Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System Final Design Review Matt Christison, Scot Lewis February 23,

Slides:



Advertisements
Similar presentations
Exterior Window and Door Frames
Advertisements

The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Randy Wax, MD, FRCPC (Critical Care)
Tent Pitching.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Decontamination at a suspected radiological incident.
Food Safety Site Evaluations. 1.) Learn what the customer does 2.) Specific areas of concern 3.) Current treatment technologies 4.) What are their food.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Working with Animals in the Hood or Change Station Patricia Matos Julie Watson.
Rev. A Control Number XXXXXXXXXXX Effective Date 10/2/2008 Field Work Instructions for Placard replacement Functional Trainer Page 1/4 Revised Date 10/2/2008.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Digitarium Mobile Planetarium Assembly and Disassembly Procedures Grunts Bob Law and Ken Mitchell Photos Barbara Mallon Assembled by Ken Mitchell Livermore.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
ICRA Panel System Installation Instructions
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
1 14” 52” Garment 14” 21” 10” Fabric Arm Restraint Garment for 6-12 Month Olds You’ll need: Two pieces of lightweight knit overlock fabric (stretches one.
Reefer Cargo Brine Circulation systems
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Quick and Easy Model Building. 3D Models Purpose: To represent the final design in a physical form that is as realistic as possible, computer- generated.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions BioRad Set Up 8 groups Grossmont Kit.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
STATUS of 6m ANTENNA BASE Matt Fleming 8/24/04 Note 6m = BIMA.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Candela Display Systems 3x2 Interactive Video Wall System.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
NTN FIELD LAB PROCEDURES  Weighing  Sample Conditions  Decanting  Shipping.
American Iron Sports This is a picture of the interior of a steel building before it is made into a 4 stall Master Pitch batting cage. This is a picture.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Optional LED or Strobe Light BarStrobe Grill Lights Optional LED or Strobe Grill Lights Full Seat Recline Comfortable for 6’4” personnel Large, Easy to.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
Assembly Instructions SoCo + 2 glasses.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
Independent Work Centers – Middle School Classroom
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Sling Safety (Level 1 Rigger). Objectives Be familiar with regulations regarding slings. Be familiar with regulations regarding slings. Understand safe.
Diesel Building Fire Damper Failing Closed Mike Walker TVA.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NCSX Day 1 ECC (Extra Cheap Cryostat) Cryostat Configuration Status Report – September 30, 2006.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Clean Broken Glassware Container
Microscope Close-Out Photos
Endcap shielding senarios:
Jack and Hoist Safety.
LARP Vertical Test Facility
A F Cargo Loading System
Gel Electrophoresis Teacher Instructions BioRad Set Up 12 groups
GLOVE BAGGING & PLASTICIZING
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Multi-Casualty Tent Set Up
Toledo I-280 Crane Accident
February 2, February 2,

Required tools for installation of a V-1020C speaker with V-9914 bridge.
Toledo I-280 Crane Accident
Maintenance.
Cheesy Rice A guide to setting up and packaging.
A guide to setting up and packaging

Presentation transcript:

Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System Final Design Review Matt Christison, Scot Lewis February 23, 2011 S a n d i a N a t i o n a l L a b o r a t o r i e s

Concept of Operations Pre-SNM (Today)

Top Tent main section is installed SNM Shot hardware is installed SNM Bottom Lid is installed (no cap installed) Concept of Operations Bottom tent installed SNM Top Lids installed

Flat Lid installed with tent in place (there are 2 configurations of the lid) SHOT Concept of Operations Removable “sunroof” interfaces to lid using Velcro

Top tent completed Top Air Sample Top Cryo Swipes Bottom Air Sample To Blowers Concept of Operations Bottom Side Entry and Swipes

To Blowers Top SNM Lids Removed Top Area Swipes Concept of Operations Modified Top Tent Lid Installed Survey Results: All Clear Removable “sunroof” Replaced with Tent Sleeve (swap “sunroof” out on Highbay floor)

To Blowers Inner Sleeve Installed Concept of Operations Modified Top Tent Sleeve Unrolled and Taped to ECC Survey Results: All Clear Lifting Bridle Installed

Concept of Operations Primary is lifted and the underside is swiped Floor liner is installed under Primary

Survey Results: All Clear Tent Removal can Commence Concept of Operations Tent Lid can be Removed

Primary Bagged, and Removed to Separation Tent OR MBA Cage Concept of Operations Tent is designed to work using existing Primary bagout method if desired

Center Section Returned to Pre-Shot Configuration Concept of Operations

New Pallet is Prepped in Separation Enclosure ECC + Primary Assembly are hoisted to Separation Enclosure through ceiling OR Moved to Pallet, then hand trucked to MBA Cage Concept of Operations

Ceiling Port is closed (Velcro/Zipper) ECC Sleeve is placed over Primary Concept of Operations *New cross members not shown

(ECC Sleeve) ECC is removed from UCC Once UCC is Deemed Clean, Ceiling port is opened for UCC removal Concept of Operations UCC/ECC Swipes *New cross members not shown

Separation Enclosure Utility Door Crane Access