Models. The Future of Building Services Model Content.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Advertisements

BIM-MEP AUS Presenter ALBERT WATSON Company WATSON FITZGERALD AND ASSOCIATES MECHANICAL SERVICES CONTRACTORS.
Building Information Management (BIM)
Maximo extension to worldwide Suppliers for complete data integrity
K & D DIVERSIFIED 3745 W. WAHALLA LN GLENDALE, AZ RVENG.NET Tooling & Manufacturing Engineering K & D’s capabilities consist of these.
The Future in BIM Enabled Integrated Project Delivery.
BIM-MEP AUS Pump Industry Australia The PIA represents pump manufacturers and distributors across all pump industries across Australia AMCA approached.
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
The Future in BIM Enabled Integrated Project Delivery.
© 2009 Autodesk Autodesk’s Commitment to BIM-MEP AUS Rob Malkin, Director ANZ Architecture, Engineering and Construction.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
MEP/CIC Jan. 12, 2001 NASA’s STEP for Aerospace Workshop Using STEP for Engineering, Fabrication and Construction of Industrial Facilities Mark Palmer.
VISEUM UK PRESENTATION MAJOR SECURITY PROJECT ON TIME COMPLETION MANAGEMENT.
BIM Management – A Strategic Approach
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
BIM & 3D House Printing 3D Printing of building can reduce the construction costs and the construction time. 3D Printing of buildings will allow more customization.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks The Precast Concrete Industry A proposal for the adoption.
Presented with Effective Document Management/Handover in the Engineering and Construction Sector This is a Title Slide with Picture and Two Logos slide.
Building Information Modeling
Expanding Roadmap Opportunities Deke Smith, FAIA Executive Director buildingSMART alliance National Institute of Building Sciences Hotel Monteleone New.
Operations Management. O Operations management is about producing goods and/or services based on business objectives Business objectives Business strategies.
INTRODUCTION AS PROJECT MANAGEMENT COMPNAY (August 2012)
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
FIATECH FIATECH ADI Programmers Circle 2006 Onno Paap, Fluor Corporation.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
DPW Facility Manager’s Program May 12, 2010 Building Information Modeling BIM ( Building Information Modeling ) BIM ( Building Information Modeling ) What.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
PRAVENDRA KUMAR.  A supply chain is the collection of steps that a company takes to transform raw components into the final product.  Supply chain management.
SPED Certification Program September 17, 2003 Houston, TX.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
MEP Fabrication Detailing in Autodesk® Revit® MEP 2016
Manufacturing Plant maintenance Materials management Quality management.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
UNIKL TRAINNING MODEL MODULE CONTENT 1- INTRODUCTION MODULE2 DAYS 2- PROCESS PIPING DESIGN & LAYOUT 7 DAYS 1- Piping Component 2- Equipment Datasheet 3-
Overview of Building Information Modeling What does it mean for Civil Engineering?
Operation & Maintenance Construction & Logistics 4D/5D Construction Fabrication Documentation Analysis Detail Design Conceptual Design Programming Renovation.
CAD SERVICES BIM/3-D MODELING. SUN MECHANICAL’S VIRTUAL DESIGN CONSTRUCTION STAFF HAS THE SOFTWARE AND EXPERTISE TO INTEGRATE 3-D CAD FILES AND GENERATE.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
advices for advancing the productivity of the construction industry:
Commissioning & Startup
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
DESIGN TOOLS UPDATE.
Installation Procurement Package
EXTRA SLIDES.
Construction project management
AP 231: Process Design and Process Specifications of Major Equipment
Service reference ABU DHABI, United arab emirates IND 36 months
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Taking AWP Global Yogesh Srivastava Co-Chair of AWP Committee at COAA
ISO Brief Overview 17 September 2008 Magne Valen-Sendstad.
Software Development Process
VISEUM UK PRESENTATION
WELCOME TO TRAINING SLY INCORPORATED.
Coppin State University
Jackson Ntw Soln: For Fab Station, l=103, m=40, s=3, r= 103/120=0.86
Atefeh Sadeghzadeh Control engineer – Target safety and control
Superior-Fab LLC is a company with the vision and mission to meet the expectations of our customers in the supply of equipment, products and complementary.
Presentation transcript:

Models

The Future of Building Services Model Content

What’s the biggest barrier to industry adoption of BIM? CAM Fabrication Proprietary Difficult and expensive to create Not conceived to support integrated project delivery or asset life cycle Answer: Model Content.

BIM-MEP AUS Model Workflows BIM-MEP AUS Design Model BIM Construction CAD Shop Detailing BIM As-Installed FAB-MEP AUS BIM-MEP AUS Construction Model BIM-MEP AUS Commissioned As-Built Model D&P Fabrication Pre-Fabrication BIM-MEP AUS Managed Content Site SUPPLIER BMA MODELS FAB MODELS Duct FabricationB2B BIM-MEP AUS Fabrication DESIGN MODELS

BIM-MEP AUS Model Types Plant Equipment Fittings

BIM-MEP AUS Model Types Plant Equipment Fittings

All Services Dimensionally Accurate Design > Procure > Commission Scheduling Quality Assured, Independently Certified Models

Dimensionally Accurate

BIM-MEP AUS Models – Best of Breed Fittings /Equipment Manufacturer’s Proprietary Selection Software Procurement Scheduling Interface

BIM-MEP AUS Models – Equipment Scheduling Design Schedule - System Integration - Calculated system totals - Design Schedules - Model Status Procurement Schedule - Manufacturer/association defined schedule - Manufacturing Codes Commissioning / As-Built Schedule - NEBB and/or - Manufacturer defined schedules

BIM-MEP AUS Models – Manufacturer’s Procurement Interface Manufacturer’s Proprietary Selection Software Procurement Scheduling Interface TO CONTRACTOR

BIM-MEP AUS Models – Manufacturer’s Workflow

BIM-MEP AUS Models – Managed Content Service Provider Service Provider KarelCAD / TSI International Tier III Data Centre Secure Facilities Disaster Recovery

BIM-MEP AUS Models – Content Development Project Cycle