1 NAB Jurisdictional Determination Process Maryland Wetlands Forum April 14, 2008 Incorporating the 28 January 2008 HQUSACE Memorandum Regarding the Modified.

Slides:



Advertisements
Similar presentations
2008 TERCAP Forum Lisa Emrich, MSN, RN, and Holly Fischer, JD, General Counsel (Ohio)
Advertisements

1 © 2008 California County Superintendents Educational Services Association Valenzuela/California High School Exit Exam (CAHSEE) Lawsuit Settlement California.
ASEAN REGIONAL FORUM Export Licensing Experts Meeting Effective Export Controls Lynne.C.Sabatino- Permit Officer Export Controls Division.
Pre-Service Advisory Group July 28, Current Standards – Whats Missing? Illinois Professional Teaching Standards Language Arts Standards for All.
Issuing Officer Training J. Ronald DeJuliis, Commissioner
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Extensions by Appeal Credentials and Permits
(Individuals with Disabilities Education Improvement Act) and
Section 4(f) and Section 6(f) Updates questions to:
Financial Aid Renewal
Catholic School Councils A summary of 19 page document listed on school website.
ESEA Title III AMAOs Ensuring Academic Success for English Learners Dr. Shereen Tabrizi, Manager Special Populations Unit Maria Silva, EL Consultant Office.
Speech/Language Pathologists An Overview. Federal regulations permit and encourage school systems to recover costs from public health insurance (Medicaid)
Permitting and Design Guidelines Working with Regulators Melissa Mormilo, P.E., LEED AP DOWL Engineers.
IDEM Water Quality Certification for Impacts to Waters of the State Martha Clark Mettler Deputy Assistant Commissioner Office of Water Quality, IDEM.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
April  Side-by-side comparison of definitions: Justin Russell, OSU (HANDOUT)
US Army Corps of Engineers BUILDING STRONG ® Lee Anne Devine Chief, South Section Regulatory Branch Louisville District Coal Mining Activities and Section.
Special Education Accountability Reviews Let’s put the pieces together March 25, 2015.
Process-oriented System Analysis Qualitative Process Analysis.
Connecticut Department of Transportation Bureau of Policy & Planning.
SEMINAR NAIC/ASSAL/SVS REGULATION & SUPERVISION OF MARKET CONDUCT © 2014 National Association of Insurance Commissioners Company Licensing.
Ensuring a desirable workplace which creates a diverse team of all kinds of people and professions. To be a progressive state transportation agency recognized.
Procedures for Applying for an Alternative Oyster Culture Permit Oyster Advisory Committee April 18, 2013 ________________________________________.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Clean Water Act Section 404 How it affects your airport during project implementation.
ADWR COMPLIANCE AND ENFORCEMENT MANUAL PHOENIX AMA GUAC 1/6/09.
Section 404 Permits Update
August 2,  404 Assumption Review  Project Schedule Review  Summary of Stakeholder Outreach Meetings  Status of Assumption Effort  Statutory.
 The IRB application  The Review Process  Summary of Protocol  Appendixes  Informed Consent  Recruiting materials  Research Instruments  Other.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
Doctoral Coordinators: Approve for Admission or Waitlist ADMIT.
VALIDATION OF PLANNING & OTHER APPLICATIONS A brief guide for Planning Agents.
Office Procedure Manual and Checklist W. Mack Palmour Director of Admissions Gainesville State College.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
TREE REMOVAL POSTING PROCESS On-site posting on site (yellow sign) and website 5 Working Days Building Permit Application and Tree Removal Plans (sent.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District Nationwide Permit Overview Cindy House-Pearson Chief, Inland.
N A T I O N A L A S S O C I A T I O N O F I N T E R C O L L E G I A T E A T H L E T I C S Exception to a Standing Rule.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
Medicaid EHR Incentive Program Updates eHealth Services and Support September 24, 2014 Today’s presenter: Nicole Bennett, Provider Enrollment and Verification.
Chapter 15, Amended Article II Appeals To EPC Presented by EPD May 1, 2007 Presented by EPD May 1, 2007 BCC Public Hearing BCC Public Hearing.
Health IT Product Information and Disclosures Under the 2015 Edition Final Rule Joint Health IT Policy and Standards Committee Certified Technology Comparison.
STANDARDS AND REGULATIONS PRESENTATION TO PASC XXX 26 April 2007.
The Galloway at Owens Below Market Rent Program. Purpose of This Information Session ▪ The purpose of the session is to review the pre- application process.
6/18/2016 DES / AzEIP 2011 Cycle Two Self Report Overview & Training Cycle Two Self Report Overview & Training.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Restoration and Regulation Discussion
  NEW JERSEY ALTERNATE ROUTE CAREER AND TECHNICAL EDUCATION CERTIFICATE OF ELIGIBILITY   EDUCATOR  PREPARATION PROGRAM (CTE-CE EPP)
Dependent Eligibility Audit CEWW Health Insurance Consortium
Section 236 Program Year End Requirements Excess Income Reporting Annual Certification of Use (ACU) (for Retained Excess Income) Annual Certification.
End User Process Help - (Canada)
End User Process Help - (Canada)
An Introduction to the Fairfax County Communication Strategy
An Introduction to the Fairfax County Communication Strategy
Doctoral Coordinators: Approve for Admission or Waitlist
Part C State Performance Plan/Annual Performance Report:
Overview of the Reissuance of 401 Water Quality General Certifications
Animal Utilization Protocol (AUP) Approval Process
Sutherland Phonological Awareness Test – School Entry©
ASSISTANCE DOGS INTERNATIONAL ACCREDITATION PROCEDURES 2018
Warm Up, April 27th First: Get your folder, get any documents you’ve completed, and file them. Of the documents listed below, identify the titles of all.
3. Check LOA more than 3 times?
OFFICE OF DISPUTE RESOLUTION
Restoration and Regulation Discussion
N.J.A.C. 6A:16 Programs to Support Student Development
Town Hall Meeting 2011 Issues
Animal Utilization Protocol (AUP) Approval Process
Project Manager / Utility Liaison
Presentation transcript:

1 NAB Jurisdictional Determination Process Maryland Wetlands Forum April 14, 2008 Incorporating the 28 January 2008 HQUSACE Memorandum Regarding the Modified Process for Coordination Jurisdictional Determinations

2 Pre-Applications Preapplication without JD (general information only, purpose is to educate, not enough information to provide JD) If applicant requests information regarding whether an area is regulated or not, then a preapplication with JD will be required. See below No JD Form. No posting or coordination. No letter provided. Preapplication with JD (presence/absence, field, & office) Corps verifies JD. Approved JD form is required. Coordinate SNDs and post all. Approved JD is an appealable action. Corps sends letter directly to applicant.

3 All isolated water determinations, including those associated with MDSPGP or non-reporting NWP applications Appealable JD Approved JD is required. In MD, no coordination of isolated waters determinations with EPA is required. Post all on Regulatory website. Approved JD is an appealable action. Letter sent directly to the applicant with cc to MDE and consultant. Isolated Waters

4 General Permit Applications MDSPGP Category I MDE verifies activity and performs JD. No JD form required. No posting or coordination. State sends MDSPGP-3 Category I verification letter to permittee.

5 General Permit Applications MDSPGP Category I & II with Corps special conditions MDSPGP Category III Non-reporting NWP Abbreviated preliminary JD form prepared for the file. Documentation of the SND, if applicable, included to document that waters may or may not be present. No coordination, posting, or appeal language. Preliminary JDs are advisory and may not be appealed. Project proponent can specifically request an approved JD. -Corps sends MDSPGP verification letter to MDE for inclusion with State permit/license -Corps sends NWP verification letter to permittee with copy to MDE

6 Individual permits, LOPs, permit denials, stand-alone JDs, and reporting NWPs Corps verifies activity & JD. Approved JD form required. Coordinate SNDs and post all. Approved JD is an appealable action. Permit with approved JD sent directly to applicant with cc to MDE and consultant. Individual Permits, LOPs, Stand-Alone JDs, and Reporting NWPs Appealable JD