1 Human Factors Course Session 4 Eric Davey Crew Systems Solutions 2007 March 28.

Slides:



Advertisements
Similar presentations
Medical devices: Application of risk management to medical devices
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Developing and writing learning objectives
Making the System Operational
1 Project Design Module 5 Session 5. 2 Summary This session provides introduction to project preparation, project documents, and checklist for questions.
Managing Assessment Change February/March 2008 Leading Learning.
1 Developing Assignments using the assessment grid.
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Internet Librarian 2007 Project management workshop 28 th October 2007 Mary Auckland Project management workshop 28 th October.
Effectively applying ISO9001:2000 clauses 6 and 7.
Test plans. Test Plans A test plan states: What the items to be tested are At what level they will be tested What sequence they are to be tested in How.
Checking & Corrective Action
1 Human Factors Course Session 3 Eric Davey Crew Systems Solutions 2007 March 28.
Staff Training Type your subject here. Welcome and Introduction Welcome the staff members to the session. State the subject of the session. Describe the.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
EPSON STAMPING ISO REV 1 2/10/2000.
PPA Advisory Board Meeting, May 12, 2006 Assessment Summary.
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
1 Assuring the Quality of your COSF Data. 2 What factors work to improve the quality of your data? What factors work to lessen the quality of your data?
University of Jyväskylä – Department of Mathematical Information Technology Computer Science Teacher Education ICNEE 2004 Topic Case Driven Approach for.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
1 HIV Drug Resistance Training Module 9: A Systems Approach to Laboratory Quality.
What is Business Analysis Planning & Monitoring?
ISO STANDARDS TRAINING & CONSULTING
New Advanced Higher Subject Implementation Events
New Advanced Higher Subject Implementation Events Design and Manufacture: Advanced Higher Course Assessment.
Introduction to ISO New and modified requirements.
Test plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Business Analysis and Essential Competencies
Planning and Delivery of HND Programmes Janet Strain.
Managing staff development Chris Schiller Thursday 31 July 2014.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Human Factors (HF) - Assessment Method Agenda What is Human Factors? Why do we need HF-Assessment Method ? What is the HF-Assessment Method ? Why.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
New Advanced Higher Subject Implementation Events Computing Science Advanced Higher Course Assessment.
Setting up a Course and using the Course Tutor Guide Workshop A Kim Tree.
The Major Steps of a Public Health Evaluation 1. Engage Stakeholders 2. Describe the program 3. Focus on the evaluation design 4. Gather credible evidence.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Data Provenance Community Meeting November 6, 2014.
STAGE #5: CLOSING 5 Process Stages of Project Management.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Training Aids Ice breaker. Previously nominated student to introduce an ice breaker Introduction What type of training aids are there. Last lesson. Learning.
Phases of Curriculum Design: Evaluation Stufflebeam’s CIPP Model Dr. Katherine Korkidis April 19, 2009.
Intervention for Chronic and Emergency Exposure Situations Developing a National Capability for Response Emergency Response Plans Lecture IAEA Post Graduate.
Quality Assessment of MFA’s evaluations Rita Tesselaar Policy and operations Evaluation Department Netherlands Ministry of Foreign Affairs.
Condor Technology Solutions, Inc. Grace Performance Chemicals HRIS Intranet Project.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Continual Service Improvement Methods & Techniques.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Advanced Higher Computing Science The Project. Introduction Worth 60% of the total marks for the course Must include: An appropriate interface using input.
UNDERSTANDING ISO 9001:2008.
CESSDA SaW Training on Trust, Identifying Demand & Networking
Training Course on Integrated Management System for Regulatory Body
IEEE Std 1074: Standard for Software Lifecycle
Instructional Design Gibran Carter.
Monitoring and Evaluation using the
Rob Cotterill & Helen Jones DNV Consulting, UK
Teacher Roles and Responsibilities
QA Reviews Lecture # 6.
Designing & Conducting Formative Evaluation
Presentation transcript:

1 Human Factors Course Session 4 Eric Davey Crew Systems Solutions 2007 March 28

2 Session 4 - Applying HF - Group Exercise Topics CLS Project selection Assessment - Identifying potential HP issues Planning - Walkthrough of HF application stages  Determination of workscope  Selection of methods  Documentation Exercise lessons learned Course summary Introduction

3 CLS Project Selection Name and description

4 HF Application Model Planning Analysis Design Testing Use Performance Monitoring Change Management Verification Validation Equipment Workspace Interface Analysis Contexts Tasks Errors Review Experience Need Functions People Equipment Design Application RequirementsImplementCommission In-service Staff & Training Knowledge Skills Goals Assessment Application (HF Plan) Procedures Content Representation

5 Planning Design Application Planning Analysis Design Testing Use Need Goals Determination of the need and emphasis for human factors activities Assessment Selection of human factors activities, resources, and deliverables Application (HF Plan)

6 Analysis Design Application Planning Analysis Design Testing Use Analysis Contexts Tasks Errors Review Experience Functions People Equipment Requirements Describe distribution of function elements to people and equipment Describe operating situations Describe tasks performed by users Assess potential for task error & impacts Identify lessons learned from previous experience

7 Design Design Application Planning Analysis Design Testing Use Equipment Workspace Interface Procedures Content Representation Implement Staff & Training Knowledge Skills Input to definition of all design elements Contexts Task content Information needs Guidance based on proven practice

8 Testing Design Application Planning Analysis Design Testing Use Verification Validation CommissionConfirm design and implementation conforms to human factors requirements Task information Conventions and standards A performance test to confirm integrated system meets operational intent and human needs: Measures Standards for acceptance

9 Use Design Application Planning Analysis Design Testing Use Performance Monitoring Change Management In-service Identification and control of system and environmental changes Ongoing assessment of human performance with system to detect changes from expected performance

10 Lessons Learned From the planning exercise, what have you learned? Determining workscope Selection of activities Staging of activities Selection of methods Integration of HF with existing system design activities Exercise Feedback

11 Summary - Key Points Human Factors Knowledge of human capabilities Criteria and methods Human Performance Awareness of limits and variability Provide support for performance excellence HF Application Emphasis Analysis and design decision support Integration with other project activities Conclusion

12 Comments Feedback Eric Davey Crew Systems Solutions Phone Websitewww.crew-ss.com