30HP NF 50HP NF 75HP D.E.T.D. Fuse Feeder O.C. Feeder Conductors N.T.D IV. Time D.E.T.D.
1 UNECE – Transport Division Regional Dimension of Transit Transport Cooperation Eva Molnar, Director, UNECE 3 October 2008, New York City Mid-Term Review.
Commission Payout Dates Starts Thursday, Ends Wednesday Initials paid 2 weeks later on Thursday Residuals paid out on 20 th of each month Can track sales.
Commission Payout Dates Starts Thursday, Ends Wednesday Initials paid 2 weeks later on Thursday Residuals paid out on 20 th of each month Can track sales.
Commission Payout Dates Starts Thursday, Ends Wednesday Initials paid 2 weeks later on Thursday Residuals paid out on 20 th of each month Can track sales.
Marshal Office of Silesian Voivodeship European Social Fund Department
Regione Toscana Accessibility and logistics to the competitiveness of the Tuscan territory Enrico Becattini - Responsible of P.O. Integrated system to.
DG REGIO – Unit "Thematic Development" EUROPEAN COMMISSION EN 1 Transport and Regional Policy Transport and Regional Policy Patrick.
1 Vehicle Types Vehicle TypeFreeway Lane Capacity BusesLimited Capacity Bus Rapid Transit Medium/High Capacity Rail TransitHigh Capacity.
Dennis L. Edwards Tunnel
MONDAY 17 MARCH 2003 Haivan Pass Tunnel Construction Project CONSTRUCTION PROGRESS February 2003.
When Accuracy Matters WELCOME DOLPHIN CONSTRUCTION CO. (An ISO 9001:2008 Certified Co.)
TEMPO TRAINING & CONSULTING s.r.o. Czech Republic 3 rd September 2010 Burgas, Bulgaria.
1 Anisotropic characteristics of wood dynamic viscoelastic properties Jianxiong Lu, Fucheng Bao and Jiali Jiang Key Laboratory of Wood Science and Technology.
How to round a number with two decimal places to the nearest tenth
Analysis of Tri-axial Stress-strain Conditions of Pre-stressed Masonry Corner VSB-TU, Faculty of Civil Engineering Radim Cajka Pavlina Mateckova Lucie.
Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
29/09/2011 Bucuresti ÖBB–PORR Slab Track System with Elastically Supported Track Base Plate Advisor: Jörg Fenske, Dipl.-Ing. 1 Technologies.
Construction Monitoring For Earth Dams 1 Fars Science and Research Branch, Islamic Azad University.
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
Belgrade, 21. January 2010 Short information on Pilot project on time measurement of border procedures at Obrežje (SLO) – Bregana (CRO) border crossing.
GENERAL DIRECTORATE OF CUSTOMS CZECH REPUBLIC BUDĚJOVICKÁ 7 PRAGUE Lucie Bednářová IPR Unit Specialist.
Geotechnical investigation and risk assessment at Budapest metro line 4 Dr. Tibor Horváth Geovil Ltd. INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
© 2009 Bentley Systems, Incorporated Edmundo Herrera, P.E. Bentley Systems, Inc. Modeling Tunnels with Roadway Designer & Bentley Rail Track.
CZECH STATISTICAL OFFICE | Na padesátém 81, Prague 10 | czso.cz1/X Petra Kuncová CZSO RELIABLE SOURCE OF(OPEN) DATA.
Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Investment project of Ferghana plant of chemical fiber Olim F. Maksudov Director General.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Civil Works Progress ADB Loan No CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP Improvement of NR33 (15.83 Km Kg Trach to Preak Chak)
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
UNECE WP on Transport Trends and Economics Geneva, 15 September 2006 Activities on Pan European Transport Corridor VI Marian HANTAK TEM Project Central.
Transport network in Czech Republic. Task 1 - Introduction.
ITA Croatia TÜLİN SOLAK Temelsu International Engineering Services Inc. Congress centre “Lacroma”, Dubrovnik April, 7-9, 2011 ITA Croatia “TUNNELING ACTIVITIES.
Department of Civil Engineering,
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
EUROCENTRE PRAHA Office of the Government of the Czech Republic.
OP Transport 2007 – 2013 and JASPERS Ministry of Transport.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
Dolexpert - Geotechnika Workshop of the TC302 - Forensic Geotechnical Engineering FAILURES, DISPUTES, CAUSES AND SOLUTIONS IN GEOTECHNICS.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
9 th Cohesion Fund 1164/94/ISPA Monitoring Committee Meeting – 29 June 2011 GENERAL REPORT ON MEASURES managed by Ministry of Transport, Information Technology.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
28th November 2008, Brussels1 Railway Infrastructure Administration, state organization EFRTC General Assembly 28th November 2008Brussels, Belgium Infrastructure.
Monitoring in Prague metro Martin Vaníček - CTU. Monitoring in Prague Metro Cambridge 18 June 2010 Martin Vaníček Types of monitoring in Prague Conventional.
Transport policy Croatia - Cooperation with EU agencies in pre-accession process The Republic of Croatia Ministry of Sea, Transport and Infrastructure.
City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Jan ILÍK Ministry of Transport, CZ Shaping the future HSR concept for the Czech Republic and CEE.
SEETO Investment Report 2016
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
CLIC Civil Engineering Update
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
Construction Monitoring
Office of the Government of the Czech Republic
N.N.Som Consulting Geotechnical Engineer
Toll collection system in the Republic of Slovenia
Strategic Road Projects
National Transition Facility / Phare / Cards
Presentation transcript:

MONITORING ON TUNNEL CONSTRUCTION IN CZECH REPUPLIC

1. DESIGN  monitoring dimensions and instrumentation 2. MONITORING OFFICE  data operating (archiving, sharing)  measurement interpretation - results 3. MONITORING PANNEL  monitoring conclusions (1 per week min.)  design and technology back analyses 4. SPECIAL MODE  building under passing  public relation and cooperation with building's users Monitoring

1.HIGHWAY TUNNELS  Valík (D5 - Plzeň)  Panenská (D8 – Krušné Hory)  Libouchec (D8 – Krušné Hory)  Klimkovice (D47 – Ostrava) 2.RAILWAY TUNNELS  Krasíkov I a II (3. Transit corridor)  Malá Huba, Hněvkovský I, II (3. Transit corridor)  The New Junction (Prague)  Březno (Chomutov) 3. METRO  Line IV.C 4.PILOT TUNNELS  Prague’s highway ring  Brno’s road inner ring

Basic data: - tunnel lengthLTT= PTT= 330 m - cross section 125 m 2 154,25 m 2 emergency pits - cut and coverLTT 50 m PTT 60 m SG – Geotechnika provides:  geotechnical supervision  monitoring office  monitoring instrumentation - extensometerers - leveling on surface - portal deformation - tens meters (prim. lining) - tensometers (final. lining) - pressure cells - convergence Tunnel Valík

Basic data : - tunnel length LTT= PTT= 2000 m - cross section 85 m m 2 emergency pits SG – Geotechnika provides :  geotechnical supervision  monitoring office  monitoring instrumentation - extensometerers - leveling on surface - portal deformation - tens meters (prim. lining) - pressure cells - convergence - seismic and acoustic measurement Tunnel Panenská - hydrogeology - basic data on buildings - 3D scanner Cyrax

Tunnel Panenská

Basic data:- tunnel length LTT= PTT= 860 m - cross section154,25 m 2 - cut and cover Ostrava portal 50m Brno portal 170 m Join venture - Monitoring Tunnel Klimkovice:SG-Geotechnika a.s. GeoTest Brno a.s. Inset, s r.o. SG – Geotechnika provides: - geotechnical supervision - monitoring office - monitoring instrumentation - extensometers - convergence Tunnel Klimkovice

Basic data: - tunnel length m - cross section 95 – 120 m 2 SG-Geotechnika provides:  client technical supervision  geotechnical supervision  monitoring office  monitoring instrumentation - extensometers - leveling on surface - portal deformation - convergence - basic data on buildings - 3D scanner Cyrax Tunnels Krasíkov I &II

Basic data: - tunnel length m - cross section m 2 SG-Geotechnika provides:  client technical supervision  geotechnical supervision  monitoring office  monitoring instrumentation - extensometers - leveling on surface - portal deformation - convergence - basic data on buildings - 3D scanner Cyrax Tunnels Malá huba, Hněvkovský I, II

Basic data: - tunnel length : SO 09 – double track tunnel m SO 13 – double track tunnel m - 2 x single track tunnel - 65 m - cross section : 62 m m 2 Join venture:SG-Geotechnika a.s. Inset, s r.o. SG-Geotechnika provides : - geotechnical supervision - monitoring office - monitoring instrumentation - extensometers - inclinometers - building inclination (tilt meter) - building cracks measurement - convergence - geology - hydrogeology Metro IV. C (Ládví – Letňany)

Metro IV. C

Fartak tunnels, Republic of Yemen

Basic data: - nr.of tunnels:4 (T1,T2,T3,T4) - tunnels length: m - cross section m 2 - excavation methodNRTM Client:Kuwait Arab Fund Builder:General Directorate of Roads, Republic of Yemen Contractor:YERTAS, Turkey Consultant:RENARDET s.a., Italy - Yemen Fartak tunnels, Republic of Yemen

Fartak tunnels

THANK YOU FOR YOUR ATTENTION