Further assessment or Pending BEO Accept - Retry Accept – SP Advised C12: Reject – Not enabled C14: Reject – AEA Site C16: Reject – Not SDSL C18: Reject.

Slides:



Advertisements
Similar presentations
Online Timesheet System 1) Accessing the Online Timesheet System 2) Reviewing/Populating your timesheet 3) Saving/Submitting your timesheet 4) Status and.
Advertisements

INTRODUCING THE NEW NDR + On-Line Meeting and Conference Call Access Code # Deb Salinger – Training material available.
Please insure that you have the following present, in order to proceed with the Advantage card internet set up 1.Advantage MasterCard that requires activation.
Welcome to the Manage Orders lesson for the North Carolina Immunization Branch. Contents: Placing a State Supplied Order Accepting a State Supplied Order.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Guide to using the roll out plans on BTWholesale.comBTWholesale.com.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Service Access Management Tool Tour: Contract Number
Indian Institute of Technology Kanpur DOAA Office Welcome to Online Academic Registration System (OARS) For Add-Drop in your Current Semester Courses.
MI Bridges Self Service Expansion
Interconnect Policy & Contract HL SAN + 1 Month (Max), unless extension requested by Operator,and agreed by BT, due to insufficient.
ECATS RCCA CAMP PROCESS ENHANCEMENTS
WebTime Entry Training for Work-Study Students _______________________________.
Timesheets Time Reporting System. Web-based application supporting the process of time reporting. Offered in SaaS model (Software as a Service) or standard.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
E-Nomination – Electronic procedure for the nomination of exchange students.
Pre-registration training website The pre-registration portfolio is completed in an online capacity. This e- presentation will guide you though a series.
Computer Science: A Structured Programming Approach Using C Stacks A stack is a linear list in which all additions and deletions are restricted to.
12-CRS-0106 REVISED 8 FEB 2013 PRESENTS Payment Functionality.
Academic Records and Registration Office The Hong Kong University of Science & Technology Enquiry: , ,
BT Wholesale Broadband Escalations Portal Adding or Retrieving Notes
E-Portfolio July2014 Managing Multi-source Feedback.
Web Filtering. ExchangeDefender Web Filtering provides policy-controlled protection from dangerous content on the web. Web Filtering is agent based, allowing.
Indian Institute of Technology Kanpur DOAA Office Welcome to Online Academic Registration System (OARS) For Add-Drop in your Current Semester Courses.
ELECTION DAY ACTIVITIES. Checklist of contents of the box PCOS machine and its power adaptor Thirteen (13) rolls of official thermal paper Three (3)
Indistar: Updates, Additions, and Coming Soon Stephanie Benedict, ADI.
This document does not constitute an offer. CenturyLink services or equipment are only made available pursuant to an executed CenturyLink agreement. ©
Information for students (Modules) Welcome to the S 3 P system. This PowerPoint will give you details of how module sign-up works on the system.
Pre-registration training website The pre-registration e-portfolio will continue to be completed in an online capacity for the pre-registration.
1 Australian Newspapers Digitisation Program Development of the Newspapers Content Management System Rose Holley – ANDP Manager ANPlan/ANDP Workshop, 28.
ShelterPoint™ Data-Entry Workflows. ShelterPoint v5.2.3.
CGMA Case Management Program (CGMA-CMP) The Coast Guard Mutual Assistance Case Management Program (CGMA-CMP) is designed to allow CGMA field sites to initiate.
Collateral Underwriting (“CU”) Training Taking Appraisal Review To The Next Level.
Principal’s Per Session Application Screen Shots
10 August 2005Benchmark/Mentor Student Guide Page 1 CPS Benchmark/Mentor Student Guide Internet Edition.
Automated Assessment Management System. The Assessment Cycle Trainee | Learner Dashboard Trainer Dashboard Employer Dashboard Verifier Dashboard Assessor.
AARP Volunteer Recruitment System District Coordinators Meeting November 2009 AARP Tax-Aide.
xxx IEEE MEDIA INDEPENDENT HANDOVER DCN: xxxx Title: Network-Initiated Handover Procedure Update Date Submitted: October.
Test Delivery System (TDS) & Online Reporting System (ORS) for ELPA21 Online Testing Training Webinar Copyright © 2014 American Institutes for Research.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
COPYRIGHT VITS 2013 June 2013 VITS KIT Training Document for Telephone Interpreting Assignments.
Spring 2012 Comm Internship Assessment – Supervisors’ Evaluation Answers.
Opportunity, Threat or Totally Irrelevant London, 18/09/03 Carrier Pre-Select and Wholesale Line Rental © 2003 Frost & Sullivan. All rights reserved. This.
Career Ready Coordinators Training Session one Website navigation Coordinator dashboard Student recruitment and selection.
Performance Evaluations
Regional Skills Forum 2016:
Message Center Training
BTSEC03 & RC01 REFERENCE MATERIAL
How to pay for and enrol in a course
Teacher Hand Scoring System
Customer Overview Pack – September 2018
Orders & Shipment Tracking
Customer Overview Pack – August 2018
Adding and Editing Users
Appeals Process Screener Training Module Module 6
Teacher Hand Scoring System
Teacher Hand Scoring System
Participant Retention
Xoserve IX Refresh Update
Customer Overview Pack – September 2018
Smart Business for eGeneration Companies
Assessment and Quality Assurance
Please insert Title Please insert sub-title 1
User Manual - Applicant
Scheme for Growth Pilot
Credit Accumulation Route
Hulu com forgot | | Hulu forgot password
and Forecasting Resources
Caplink Document Statuses
Presentation transcript:

Further assessment or Pending BEO Accept - Retry Accept – SP Advised C12: Reject – Not enabled C14: Reject – AEA Site C16: Reject – Not SDSL C18: Reject – Not Real Time C30: Reject – SP Advised Accept – Provide PSID Accept – Build Reservation Accept – Build VP Accept – SP Advised Start C10: Reject – Cannot reserve If same problem – re-assess Initial / Repeat Assessment Initial failure likely due to data issue Order cannot be met so needs to be rejected BEO use supervisor override after verifying if order can be accepted, or reject due to capacity not reservable = ‘Log Interest’ SMC manually issue VP Order / Complete Reservation task C19: Reject – No Real Time capacity Reservation successful BT Wholesale. BT Datastream VP Capacity Assessment process - Issue 1, 16/12/04

Reason For Rejected Order C10: Reject – Cannot reserve Thank you for your order. Unfortunately, your order has been rejected, as there is insufficient reservable capacity at this exchange. We have logged your interest at this exchange. We will contact you when new capacity has been added, which is likely to be (insert month), to see if you still wish to reserve capacity. Contact with Service Providers will be made on a ”time-arrived order” basis. Please also refer to the BT Datastream Hourglass Report for information on the availability of capacity at this exchange. Log of interest is retained C12: Reject – Not enabled Thank you for your order. Unfortunately, your order has been rejected, as this exchange is not yet enabled for DSL services. We have logged your interest at this exchange and will contact you when this exchange is enabled to see if you wish to reserve capacity at that time. Contact will be made with interested Service Providers on a ”time-arrived order” basis. Please refer also to the BT Datastream Hourglass Report for information as to when this exchange will become enabled. Log of interest is retained C14: Reject – AEA Site Thank you for your order. Unfortunately, your order has been rejected, as this is an Exchange Activate exchange and is not enabled for BT Datastream services Log of interest is not retained C16: Reject – Not SDSL Thank you for your order. Unfortunately, your order has been rejected, as this exchange is not enabled for SDSL services. Please refer to the BT Datastream Hourglass Report for a list of which exchanges support SDSL services. Log of interest is not retained BT Wholesale. BT Datastream VP Capacity Assessment process - Issue 1, 16/12/04

Reason For Rejected Order C18: Reject – Not Real Time Thank you for your order. Unfortunately, your order has been rejected, as this exchange is not enabled for Real-Time services. Please refer to the BT Datastream Hourglass Report for a list of which exchanges support Real-Time services. Log of interest is not retained C19: Reject – No Real Time capacity Thank you for your order. Unfortunately, your order has been rejected, as there is insufficient real-time service capacity at this exchange. We have logged your interest at this exchange. We will contact you when new real- time capacity has been added, which is likely to be (insert month), to see if you still wish to reserve capacity. Contact with Service Providers will be made on a ”time-arrived order” basis. Please also refer to the BT Datastream Hourglass Report for information on the availability of real-time capacity at this exchange. This report is available from in the BT Datastream product section. Log of interest is retained. C30: Reject – SP Advised FINAL RESTING STAGE FOR ORDER. NO MESSAGE REQUIRED AT THIS STAGE BT Wholesale. BT Datastream VP Capacity Assessment process - Issue 1, 16/12/04