1 SMOS IOCP Key-Point 0 09 Dec. 2009. ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.

Slides:



Advertisements
Similar presentations
1 CAN WE TURN A PHONE IN TO A SATELLITE? Android Open 2011San Francisco,10th Oct
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
FANS (Future Air Navigation System) Flight Crew Procedures
ESA Iris Programme workplan of activities
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Determining the Significant Aspects
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
IOCP KP-0 / 09 December 2009 HB-1 In-Orbit Commissioning Phase : IOCP Key-Point 0 09 December 2009 ( L + 37 Days ) ESAC – Villafranca.
European GNSS Evolution Programme
Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Confined Space (Permit-required) Entry Supervisor.
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Mars Climate Orbiter Team Magna Corp: Tim Toba Mohamed Sahil Nyema Johnson Abner Yemaneab University of Minnesota.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Titre du document + date Arial 8  à modifier dans le masque (Affichage/Masque/Masque des diapositives) CNES – 9 Décembre 2013 Karine MERCIER SVOM ECLAIRs.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
Level 1 - LRO Requirements ESMD-RLEP-0010
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
Proposed Approach  Research available commercial satellite communications services  Explore viable battery technologies  Investigate GPS receiver functionality.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/09 Preliminary Satellite in flight status.
Colorado SpringsJanuary 23~26, Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
ESA UNCLASSIFIED – For Official Use Recap of SOIS Evaluation by the Primes F. Torelli (ESA) CCSDS Spring Meeting, 23/03/2015.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
IOCP High Level Plan, 8 September In-Orbit Commissioning Phase: High Level Planning.
Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/ Operations Report of LEOP S. Burgaud / CNES.
CSA St Hubert, Quebec24-25 May Spring 2004 CCSDS Management Council CNES report Geneviève Campan (CNES)
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
eMerger Integration Planning
Key Management V 0.4 Discussion of document revision SeaSec Intermediary Meeting, Heppenheim, October 07 Daniel Fischer Uni Lux SECAN-Lab / ESA OPS-GDA.
The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.
STAR ONE C1 - Insurance Presentation
Galileo Mission Consolidation & Maritime Needs December 18 th GISS, Brussels Status of Galileo Mission High Level Documents.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
Robotics and Autonomy Test Facility - Hardware Verification needs Elie Allouis HRAF Workshop – 28/02/2012.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
SMOS Commissioning KP-0, ESAC, 9 December /17 Payload Functionality during SODAP: preliminary review SMOS Project Team, ESTEC/ESAC/ESRIN EADS-CASA.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
Ground Control AERSP 401A. Ground System’s Basic Elements Mission Elements –Control the space segment or handle mission data, and includes: Ground Stations.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Multi-disciplinary Approach for Industrial Phases in Space Projects Evolution of classic SE into MBSE Harald EisenmannAstrium Satellites Joachim Fuchs.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
ESA Iris Programme workplan of activities
GLAST Large Area Telescope:
Failure of Process / Failure of Mission
TEMPO’s Commercially Hosted Payload Concept
Launch and On-orbit Checkout
Presentation transcript:

1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES

2 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In the frame of the “In orbit Commissioning activities”, different milestones are planned in January 2010 : - Thales Platform Commissioning Key Point on 14 of January - Payload Key Point 1 on 20 of January - In orbit System Assessment Review on 20 and 21 of January The Platform Commissioning Keypoint : - Presentation made by Thales in Cannes of the detailed Platform in orbit commissioning results - This milestone will conclude formally the Thales development activities and will start the Thales In-flight MCO ( Operationnal Support Phase ) - As for previous SL development review’s, a summary of the Payload status would be appreciated : general behavior, PLM Health check results, Thermal, Bus IF …etc

3 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In orbit System Assessment Review on 20 and 21 of January : - Presentations made by CNES and ESA in Toulouse will address the detailed In Orbit System Commissioning activities, with main objectives : MISSION ANALYSIS : Launch, Maneuvers ( sma, delta i ), Maneuver budget SATELLITE : Spacecraft (Bus and Payload) Assessment of functional behavior & performances ( Power AOCS Mechanical Thermal Command & control …), S band transceiver Link budget. GROUND SEGMENT : Satellite Operational ground segment status ( SOCC, PLPC, XBAS ), Network and interfaces, data transfers OPERATIONS : Ops feedback from LEOP & assessment phase, Satellite/Payload Data Base, ground surveillances, Operational process in routine DOCUMENTATION STATUS : Sequence plans, Operational CNES/ESA interface documents for routine (OIA, ICD…), On orbit management plan - This milestone will formally start the SL routine phase with the Hand Over from CNES development team to the CNES Operational team Payload Key Point 1 on 20 of January : - Proposal to converge on a joint agenda to merge the both KP and In orbit System Review objectives : a duration of 2 days meeting in Toulouse on 20 and 21 of January seems fully compatible to achieve objectives of the both meetings.

4 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities Miscellaneous : Operation during week 52/53 CNES will be closed from December 24th until January 3rd, as a consequence, a very restricted number of people will be allowed to enter in CNES facilities : only for emergency situation or safety reason. One single Proteus operation team on duty ( Mission/Space segment/Ground segment) Strategy proposed for Payload operation :  Last (.. for 2009) PLM TC group uploaded on December 23 at the latest  In case of red alarm on PLM, operational procedure applied with call of the Mission Operation Manager hot line  Only validated procedure to ensure safety of the PLM will be performed : up to switch off if necessary, no additional investigation nor PLM Switch on realized during the period Upload of SL TC (guidance) group in automatic mode on during this period