Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Slides:



Advertisements
Similar presentations
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
Advertisements

PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Trenchless technology in action Part 2 The “Pipe Cracking ” process.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
1 Cold planers Prestudy Jan 2009 / Jürgen Seemann.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
W. J. M. K. PERERA (RU/E/2007/119) Department of Civil and Environmental Engineering.
Getting Wet Stuff to the Red Stuff For 300 Years
1 Answer the questions relating to each of the graphics in turn. Say the answer to yourself, then check it. To revise the passive, click HERE Self-testing.
HEIS INSTALLATION PROCESS 1. DEMARCATION IN FIELD 2.
Water supply and drafting. Objectives Understand and be able to demonstrate the different hydrant lays and hook ups Explain/demonstrate how to operate.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Undertake basic electrical tasks
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
My Fault Line At Work Setefano A. Malieitulua. Water and Fault Line This is a 10” water pipe mainline break on 9400 S 1300 E. In this video at :14 seconds,
Schematic to Pictorial Page A4 schematic to Page A4a pictorial.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2011.
High Pressure Lifting Bags
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Emergency Trade Repairs By Jake Beutle. What is an Emergency Trade Repair?  An emergency trade repair is those simple/ not so simple problems in your.
1402 Hybrid Firefighter II 6th Edition Chapter 15 — Fire Hose South Carolina Fire Academy.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Other Construction Projects
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Select and deploy the appropriate hose lines to accomplish fire confinement and extinguishment.
Airfield to Wildlife Haven! What happened to the airfield?
Dam Placed across a river to block or control the flow of water.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
“Fix Tube Sheet” Heat Exchanger
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Overview Select and deploy the appropriate hose lines to accomplish fire confinement.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Cooling System. 1. List the basic parts of a cooling system: -Thermostat -Fan -Water pump -Radiator -Ethelyne glycole -Shroud.
The Romans were famous for their roads. They were built by the Roman army during times of peace.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 23 Using Gas Welding Equipment.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Substructure Groundworks - Hazards
Visit for more Learning Resources
Earn while you learn in the Northwest Region
Tips For Solving Plumbing Issues
Non-sustainable energy:
Firefighting equipment
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
English for Technician
ESTIMATING EARTHWORK Prof Awad S. Hanna.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Bella Vista Fire Department Procedures on Sprinkled Buildings
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Presentation transcript:

Laying a new pipeline A pictorial story

Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can be “proved” as to what pipes and other services are actually in the ground and exactly where these items are.

Safety Equipment Safety vests and appropriate protective equipment are supplied to local labour on the project

Trenching begins Solid rock brings out the Jackhammer Excess material is removed as quickly as possible to designated holding sites Heavy machinery is available as needed

Road crossings Cutting the strip Road closure for safety’s sake And the dust flies as the cuts are made

Laid pipe showing householder connection 3 way join with tee valves in place Pipe laying in progress Trench also contains other services Pipe laying

Pipes and the consumer Barricading open trenches For safety purposes Waiting to be connected To consumers meter Preparing trenches to carry connection to consumers

Reinstatement Closing the trench Temporary road reinstatement Consumers driveway being reinstated

Reinstating a road Traffic Control Preparations for reinstatement Applying a priming agent The Bitumen arrives Spreading the asphalt And lastly compaction

And soon to be as good as new!

And finally when all is done Pressure Testing takes place to check for leaks Water is pumped into the system under pressure and the whole system checked for leaks. Only after this will the new system “take over” from the old