WECC Member Advisory Committee WECC Standards Committee Request for Guidance Governor Droop October 16, 2013.

Slides:



Advertisements
Similar presentations
Citizens Task Force Study of Financial, Legal & Legislative Issues Associated with Improving Roadway Service Delivery Board of Supervisors Transportation.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Frequency Responsive Reserve Process Update
WECC Reliability Based Control Field Trial
WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
WECC Standards Committee Joint Session
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013.
WECC Standards Committee Joint Session Webinar Meeting September 5, 2013.
BAL-002-WECC-1 Contingency Reserves
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Document Categorization Issues Michelle Mizumori RPIC Meeting July 29, 2009.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
WECC-098 Gov Droop DT May 29, BAL Requirements R1. Each Frequency Response Sharing Group (FRSG) or Balancing Authority that is not a member.
Brian Theaker RCWG Chair
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
NERC Fill in the Blank Standards Efforts Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
WECC-0100 Drafting Team Orientation TPL-001-WECC-RBP-2.1 System Performance Drafting Team Meeting.
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
IWG Update April 2014 ISAS Danielle Johnson. WIAB Test – Still looking for other volunteers for the WIAB Fall 2014 – Volunteer as of Today WAPA Rocky.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
COM Operating Personnel Communications Protocols
W. Shannon Black Manager, Standards Processes New Chair Orientation.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Path Operator Task Force Report Joint Guidance Committee December 1, 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
Standards Review Subcommittee Update November 2007 – January 2008 February 5, 2008.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
Moving To the Year 2000:Implementing 4010 Implementation Resolution Process Rich Emrich EDI Manager J.M. Schneider.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ELL Program Advisory Group November 10, TWO PHASES of WORK ELL Program Advisory Group PHASE ONE 1/1/2016As Specified in HB Criteria Determine.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
WECC – NERC Standards Update
Steve Rueckert – Director of Standards
COM Operating Personnel Communications Protocols
WECC Regional Standards Update
WECC-0118 Removal of Interchange Authority
Kenneth Silver Los Angeles Department of Water & Power
MAC Board Effectiveness Survey
4.2 CLIMATE SERVICES, ACTION AND RESILIENCE
Compliance Open Webinar
Updates about Work Track 5 Geographic Names at the Top-Level
NERC Reliability Standards Development Plan
W. Shannon Black Manager, Standards Processes
Compliance Open Webinar
Steve Rueckert – Director of Standards
MAC Board Effectiveness Survey
Steve Rueckert Director of Standards WSC Meeting Overview
Kenneth Silver Los Angeles Department of Water & Power
NERC Reliability Standards Development Plan
WECC – NERC Standards Update
Document Categorization Policy
Standards Development Process
CCWG Accountability Recommendations
Information Sharing Policy Update March 25-26, 2014
Presentation transcript:

WECC Member Advisory Committee WECC Standards Committee Request for Guidance Governor Droop October 16, 2013

2 o WSC Charter  Determining whether a Standard Authorization Request (SAR): 1)is within WECC’s authority to develop (scope); 2)is appropriate for development by WECC; and 3)provide a drafting team with a description of the document to be drafted and an explanation as to why the document is needed. WSC - Request for Guidance SAR Disposition

3 o WECC-0098 SAR Filed  In response to RCWG/RPIC recommendation  Review the existing Governor Droop “RBP”  Recommend whether it should become a “Standard”  Specifically – address “Droop”  DT convened  Drafted “Version 1” WECC-0098 Governor Droop Background

4 o WECC-0098 Version 1  Looked at BAL-003 and ERCOT’s “Droop” Standard  Opted for a different remedy  Use Frequency Response Obligation as opposed to a specified mechanical setting  WSC ruled the Version 1 approach “Out of Scope” WECC-0098 Governor Droop Version 1 – Out of Scope

5 Is the WECC-0098 Governor Droop SAR overly discriminatory? If yes, should it be retired in favor of a less discriminatory approach?WECC-0098 Governor Droop o Doesn’t address units without governors o Doesn’t address “non-traditional” generators o Doesn’t include “other resources” that may be able to respond in support of frequency WECC-0098 Governor Droop Version 1 Valued Approach

6 If the SAR is not retired, should the SAR be developed at NERC or at WECC? o Is the “Droop” remedy better addressed at NERC or WECC? o NERC is engaged in collection of “frequency-related” data in the East / Invites WECC o NERC’s target  Create a Guideline  See if it works  Consider drafting a Standard WECC-0098 Governor Droop Version 1 Valued Approach

7 If developed at WECC, should the WECC-0098 SAR move forward as drafted or should it be retired in favor of pursuing the Frequency Response Obligation (FRO) approach suggested in Version 1?Version 1 o FRO or a “Droop”? WECC-0098 Governor Droop Version 1 Valued Approach

Questions?