AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2.

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Primary Radar in ATC ITU Radar Seminar Poul Erik Jørgensen DAS ATS HMI Manager 24. September 2005.
PLANNING FOR A GLOBAL ATM SYSTEM
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Overview of Continental En-route Navigation Specifications
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
1 FLL Construction Playbook RWY 10R / 28L April 17, May 6, 2013 Phase 1 Only ~ RWY 9R Closes.
Erwin Lassooij PBN Programme Manager 30 January 2014
Javier Perez Diestro Air Navigation International Director
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
Procedure Design Considerations
Continuous Descent Operations ( CDO )
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues 30 Nautical Mile (NM) Lateral / Longitudinal Distance-based.
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Thailand Implementation of CNS/ATM Infrastructure Thailand.
Performance-based Navigation Honeywell SmartPathTM
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
Federal Aviation Administration The Benefits and Challenges of Implementing Performance Based Navigation (PBN) Instrument Flight Procedures By: Presented.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
“Established on RNP” Jeff Williams – IATA
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Good Design Practices BEIJING, CHINA; 30 JUN-11 JUL 2014.
Airline PBN Operations & Desired Entry Competency Elizabeth Bjerke University of North Dakota.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
PBN “SETTING UP A NEW BUT SUCCESSFUL, PBN PROGRAMME”
PBN Airspace Concept Workshop ReviewReview INTERNET: pin:
Performance Based Navigation Aviation Industry Forum 18 November 2009.
Aramco. We will first look at the evolution of navigation approvals. Next we will look at navigation specifications in detail. Finally we will look implementation.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
Optimal Approach procedures
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
From RNP Divergence to Performance Based Navigation Convergence
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Transition to RNP 4/10 (MNPS to PBN)
Workshop on preparations for ANConf/12 − ASBU methodology
FAA NAVAID Rationalization / Resiliency Overview
Users’ Perspective of PBN Achieving Improvements
Erwin Lassooij PBN Programme Manager 30 January 2014
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Airline PBN Operations & Desired Entry Competency
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Practice Class Exercise SE Asia Enroute
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Airspace Concept Workshop
ASEAN PBN Routes Objectives:
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Performance Based Navigation –Civil Aviation Authority Actions
“Established on RNP” Jeff Williams – IATA
PBN ICAO HQ Activities Overview
Presentation transcript:

AIRSPACE CONCEPT WORKSHOP CASE STUDY 1

AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2

PBN Implementation Processes 3

4 Airspace Concept Activity Overview

Phuket / Krabi Info 5

Phuket/KrabiPhuket/Krabi 6

7 Facilities developed independently as traffic developed Area Controls: Phuket and Krabi both open 24/7 Terminal Approach Radar operational: 24/7 Radar: PHK ASR 70nm / ACC SSR 250nm / PHK piped to Krabi Phuket: Rwys 09L/R and 27L/R Krabi: Rwys 09/27 Landing and departing to the west 85% of the time Phuket Rwys separated by only 400 meters Phuket/Krabi airports approximately 10nm apart Traffic mix 88% Phuket / 12% Krabi

Phuket / Krabi Info 8 More than 95% of operators RNAV/RNP qualified Holds in ACC activated with little notice from APP No published holds currently exist in APP airspace APP vectors most aircraft Military airspace has not been able to be used Airspace use is inefficient due to independent operations ANSP tasked to combine facilities and improve efficiency ANSP tasked to take advantage of RNAV capabilities

Phuket ILS or LOC RWY 27 9

Fleet Capability 10 Total RNAV/ RNP RNP 10 RNP 4 RNAV1/RN AV2 RNP.3 RF Leg RNP <.3 DME/DME/ IRU SBAS/ WAAS GLS/G BAS Flights at Phuket330, , , , ,837240,838260, Percentag e 1%84% 90%82% 74%78%1% Total RNAV/ RNP RNP 10 RNP 4 RNAV1/RN AV2 RNP.3 RF Leg RNP <.3 DME/DME/ IRU SBAS/ WAAS GLS/G BAS Flights at Krabi34, ,035 33,17327,39829,43224,65327, Percentage 1%84% 91%82%83%74%82%1%

Phuket/KrabiPhuket/Krabi 11

Phuket/KrabiPhuket/Krabi 12 MyThai No CZ

Phuket/KrabiPhuket/Krabi 13

Phuket/KrabiPhuket/Krabi 14

Phuket/KrabiPhuket/Krabi 15

Phuket/KrabiPhuket/Krabi 16

Rules of Thumb 17 CDO descent rough starting points: 3 miles per thousand feet plus 1 mile per 10knots or 4 miles per thousand feet CDO descent rough starting points: 3 miles per thousand feet plus 1 mile per 10knots or 4 miles per thousand feet CCO climb rough starting points: Very Slow climber - 5 miles per thousand feet Medium climber – 3 to 4 miles per thousand feet Faster climber – 2 miles per thousand feet Rocket ship - 1 mile per thousand feet CCO climb rough starting points: Very Slow climber - 5 miles per thousand feet Medium climber – 3 to 4 miles per thousand feet Faster climber – 2 miles per thousand feet Rocket ship - 1 mile per thousand feet RNAV Final between 4-5 nm Curved RNAV? A-RNP - RF prior to FAF? RNAV Final between 4-5 nm Curved RNAV? A-RNP - RF prior to FAF?

Phuket/KrabiPhuket/Krabi 18

Phuket/KrabiPhuket/Krabi 19

Phuket/KrabiPhuket/Krabi ✈ Team Lead ✈ Team Recorder ✈ Team Name ✈ Team Lead ✈ Team Recorder ✈ Team Name 20

Phuket/KrabiPhuket/Krabi ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access Agree on Operational Requirements

FiniFini 22