MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Civil Engineering 239 MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Spring 2011 Eddie Aquino, Jimmy Fu, Alvin Sarmiento
PROJECT TEAM Eddie AQUINO Jimmy FU Alvin SARMIENTO PROJECT MANAGER/3D MODELLER Jimmy FU PROJECT ENGINEER/ CONSTRUCTION SITE LOGISTICS Alvin SARMIENTO PROJECT ESTIMATOR/SCHEDULER
PROJECT REQUIREMENTS Three-story office building w/ underground garage Concrete waffle slab Spread footings Structural Steel framing with steel deck Penthouse structure CMU Steel joist roof Construction budget 10.5 million – 12 million
PROJECT LOCATION COMPONENT Street Looking Southeast COMPONENT Street Looking Southwest
PROJECT LOCATION 2.60 Acres IP (PD) URBAN Freeways
3D MODEL PDF Simulation
Cost Estimates Timberline Sage Ranked most used estimating software by ENR Primavera AutoCAD Timberline MS Project
Cost Estimates Features CSI MasterFormat Provides detailed labor, material, and equipment cost estimates Provides total cost/unit and total amount per item
Cost Estimates Problems Encountered Can not access Division 10-16 Mechanical and Electrical Systems
Cost Estimates Problems Encountered Final cost estimates from Timberline does not match cost estimates given in excel sheet
Schedule MS Project Timeline: January 27, 2011 – January 6, 2012 RS Means 2002 and Golden Bear Construction Inc. RS Means Office Building Schedule Superstructure Garage Measurement Daily Output based on RS Means production Approximate Completion Structural Steel Columns/Beams 114 Tons 14.4 Tons 8 days 1st Floor Metal Deck 18,900 SF 3,500 SF 6 days Concrete Fill Over Metal Deck 8,640 SF 3 days Waffle Slab 2,380 SF Fire Proofing 3,000 SF 7 days
Schedule
Schedule Accuracy of schedule and duration of project Advantages Each activity has a predecessor At any time during schedule, one or more activities can occur Advantages Simple to use Disadvantages Activities may not have any predecessor or successor
CONSTRUCTION SITE
CONSTRUCTION EQUIPMENT ACTION MOBILE INDUSTRY MODEL 1250 (46’x12’) LINDEN COMANSA LC 500 Series