Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Standards Review Subcommittee Update February 19, 2013.
Business Practices Subcommittee Update August 17, 2010.
Standards Review Subcommittee Update February 1, 2011.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Remedial Action Schemes Reliability Subcommittee
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
Remedial Action Scheme Reliability Subcommittee, RASRS WECC Operating Committee June 18-19, Gene Henneberg.
Standards Development and Approval Process Steve Rueckert Director of Standards Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake.
The Western Interconnection Synchrophasor Program (WISP ) Update Vickie VanZandt Joint Synchronized Information Subcommittee Salt Lake City August 10,
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Remedial Action Schemes Application and Implementation Requirements & Performance Assessment Measures Vahid Madani Pacific Gas and Electric Co. Chair -
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC October 2013 Salt Lake City, UT.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC Response to BAL-002-WECC-1 Remand Order December 10, 2010 WECC Board of Directors Meeting Steve Rueckert Director of Standards.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC System Performance Criteria 1st Team Meeting Background
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
ACE Diversity Interchange (ADI)
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Brian Theaker RCWG Chair
NERC Fill in the Blank Standards Efforts Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
Addition Facts
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Addition 1’s to 20.
Week 1.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee RASRS Report to Operating Committee October 8-9, 2014 Salt Lake City, Utah.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC and NERC Protection Criteria and Standards
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 13th, 2015 Salt Lake City, UT.
1 Progress Report Policies and Procedures Tom Green PCC Salt Lake City July 15, 2014.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Bert Peters Chair, Path Operator Task Force
RASRS Report to Operating Committee March 21, 2017
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
WECC Regional Standards Update
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee RASRS Report to Operating Committee March 25-26, 2014 Salt Lake City, Utah

RASRS Scheme Reviews (10 Entities, 24 schemes) NV Energy COI RAS Separation Scheme, Robinson Summit, addition approved Gonder OV RAS removal approved Gonder UV RAS removal approved Humboldt UV RAS removal approved   EPE El Paso EPE-1 UVLS RAS removal approved Port GE Port Westward Runback removal approved

RASRS Scheme Reviews BC Hydro South Interior East RAS Consolidation of previously reviewed schemes for Kootenay Canal, Seven Mile, Waneta Expansion, Arrow Lakes Hydro, Brilliant Expansion, most of 5L91 and 5L96 RAS. No change to hardware, studies or arming, just reporting. Consolidation accepted by RASRS. South Interior East RAS modification for Waneta Expansion approved with one action item Modicon 984 PLC Replacements at Ingledow and Nicola were approved North Vancouver Island RAS accepted as LAPS Mica GS RAS upgrades and modifications approved with one action item Natal previous action item resolution approved  

RASRS Scheme Reviews SRP Desert Basin RAS removal approved Randolph LAPS modifications accepted as a LAPS   PacifiCorp Northwestern Idaho Power Path 18 Transmission Limit Control (TRLC) RAS accepted as a LAPS

RASRS Scheme Reviews SCE Centralized RAS (CRAS), SCE provided an update to RASRS, approvals not required at this time. Modified West of Devers (WOD) RAS approved as WAPS Mojave Desert RAS approved as WAPS with one action item Devers RAS approved as WAPS with one action item Blythe RAS update arming level, still a LAPS  

RASRS Scheme Reviews BPA RAS Test Intervals Proposed test interval changes for WAPS to target annual with a maximum of two years and for LAPS a target of 5 years with a maximum of 72 months (6 years). Accepted by RASRS.   The following BPA scheme modifications were reviewed in closed session: West Side RAS controller and changes at Pearl and Keeler substations approved John Day LLL (line loss logic) modifications were approved Grizzley LLL modifications were approved Captain Jack LLL modifications were approved

PRC-(012-014)-WECC-CRT-2 The revised criterion requires owners to track and report periodic assessments of schemes. This is a follow up to the September 8, 2011 disturbance. Effective date January 1, 2014

WECC RAS Review Procedure Revision to the RAS criterion also necessitates some minor revisions to the WECC Procedure to Submit a RAS for Assessment Criterion Attachment B data Periodic assessment review process explanation OC review/approval now!

WECC RASRS Charter Significant Charter changes include: Removed a specific percentage of members present as a quorum requirement Removed the Chair’s authorization to “approve” new RASRS members in favor of “accepting” nominations of new members from WECC member’s OC representatives OC review/approval now!

WECC RASRS Member Skills

WECC RAS Database Good cooperation from WECC members for the annual database update in December AESO “joined the party” with 39 schemes A few other (mostly) thermal emulation schemes added More removals than new schemes reviewed in 2013 Presently 267 schemes in the database

RAS & Protection System Oversight Task Force (RPSOTF) Task Force provides oversight of PCC/TSS MSRATF activities Co-chairs: Don Watkins, Dave Angell Membership drawn from: RAS Reliability Subcommittee Relay Work Group Technical Studies Subcommittee WECC and RC Staff Technical Support, Standards, and others

Modeling SPS & Relays Adhoc Task Force The MSRATF is organized under TSS (and PCC), Joe Seabrook, chair: RAS modeling group Relay modeling group Contingency definition group

Modeling SPS & Relays Adhoc Task Force “Big picture” objective is to develop and use contingency, relay, and RAS models as part of the Base Case Coordination System (BCCS), including models for unbalanced faults, accessed via a common data format from any of the four major software vendors’ programs.

Modeling SPS & Relays Adhoc Task Force Specifications for Power Flow and Stability models already approved by MVWG: RAS models Phase Relays: Overcurrent, Directional, Distance Ground and OOS Relays: Future Node-Breaker topology to be adopted

Peak Reliability and RAS Peak Reliability (the RC) has been developing RAS models to include in their EMS models. RASRS is discussing database and collection coordination to minimize the number of separate data requests to WECC members and align both the RASRS data and the RC data to be collected.

NERC SPS/RAS Standards NERC has a new drafting team to write a new SPS definition and related standards. Among the ten members are four from WECC: Gene Henneberg (NV Energy, Chair) Amos Ang (SCE) Davis Erwin (PG&E) Hari Singh (Excel)

NERC SPS/RAS Standards There will be lots of chances for industry comment, but . . . Please provide any informal feedback to the drafting team, especially on the SPS/RAS definition, sooner rather than later.

NERC SPS/RAS Definition Example SPS Exclusion: Schemes to protect against SSR, which might include: Local SSR filters Torsional Stress Relay Critical contingency element monitoring and mitigation

April 7-9, 2014, Salt Lake City, UT (two weeks away!) Next RASRS Meeting April 7-9, 2014, Salt Lake City, UT (two weeks away!) Review schemes from members Other RASRS business

Questions? Remedial Action Scheme Reliability Subcommittee March 2014