1 Failure of Process / Failure of Mission
Mars Climate Orbiter Gerry Tucker [ ] EMSE 6361 – Fall 2015 Term Paper – Final

2 Case Study Overview

3 Case Study Overview* Mars Climate Orbiter (MCO) launched Dec. 11, 1998 with an anticipated arrival at Mars of Sept. 1999 On Sept. 23, 1999 all contact was lost as MCO was 4 minutes into the Mars Orbital Insertion (MOI) burn On Sept. 29, 1999 the root cause of the failure was discovered *Background information derived from MCO Mishap Investigation Board Phase 1 Report

4 Prime contractor for vehicle development
Case Study Primaries Lead NASA center for Mars Surveyor Program Project office created by JPL with the responsibility to define the mission, develop the spacecraft / payload elements, and integrate/test/launch the flight system.* Prime contractor for vehicle development *Background information derived from MCO Mishap Investigation Board Phase 1 Report

5 Root Cause* AMD Event Occurs Vehicle Trajectory Modeling
Small Forces Processing Data AMD File Units = Newtons Units = lbf-s *Background information derived from MCO Mishap Investigation Board Phase 1 Report

6 Root Cause* - Consequence
Result was a small error build up Vehicle entered the atmosphere at a periapsis of 57km Lowest projected by model using the fault data was 110km Lowest survivable periapsis: 80km Figure 4 form MCO Mishap Investigation Board Phase 1 Report * *Background information derived from MCO Mishap Investigation Board Phase 1 Report

7 Root Cause Analysis

8 Root Cause Analysis Allowed AMD data capability to arrive 4 months after launch OPS NAV team did not work development and did not receive adequate training on vehicle Validation testing by JPL was not performed or completed at appropriate level Developer QA process did not discover critical interface issue

9 Solution Analysis

10 Validation Process Inadequate
Goal Improved process that catches conversion error Decomposition Review Not properly reviewed by SMEs to catch missing logic Execution Not executed by SMEs to catch missing logic Solutions Peer Review Process Ensure that SMEs are required to invite before schedule items related to development can complete Validation Team Training Ensure that SMEs provide a high level overview of the capability being tested and provide pointers to all applicable interface specifications

11 Developer QA Process Inadequate
Goal Improved process that catches conversion error Decomposition Review Process Developers did not discover error in fundamental interface requirement code QA Training QA was not properly trained to on the details of the system to determine if developers were coding again specification Solutions Peer Review Process Update to include template checklist of items to review for artifact type (i.e. interface code against applicable spec) QA Team Training Ensure QA receives overview of code being reviewed along with applicable references

12 Prog. Mgmt. Process Inadequate
Goal Improved process that manages critical risks Decomposition Process R&O process inadequate given that management was not aware of the magnitude and impact of the risk of allowing small forces / AMD delay Solutions R&O Process Enforce risk assessment and mitigation plan generation by SMEs prior to accepting risk

13 OPS Training Inadequate
Goal Improve process for training OPS team Decomposition Not Enough Transition Training OPS NAV team was not aware of particulars of the vehicle and could not properly assess impacts to issues that were noticed Solutions Day in the Life (DITL) Training Provide DITL type training that is a hands on simulation of operations with nominal and non-nominal situations thrown into the mix by SMEs

14 Questions

15 References

16 References Mars Climate Orbiter Mishap Investigation Report – Phase 1 Report: Nov. 10, 1999; Stephenson, Mulville, Bauer, etc. [ftp://ftp.hq.nasa.gov/pub/pao/reports/1999/MCO_report.pdf] Slide 4,5,8 – JPL Logo - Slide 4,5,8,12,14,15 – Lockheed Martin Logo - Slide 4,11,14,15 – Mars Surveyor Logo Slide 5, 8 – MCO Picture browse.jpg