Nagra National Cooperative for the Disposal of Radioactive Waste Switzerland Aspö 14 May 2014, Hanspeter Weber.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

The Mythology of the Back End of the Nuclear Fuel Cycle Allison Macfarlane Program in Science, Technology & Society MIT April 24, 2006.
Swiss Federal Nuclear Safety Inspectorate (HSK) Nuclear Waste Management in Europe – and the Swiss Model EPP-ED Hearing on the Future of Nuclear Waste.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
EURATOM RESEARCH AND TRAINING ON NUCLEAR ENERGY. Introduction Waste management and disposal is a responsibility for the present generation benefiting.
D:\data\PowerPoint\Maravic\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
Lithuanian concept for disposal of
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
Radioactive waste : Stakes and debates Laurence CHABANNE-POUZYNIN General Counsel Public, Nuclear and Evironmental Law Department INLA Buenos Aires,
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
International Workshop on High Level Radioactive Waste and Spent Fuel Management - Storage and Disposal Status of U.S. Used Nuclear Fuel Disposition Program.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
Dounreay Nuclear and Chemical Land Contamination.
Licensing of Nuclear Power Plants in Pakistan
The SKB Spent Fuel Disposal Project – License Application
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
MODULE “STRATEGY DEVELOPMENT”
Storage and disposal of mercury and mercury waste in Asia - Conclusions Sven Hagemann GRS.
Protection Against Occupational Exposure
John Wagner Oak Ridge National Laboratory Nuclear Fuels Storage and Transportation Planning Project U.S. Department of Energy 10 th Meeting of the U.S.-Argentina.
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
IAEA NSF Conference 2010 Nuclear Spent Fuel Management in Spain Pablo Zuloaga.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
TM Technical Meeting on the Disposal of Intermediate Level Waste
1 GNSSN Workshop| Nuclear Regulation in Switzerland Hannes Hänggi | Bonn, 5 July 2011 Swiss Federal Nuclear Safety Inspectorate ENSI Hannes Hänggi Swiss.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Experimental Research on Nuclear Waste Disposal (ERNW) Radioactive Waste Management in France Alexis BOURDEAUX, France Wednesday 19/05/2010.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
ILW disposal in the UK Presentation at IAEA TM-45865, September 2013 Cherry Tweed – Chief Scientific Advisor.
The Swiss geological programme and the role of storage Jürg Schneider National Cooperative for the Disposal of Radioactive Waste International Workshop.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
David G Bennett December 2014
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Safety-related Issues for the Disposal of Intermediate Level Waste (ILW) Dr. Jürgen Wollrath Federal Office for Radiation Protection (BfS) Department Safety.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Containment and.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Program and Quality.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
Structure of a Safety Case (NEA). The Multibarrier Concept each barrier acting passively in concert with the others to isolate, contain and reduce impacts.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
1 Waste volumes and categories Low active waste Medium active waste High active waste Short livedCategory A Category C Long livedCategory B Category C.
The Safety Case Radioactive Waste and Spent Fuel Management Unit
Status of German Programme
Radioactive waste repositories
Back-end options for a small country with long term nuclear program
Communication and Consultation with Interested Parties by the RB
Safety Case Components and Documentation
Jiří Slovák, Vítězslav Duda
Radioactive Waste and Spent Fuel Management in Hungary
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
Handling of Future Human Actions in the safety assessment SR-Site
Presentation transcript:

Nagra National Cooperative for the Disposal of Radioactive Waste Switzerland Aspö 14 May 2014, Hanspeter Weber

Oktober 2007/Folienmodul Nagra – purpose and organisation  Cooperative of the waste producers (utilities and Government)  Legal mandate contained in the Nuclear Energy Act of 2003  Financed by the waste producers – NPPs 97%, Government 3%; contained in the electricity price: ~1 cent / KWh  Around 100 employees, mainly scientists and engineers  Head office in Wettingen, Canton Aargau  Research in 2 underground rock laboratories (Grimsel & Mont Terri)  Collaborative research with more than 10 countries  Expenditure: around CHF 35 million per year In 1972, Nagra (National Cooperative for the Disposal of Radioactive Waste) was established by the Swiss waste producers

Oktober 2007/Folienmodul Nagra – mission and strategy Mission:  To construct safe geological repositories for all types of radioactive waste arising in Switzerland, without undue delay and at reasonable cost. Strategy:  To identify sites for the L/ILW and HLW repositories within the framework set out by the Sectoral Plan for Deep Geological Repositories and to submit the required general licence applications.  To ensure sufficient interim storage capacity for waste from the power plants until the heat production from high-level waste has decayed sufficiently and the required geological repositories are available.

Oktober 2007/Folienmodul  Maintaining a national inventory of all waste  Developing concepts for deep geological disposal  Preparing for site selection / site investigations  Performing safety analyses  Carrying out research and development  Public relations, information and communication activities  Commercial services for third parties Nagra – tasks

Oktober 2007/Folienmodul Nagra – key players in the waste management programme Legal framework Licensing authorityRegulatory authority  Fed. Council  Parliament  Voting public  Fed. Council  DETEC  ENSI Expert bodies and commissions  AGNEBFederal Interagency Working Group on Nuclear Waste Management  KNECommission for Nuclear Waste Management  KNSFederal Commission for Nuclear Safety

Oktober 2007/Folienmodul Concept report; 100 potential sites, reduced to 20 then 3 Project Gewähr (Oberbauenstock ) submitted Start of investigations at Wellenberg Wellenberg identified as first priority site for L/ILW GNW established; general licence application submitted Wellenberg concession refused twice in cantonal referendum Start of repository operation /2002 from 2050 Applications for site explorations: Oberbauenstock, Bois de la Glaive, Piz Pian Grand 1983 Re-start of Nagra‘s L/ILW programme 2003 Nagra – L/ILW programme Approval of feasibility demonstration for L/ILW 1988 Start of the Sectoral Plan process 2008 General licence for the L/ILW repository In situ rock laboratory / construction phase from 2030 from 2035

Oktober 2007/Folienmodul Concept report on nuclear waste management Regional investigations in N. Switzerland (crystalline/sediments) Start of operation of the Grimsel Test Site (crystalline URL) Project Gewähr (crystalline) submitted Federal Council decision on Gewähr: investigations extended to clays / start of sediment programme Start of operation of Mont Terri (Opalinus Clay URL) Opalinus Clay project (feasibility study submitted to authorities) Feasibility study approved by Federal Council General licence for the HLW repository In situ rock laboratory / construction phase Start of repository operation from 2030 from 2035 from 2060 Nagra - HLW programme Start of Sectoral Plan process 2008

Oktober 2007/Folienmodul Production categories and consumption 1950 – 2007 Run-of-river Pump storage * Other Nuclear power Electricity mix % nuclear 56 % hydropower 5 % other Consumption *Production today comes mainly from waste incineration plants and cogeneration in industry and small plants; only 0.1 % comes from “alternative“ sources such as photovoltaics, wind, etc.

Oktober 2007/Folienmodul Production of the Swiss nuclear power plants  5 NPPs – installed output3,200 MW  Annual productionca bio. kWh  Percentage of total power productionca. 40 %  Average availabilityca. 94 % Nuclear power plants  Leibstadt (KKL)1165 MWe BWR  Gösgen (KKG)970 MWe PWR  Beznau I (KKB-I)365 MWe PWR  Beznau II (KKB-II)365 MWe PWR  Mühleberg (KKM)355 MWe BWR

Oktober 2007/Folienmodul Swiss nuclear power plants 6

Oktober 2007/Folienmodul Volumes and radioactivity 1 Assumptions: 50-year operation for all Swiss reactors; fuel consumption 3574 t, 2435 t for direct disposal, 1139 t for reprocessing; substitution of equivalent volume of activity of L/ILW from reprocessing (BNFL) returned as HLW glass 2 Volumes are dominated by packaging in disposal containers - more space is required than for interim storage 3 Total waste activity is Bq (reference year 2035) 4 «Non-packaged»: Volumes of «moulds» (steel casks with glass from reprocessing) and rectangular fuel assemblies, including spaces between fuel rods L/ILW repositoryILW repositoryHLW repository conditionedpackagedconditionedpackaged «non- packaged» 4 glass and SF packaged Volumes66,020 m 3 89,410 m m m m m 3 Percent % 97.3 %90.3 %0.8 %2.3 %1.9 %7.4 % 3 Inventory4.7 x Bq3.4 x Bq3.0 x Bq Percent % 1.6 %0.1 %98.3 %

Oktober 2007/Folienmodul  L/ILW immobilised in cement Safety barriers for low- and intermediate-level waste  Drum with low- level waste  Disposal caverns for L/ILW with emplaced containers Rock Drums cemented in container Backfilling of caverns with special mortar

Oktober 2007/Folienmodul Safety barriers for high-level waste Matrix: Radionuclides in low-solubility glass or fuel pellets Disposal container Bentonite backfill Host rock Disposal containers for vitrified HLW (left) and spent fuel (right)

Oktober 2007/Folienmodul The geology of Switzerland Swiss geology has been investigated in depth

Oktober 2007/Folienmodul HLW programme – background  1980s: Investigation of the crystalline basement of Northern Switzerland  Project Gewähr 1985: Feasibility study on safe disposal  Given the poor predictability of the crystalline bedrock, the Federal Council calls for investigations to be extended to include sedimentary formations  1994: Selection of the Opalinus Clay option and the Zürcher Weinland area for extensive field investigations  December 2002: Nagra submits the Entsorgungsnachweis (demonstration of disposal feasibility) for spent fuel, vitrified HLW and long-lived ILW  28th June 2006: Federal Council approves the Entsorgungsnachweis  2nd April 2008: Federal Council approves the conceptual part of the Sectoral Plan  6th November 2008: Nagra proposes three siting regions (Zürcher Weinland, North of Lägeren and Bözberg) for HLW

Oktober 2007/Folienmodul HLW programme – host rock  Opalinus Clay Partly clay-rich, low-permeability rock formations located above and below the Opalinus Clay  The potential host rocks considered up till Lower Freshwater Molasse and crystalline bedrock – do not fulfil the stricter requirements in the Sectoral Plan (permeability, homogeneity and ease of characterisation) and are therefore now deferred. The Opalinus Clay remains as the preferred host rock.

Oktober 2007/Folienmodul Geological siting regions

Oktober 2007/Folienmodul Opalinus Clay host rock – origin, properties  Clay-rich marine deposit: homogeneous, large spatial extent  Very low permeability  Only slight tectonic deformation in certain areas (Tabular Jura)  Easy to investigate

Oktober 2007/Folienmodul Opalinus Clay host rock: Nature's example Fossil discovered in Benken Name: Leioceras Opalinum Stratum: Opalinus Clay Depth: 652 m below surface Preserved in the Opalinus Clay for around 180 million years  Mother of pearl layer preserved: clear example of conservation properties of clay  Porewater still contains original seawater: no water flow

Oktober 2007/Folienmodul 3D seismic surveys using vibrator vehicles Visitors at the Benken drillsite Regional investigations (Zürcher Weinland)

Oktober 2007/Folienmodul Benken borehole 1998 Regional investigations (Zürcher Weinland)

Oktober 2007/Folienmodul 2D seismic surveyWeiach borehole Regional investigations (Northern Switzerland)

Oktober 2007/Folienmodul L/ILW programme – background  1970s: Investigation of a range of disposal concepts (surface/deep repositories) and host rocks  Project Gewähr 1985: Feasibility demonstration of safe disposal  1987: Start of investigations at Wellenberg (Canton Nidwalden)  3rd June 1988: Federal Council approves Nagra’s feasibility demonstration (Project Gewähr) for L/ILW for the Oberbauenstock model site in Canton Uri  1993: Selection of Wellenberg as the site for a L/ILW repository  1995/2002: Concession applications rejected twice by the voters of Nidwalden. Wellenberg project abandoned  2003: Re-start of the L/ILW programme  2008: Approval of the conceptual part of the Sectoral Plan; Nagra proposes 6 siting regions for L/ILW

Oktober 2007/Folienmodul Geological situation and host rock  At repository depth, the geology ensures spatial separation of the waste from the biosphere, where processes occur rapidly.  The geology provides a physically and chemically stable environment in which the engineered barriers remain functional over long times.  The geology has a further long-term barrier effect, in that it retards and restricts the migration of radioactive substances released from the repository.

Oktober 2007/Folienmodul Which host rocks? Pre-selection of 26 host rocks:  HLW: Opalinus Clay  L/ILW: Opalinus Clay, 'Brauner Dogger'‚ Effingen Beds, marl formations of the Helveticum (Alps) Example: profile N. Switzerland 4

Oktober 2007/Folienmodul Large-scale areas for further consideration and preferred host rocks HLW repository  N. Switzerland: Opalinus Clay L/ILW repository  N. Switzerland: Opalinus Clay, 'Brauner Dogger', Effingen Beds  Alps: Marls of the Helveticum 4 Where are the host rocks?

Oktober 2007/Folienmodul Distribution of host rocks in Northern Switzerland Opalinus Clay Brauner Dogger Effingen Beds Also: marl deposits (Wellenberg) Depth to approx m below terrain 4

Oktober 2007/Folienmodul Siting regions: What has to be avoided? 5 Zones to be avoided (neotectonics) … insufficient thickness and unsuitable depth of host rocks Overdeepened rock channels (glacier erosion) Zones with small-scale dissociation Regional fault zones

Oktober 2007/Folienmodul Proposed geological siting regions for L/ILW and HLW 5  Result of systematic application of the requirements in the Sectoral Plan  Takes into account geological possibilities in the whole of Switzerland  Derived by systematic, stepwise narrowing-down from the viewpoint of safety and engineering feasibility

Oktober 2007/Folienmodul Retrieval of a HLW container Retrievability / monitoring: legal requirement

Oktober 2007/Folienmodul Pilot facility  The pilot facility concept can be traced back to the recommendation of the EKRA expert group, who recognised the possibility of observing the physical and chemical processes presumed to occur in the main facility using a smaller but realistic facility with a representative waste volume.  For this purpose, the pilot facility has to be representative of the main facility in terms of both construction and inventory and equipped with monitoring instrumentation.  The functioning of the barrier system is monitored in the pilot facility and its surroundings; the results allow conclusions to be drawn about the correct functioning the main facility.

Oktober 2007/Folienmodul Monitoring  Environmental monitoring includes environmental radioactivity in the vicinity of the geological repository.  Monitoring of the geological environment in parallel with repository construction and operation includes state-of-the-art measurements that provide information on the behaviour of the repository and its surroundings as input for the assessment of operational and long-term safety.  During the operational phase, radiological monitoring is also performed to ensure that radiological protection requirements are being met.  The purpose of monitoring in the pilot facility is to observe processes relating to the waste and the safety barriers.

Oktober 2007/Folienmodul Retrieval of waste  Waste retrieval without major effort has to be assured up to the end of the monitoring phase (Art. 37, Nuclear Energy Act).  Retrieval of emplaced waste should be undertaken when deviations from design-conform behaviour in the repository cannot be remedied using technical measures; at the same time long-term safety must be assured.  The concept for waste retrieval without major effort is to be submitted together with the construction licence application and must describe the method to be used for retrieving the waste.

Oktober 2007/Folienmodul Closure  A geological repository has to be designed in such a way that it can be closed within a few years (Art.11, Nuclear Energy Ordinance, cf. former protection objective 3 of Guideline HSK R-21).  Backfilling and sealing of a geological repository are to be carried out in such a way that long-term safety is assured (Art. 69, Nuclear Energy Ordinance).  The plan for closure has to be reviewed every ten years and updated if necessary (Art. 42, Nuclear Energy Ordinance).  An application for closure has to be submitted by the repository operator (Art. 63 and 50, Nuclear Energy Act).  Closure activities are ordered by the Federal Council (Art. 39, Nuclear Energy Act).

Oktober 2007/Folienmodul Marking the repository  The Federal Council prescribes the permanent marking of the repository (Art. 40 par. 7, Nuclear Energy Act).  The Guideline requires the repository operator to develop suitable proposals.  Marking of a geological repository has to be tailored to the actual site, host rock and disposal concept.  The concept has to be submitted with the construction licence application and becomes more detailed in subsequent project phases. Concepts for repository marking are the subject of international discussion.  To date, the IAEA has made no recommendations regarding implementation of repository marking.

Oktober 2007/Folienmodul Zeitplan Realisierung Tiefenlager SMA

Oktober 2007/Folienmodul Zeitplan Realisierung Tiefenlager HAA

Thank you for your attention