Current Status of the FDOT SunGuide SM Software Project Robert W. Heller, Ph.D. March 16, 2005.

Slides:



Advertisements
Similar presentations
© Copyright 2007 Exempler Telecom Test Automation System Exempler - We pride ourselves with providing lightweight robust engineering solutions.
Advertisements

SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
(1) UH Dorm Energy Competition: System Design Philip Johnson Collaborative Software Development Laboratory Information and Computer Sciences Dept. University.
17 Copyright © 2005, Oracle. All rights reserved. Deploying Applications by Using Java Web Start.
0 - 0.
Addition Facts
CS4026 Formal Models of Computation Running Haskell Programs – power.
Florida Department of Transportations Unified Basemap Repository Purpose To provide a comprehensive dataset of roadway geometry and attributes accessible.
1. Green Lights Program Objectives Improve Quality of Synchronization in a Short Timeframe Noticeable Improvements to Motorists Appropriate Allocation.
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
Overview What is the National ITS Architecture? User Services
May 6th, 2009 Presented by Shari Hilliard, ITS Engineer KC ITS Symposium Kansas ITS/ATIS Update KC ITS Symposium Kansas ITS/ATIS Update.
FDOT District 4 ITS Program Update
Addition 1’s to 20.
FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
FDOT Central Office ITS Deployment Update Gene Glotzbach, P.E. Traffic Engineering and Operations Office.
FDOT Central Office ITS Software Update
FDOT District 6 ITS Project Update Manuel Fontan, E.I. ITS Project Manager.
Test B, 100 Subtraction Facts
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Command and Management Unit 5.
Statewide Transportation Management Center Software Library System Status Meeting February 17, 2004.
SunGuide SM Software Development Project Ramp Meter Firmware Discussions August 8, 2006.
ITS Software A TxDOT Statewide Perspective Charlie Farnham ITS Configuration Manager ITS America June 6, 2007.
SunGuide SM Software Development Project Status Meeting February 23, 2005 CDRL
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
SunGuide SM Software Development Project Status Meeting March 9, 2004.
RCOC’s Real-Time Traffic Web Site Enhancements Ahmad Jawad Road Commission of Oakland County Qingyan (Ken) Yang, Preeti Agarwal, Jeff Manring Iteris Inc.
SunGuide SM Software Development Project Status Meeting (via teleconference) October 4, 2005 CDRL
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting January 11, 2005.
SunGuide TM Center-to-Center Functionality What “it is” and How to “use it” November 12, 2008.
January 11, 2007Map Alternatives Workshop 1 SunGuide SM Map Alternatives Workshop.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
Smartphone Application for Road Rangers Tucker Brown Roger Strain Robert W. Heller, Ph.D. Southwest Research Institute San Antonio, Texas USA.
Infrastructure Security Leveraging the ITS Experience Base Presented at ITS America Commercial Vehicle and Mobility Forum K.K Saxena, CCP Principal Kimley-Horn.
1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007.
July 14, 2010SunGuide SMD Kickoff Meeting1 BDQ69 SunGuide Support, Maintenance and Development Enhancement Contract July 14, 2010 Kickoff Meeting.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting August 27, 2007.
Statewide Transportation Management Center Software Library System (SunGuide SM ) TIM & SunGuide SM Coordination Meeting October 21, 2004 Orlando, Florida.
C2C COORDINATION LOCATION: FDOT DISTRICT 4 August 17, 2004 LOCATION: FDOT DISTRICT 4 August 17, 2004.
SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
SunGuide SM Software Development Project Status Meeting December 7, 2004.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
Florida Traffic Incident Management Performance Measures Paul Clark – Florida DOT Traffic Incident Management and Road Ranger Program Manager.
SunGuide SM Software Development Project Status Meeting July 13, 2004.
Presented to Performance Measures Session FDOT ITS Working Group Meeting, Tampa, FL presented by Kenny Voorhies, Cambridge Systematics March 20, 2008 Florida.
SunGuide SM Software Development Project Status Meeting May 10, 2005 CDRL
SunGuide SM Software Development Project Status Meeting November 9, 2004.
SunGuide SM Software Development Project Administrator Training CDRL
SunGuide TM 4.0 Functionality Data Fusion: How Data is Managed June 24, 2008.
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
Clay Packard, PE ITS GC Software Project Manager Florida Department of Transportation WAZE – FDOT Integration.
SunGuide SM Software Development Project Status Meeting April 29, 2004.
SunGuide SM Software Development Project Status Meeting October 13, 2004.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007.
April 29, 2004 Project Status Meeting Liang Y. Hsia, P.E. ITS Engineer Administrator Florida Department of Transportation.
FDOT Annual ITS Working Group Meeting ITS Updates.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
SunGuide SM Software Development Project Software Design Review May 12, 2004.
SunGuide SM Incident Management Concepts Robert Heller October 21, 2004.
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Agenda Time Item Lead 10:00 – 10:05 Introductions Liang Hsia
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:45
SunGuideSM Software Development Project Status Meeting and Demonstration April 5-6, 2005 CDRL
Presentation transcript:

Current Status of the FDOT SunGuide SM Software Project Robert W. Heller, Ph.D. March 16, 2005

March 16, 2005SunGuide Software: Status Update 2 Goals and Objectives FDOT Goals –Improve transportation safety. –Reduce congestion and delays. –Acquire (own) the most technically comprehensive ITS software. –Establish a software standard at TMCs throughout the State of Florida. –Reduce multiple TMC software development, maintenance, and update costs. SunGuide software goals: –Flexible and expandable to match individual TMC needs. –Respond to traffic incidents in a rapid, accurate, and effective manner.

March 16, 2005SunGuide Software: Status Update 3 Project Web Site

March 16, 2005SunGuide Software: Status Update 4 SunGuide SM Software Architecture Robust Extensible Flexible Scalable Configurable Proven

March 16, 2005SunGuide Software: Status Update 5 Release-Oriented Development Approach

March 16, 2005SunGuide Software: Status Update 6 Benefits of SunGuide SM Integrated traffic management –Map –DMS –CCTV –Video Switching –Video Wall Control –Traffic Detection –HAR –Incident Management –RWIS –Archive Data Center-to-Center –Exchange status information –Exchange command/control requests

March 16, 2005SunGuide Software: Status Update 7 Executive Handler: Centralized System Management View by: –Subsystem –Computer Alter Logging Level Restarts

March 16, 2005SunGuide Software: Status Update 8 DMS Control

March 16, 2005SunGuide Software: Status Update 9 CCTV Control

March 16, 2005SunGuide Software: Status Update 10 Video Switching

March 16, 2005SunGuide Software: Status Update 11 Video Wall

March 16, 2005SunGuide Software: Status Update 12 Incident Management Screens Better utilize multiple monitor workstations Utilize native HTML to improve performance (lose some visual capabilities provided by SVG) Work in progress

March 16, 2005SunGuide Software: Status Update 13 Map Link Editor: Example Screen

March 16, 2005SunGuide Software: Status Update 14 Center-To-Center Status: –Centers must explicitly subscribe for data –User must choose to view the data Command/Control: sender must have credentials at the receiving center

March 16, 2005SunGuide Software: Status Update 15 High Level Schedule Software Releases –Release 1 – May 2005 timeframe –Release 2 – August 2005 timeframe Short-term deployments: –District 4 Broward County RTMC –District 6 Miami RTMC: Early release of Ramp Meter with Release 1 target for August 2005

March 16, 2005SunGuide Software: Status Update 16 Liang Y. Hsia, P.E. (850) Florida Dept. of Transportation 605 Suwannee St. MS 90 Tallahassee, Florida Robert Heller (210) Southwest Research Institute P.O. Drawer San Antonio, Texas Questions? Contact Information: