MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL

Slides:



Advertisements
Similar presentations
Construction Method, Material Selection & Building Services
Advertisements

Building Codes, Zoning Ordinances
Construction Documents and Details
LOGIC PROGRAMMING IN A CONSTRUCTION PLANNING WORKBENCH Generation of a draft construction schedule from an IFC model (3D to 4D CAD)
Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Carriage house expansion at the Grover Cleveland birthplace
Work Breakdown Structure WBS
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Update on FCPS Construction/Renovation Projects May 2009.
Pacific Team TEAM INTRODUCTION Pacific 2001 Crystal LangARCHITECT Robert WrightENGINEER Edgar LeenenCONSTRUCTION MANAGER Will Clift APPRENTICE Robert.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
CUNY/CUCF NYCCT New Academic Building F.J. Sciame Construction Presentation August 12, 2013.
Concrete Fooring & Roofing System
Woodbridge High School Woodbridge School District Schematic Design for Woodbridge High School 17 January 2012.
Concrete Construction Part 1
Structural System Overview
Commercial Framing C D Prints Unit 13.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Comprehensive HVAC Pipe Estimating Software package Save estimating time by 50% Simple to use and inexpensive HVAC projects on computer Current customers.
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Final Report Terminal X McCarran International Airport.
Study of Top 500 Design Firms’ Plans to Adopt MasterFormat™ 2004 Kevin R. Miller, Ph.D. D. Mark Hutchings, Ph.D. Brigham Young University.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Steel Building Apartment- Design and Build
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
2001 Winter Presentation. Site Location Site View.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Ann & Richard Barshinger Life Science & Philosophy Building Franklin & Marshall College – Lancaster, PA Michael A. Hebert Structural Option Spring 2006.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Dan Packer Construction Management Senior Thesis April 16, 2002
Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Work Breakdown Structure WBS
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
INTEGRATED DESIGN SYSTEM  AUTOCAD  STAAD  STR. DESIGN SYSTEM  MICRO SOFT EXCEL.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Estimating and Scheduling CEE 492
6 DIMENSIONAL APPROACH TO CONSTRUCTION 2nd floor, S&R Building, Soonora Church 1st Cross Road, Elamkulam, Kochi 20, Kerala, India
Pier Partial GMP Proposal for Marine Structural June 1, 2017
ENGINEERING n MANAGEMENT n ENVIRONMENTAL
Pearl Condominiums Philadelphia, PA
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Design of a Commercial Shopping Center
Multistory Office Building
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
Commercial Office Building
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Structured Solutions Inc. IMS Definition
Coppin State University
Project: 250 West Street, Columbus, Ohio
Multi-Family Fourplex Apartment
Muskat Secondary School Project
Presentation transcript:

MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Civil Engineering 239 MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Spring 2011 Eddie Aquino, Jimmy Fu, Alvin Sarmiento

PROJECT TEAM Eddie AQUINO Jimmy FU Alvin SARMIENTO PROJECT MANAGER/3D MODELLER Jimmy FU PROJECT ENGINEER/ CONSTRUCTION SITE LOGISTICS Alvin SARMIENTO PROJECT ESTIMATOR/SCHEDULER

PROJECT REQUIREMENTS Three-story office building w/ underground garage Concrete waffle slab Spread footings Structural Steel framing with steel deck Penthouse structure CMU Steel joist roof Construction budget 10.5 million – 12 million

PROJECT LOCATION COMPONENT Street Looking Southeast COMPONENT Street Looking Southwest

PROJECT LOCATION 2.60 Acres IP (PD) URBAN Freeways

3D MODEL PDF Simulation

Cost Estimates Timberline Sage Ranked most used estimating software by ENR Primavera AutoCAD Timberline MS Project

Cost Estimates Features CSI MasterFormat Provides detailed labor, material, and equipment cost estimates Provides total cost/unit and total amount per item

Cost Estimates Problems Encountered Can not access Division 10-16 Mechanical and Electrical Systems

Cost Estimates Problems Encountered Final cost estimates from Timberline does not match cost estimates given in excel sheet

Schedule MS Project Timeline: January 27, 2011 – January 6, 2012 RS Means 2002 and Golden Bear Construction Inc. RS Means Office Building Schedule Superstructure Garage Measurement Daily Output based on RS Means production Approximate Completion Structural Steel Columns/Beams 114 Tons 14.4 Tons 8 days 1st Floor Metal Deck 18,900 SF 3,500 SF 6 days Concrete Fill Over Metal Deck 8,640 SF 3 days Waffle Slab 2,380 SF Fire Proofing 3,000 SF 7 days

Schedule

Schedule Accuracy of schedule and duration of project Advantages Each activity has a predecessor At any time during schedule, one or more activities can occur Advantages Simple to use Disadvantages Activities may not have any predecessor or successor

CONSTRUCTION SITE

CONSTRUCTION EQUIPMENT ACTION MOBILE INDUSTRY MODEL 1250 (46’x12’) LINDEN COMANSA LC 500 Series