St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans.

Slides:



Advertisements
Similar presentations
CEO, PBL Group Ltd., Bangkok
Advertisements

Slide 1 Insert your own content. Slide 2 Insert your own content.
ALGEBRA Number Walls
Getting there in comfort
0 - 0.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
Addition Facts
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2011 Conaway Conference Structures Update.
ODOT Structure Project Manager Seminar Concrete Decks
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Who Wants To Be A Millionaire? Decimal Edition Question 1.
Module Floor Systems.
Cofferdam.
SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE
Objective The student will be able to:
Algebra I 1.2 Order of Operations.
Use the order of operations to evaluate expressions. Objective The student will be able to: Designed by Skip Tyler, Varina High School and redesigned by.
Introduction to composite construction of buildings
Chapter-2 Parts of Steel Bridge.
CENTRE FOR BUILDING TECHNOLOGY Institute for Timber Engineering and Wood Technology, TU Graz / Austria Case study no. 10 Leonardo da Vinci project no.
IIT Madras, SERC Madras, Anna Univ., INSDAG
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
St. Croix River Crossing S. P
TED 316 – Structural Design
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Constructions of Large-panel Buildings in Vilnius
Surface Area of Irregular Shapes Volume of Irregular Shapes
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Sequence Quickies 1  ORB Education. Visit for the other resources in this pack.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Concrete Fooring & Roofing System
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
Concrete Construction Part 1
Intracellular Compartments and Transport
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Bridge Engineering (6) Superstructure – Concrete Bridges
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
Spliced Precast Girders
ENG-1010 Lecture 16 Bridge Design.
Chapter 34 Bridge Construction.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
EUROCODES - Background and Applications – Moscow 9-10 December 2010 Prof. Ing. Giuseppe Mancini - DISTR - Politecnico di Torino 1 EUROCODE 2 – Design of.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
There are many types of bridges including:
Spliced Girders A Producer’s Perspective
STRESS RIBBON BRIDGES PREPARED BY:SHAIKH MOHAMMADSOYAB A
Group N Chris Jones Ella Feekins Nikoline Hong
Other Construction Projects
Bridge Engineering (9-1) Suspension Bridges I. *Components: Anchorage (blocks or tunnel type), towers, main cables, hangers, stiffened (box) girder and.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Shear Stresses in Concrete Beams
Presented By: Marvin Burns, PE Janssen & Spaans Engineering, Inc.
Condition of Prestressing of the Ft. Lauderdale- Hollywood Airport Deconstructed Segmental Bridges Luis M. Vargas Beiswenger Hoch and Associates.
Construction Methodology for Suramadu Main Bridge.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Introduction to composite construction of buildings
High Bridge Re-Deck Project
Advisor: Professor M. Kevin Parfitt
Chapter 5: Substructure
A New Precast, Pre-stressed Bridge Deck System
By: Clarence Fragoso and Jonathan Lopez
Presentation transcript:

St Croix River Crossing S.P Contractor Information Meeting 15 May 2013 River Spans

General Arrangement

Main Span  3360' single structural unit  Expansion joints at Pier 7 and East Abutment  600' extradose spans  Twin wall pier legs to address time dependent and thermal effects

Towers

Tower Sections

Main Span - Reinforcing Reinforcing Grade  Generally grade 60, except:  Verticals on crossbeam – Gr 75  Deck level stay anchor blocks Gr 75 Corrosion Protection  Generally epoxy coated except:  Pier 8 legs for 10' below knuckle – SS  Deck top slab reinforcing – SS

Main Span - Concrete Concrete – Substructure and Towers  Generally days, except:  Towers 24' below to 3' above crossbeam days Concrete - Deck  Generally days, except:  First 8 precast deck segments days

Tower – Leg Reinforcing

Tower Reinfrocing

Tower Reinforcing

Tower - Crossbeam

Tower – Crossbeam PT

Tower - Crossbeam PT

Tower Crossbeam Node PT

Tower Crossbeam Node Reinforcing

Pylon Crossbeam Node

CIP Pier Table

Upper Tower

Tower - Anchor Box

Tower Anchor Box

Stay Cables  Parallel Strand Stay Cable System  All stays 76 – 0.62" stays  Working at higher load than cable stays (0.52 fpu)  Live end in tower  Testing requirements per 6 th Edition of PTI Recommendations for Stay Cable Design Testing and Installation  Internal dampers required at lower end  Damping required – 2.5% log dec – confirm by testing

Pier 13 General Arrangement

Typical Deck Section

Deck Section at Stay Anchorage

Typical Deck Section

Deck Section at Transition

Tower 8 Deck Segmentation

Tower 9, 10 and 11 Deck Segmentation

Tower 12 Deck Segmentation

Span 14 Deck Segmentation

Segments Weights 7.5' segments ≤ 140 tons 8.5' segments ≤ 130 tons Typical 10' segments ≤ 165 tons 10 ' stay anchor segments ≤ 180 tons

Tower 8, 9, 10, and 11 Tendon Layout

Tendon Layout Span 14

Bottom Tendons – Span 14

Continuity Tendons Span 8

Typical Continuity Tendons

Continuity Tendons Spans 13 and 14

Typical Future PT

Typical Deck Segments

Typical Bulkhead

Typical Segment Reinforcing

Blisters

Transverse Deck PT

Belvederes

Belvederes - PT

Belvederes

Belvederes – Reinforcing

St Croix River Crossing S.P Contractor Information Meeting 15 May 2013 River Span - Construction

Pier Table Construction

Global Construction Scheme

Deck Erection Pier 8

Segment Lifter  Max segment weight 180 tons  Lifting frame weight 145 tons  Stressing platform 17 tons  Transporter 33 tons, 7 axles at 4'-3"

Segment Lifter

Deck Erection Pier 8

Deck Erection Pier 13 to East Abutment

Sequence Pier 13 to East Abutment

Deck Erection Pier 13 to East Abutment

Sequence Pier 13 to East Abutment

Longitudinal Infill

Stay Strut Erection