© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.

Slides:



Advertisements
Similar presentations
Standards Development: An Overview
Advertisements

Introduction to Web Bill of Lading Q Proprietary and Confidential Copyright © 2005 INTTRA Inc. 2 Agenda Industry Challenges INTTRA Solution Value.
Major Activities in JPNIC Since APNIC17 Izumi Okutani Japan Network Information Center NIR 18, Fiji 31 August – 3 September, 2004.
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Ec-12-0xyz EC Rules November 2012 James Gilb (Tensorcom) IEEE 802 Rules Update November 2012 meeting.
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES September 2012 Officers Training Workshop Len Morrissey Tom OToole 1.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES September.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Proposed Motion to Establish a Study Group on Mobile Broadband Wireless Access IEEE Presentation Submission Template (Rev. 8.21) Document Number:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
802.16m Preamble RG Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-08/637 Date Submitted: Source:
1 An Update on XML.org Registry and Repository Una Kearns Documentum, Inc.
1 Standards Development: An Overview Discovery to Delivery Topic Committee Meeting October 30, 2007 Karen A. Wetzel NISO Standards Program Manager
© 2007 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
©2011 Quest Software, Inc. All rights reserved.. Andrei Polevoi, Tatiana Golubovich Program Management Group ActiveRoles Add-on Manager Overview.
MMS Work Transfer Ihab Guirguis
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
TC Admin Open Mic Session Copyright © OASIS 2012 TC Administration Update Report to Members February 8 th / 9 th 2012.
1 REVIEWER ORIENTATION TO ENHANCED PEER REVIEW April
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
11 ITU-R Liaison Group Report - Session #84 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
ITU-R Liaison Group Report - Session #80 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
May 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE /342r0 Submission 1 Slide Publicity Committee.
Doc.: IEEE /0022r0 Submission July 2005 Steve Shellhammer, Qualcomm Inc.Slide 1 Discussion on Contention-based Protocol (CBP) Study Group Notice:
Location Services Overview Larry A. Young Chairman, OMA Location Working Group SDO Emergency Services Coordination Workshop 5 th and 6 th October, 2006.
Table of contents 1 Manual of Operational Procedures (MOP) 2
Addition 1’s to 20.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 1 All you always wanted to know about.
USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
Week 1.
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
© 2008 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
© 2011 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
What I Know About OMA Or At least What I Think I’m Allowed To Say, as I Think This is All Public Knowledge Dean Willis November 20, 2002.
Getting Involved in the Research Data Alliance Stefanie Kethers
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
© 2007 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Session # NRR Committee Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0007 Date Submitted:
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC D.
Global Grid Forum GridForge
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
RTA TIG Agenda Date: Authors: March 2019
IEEE IMT-Advanced Review Process
IEEE C /48 Project IEEE Working Group on Mobile Broadband Wireless Access Title New Business Item/
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
RTA TIG Agenda Date: Authors: March 2019
Presentation transcript:

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #1 [OMA-Template-SlideDeck ] OMA-TP OMA Working Methods OMA Working Methods USE OF THIS DOCUMENT BY NON-OMA MEMBERS IS SUBJECT TO ALL OF THE TERMS AND CONDITIONS OF THE USE AGREEMENT (located at AND IF YOU HAVE NOT AGREED TO THE TERMS OF THE USE AGREEMENT, YOU DO NOT HAVE THE RIGHT TO USE, COPY OR DISTRIBUTE THIS DOCUMENT. THIS DOCUMENT IS PROVIDED ON AN "AS IS" "AS AVAILABLE" AND "WITH ALL FAULTS" BASIS. Submitted To:Technical Plenary Date:21 st August 2003 Availability: Public OMA Confidential Contact:Philippe Lucas Source:Technical Plenary vice-chair X

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #2 [OMA-Template-SlideDeck ] Contents of the Presentation Group Types Liaison Decision making process Types of documents and document numbering Process Work activities : process flow

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #3 [OMA-Template-SlideDeck ] OMA structure

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #4 [OMA-Template-SlideDeck ] Group Types

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #5 [OMA-Template-SlideDeck ] Groups TP Committees (TP Committees) Work of TP committees is not covered by Work Items May produce normative and informative documents Does not produce specifications Documents to be approved by TP Birds of a Feather (BoF) BoF serves as a forum to review issues not covered by WIs BoF created by TP before they may meet Request for BoF to address purpose and issue to review BoFs are not chartered BoFs do not produce normative documents May produce an informative report and/or draft WI for TP consideration BoF duration is limited in time (typically 6 months)

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #6 [OMA-Template-SlideDeck ] Groups Working Groups (WG) Working Groups Report to the TP and are chartered to produce work based on WIs Working groups produce normative and informative docs WG permanent documents are approved by TP WGs may create Sub-Working Groups Sub-Working Groups (SWG) SWG are chartered by its parent WG SWG charter is within scope of parent WG All decisions are agreed by the parent WG SWG can not be formally subdivided (ie. no SubSubWG) SWGs may support liaison activities

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #7 [OMA-Template-SlideDeck ] Liaison Liaison is used to communicate with external organisations Until a relationship is established – an interim liaison process exists Once Established Liaisons May Be Exchanged Scope Limited to Agreement Info Outside of Scope Require TP/Board Approval Liaison Contacts Help Manage Flow Work Groups Empowered to Engage Work Groups Inform TP of Requirements for Liaison Once agreed – working groups can directly work with the external organisation

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #8 [OMA-Template-SlideDeck ] Technical Decision Making Consensus driven approach Groups Should Seek Consensus on Decisions Votes Possible When Consensus is Not Achievable – should remain the exception Consensus in Physical or Real-Time Meetings Can Determine Status in meeting Should Not Use Sparse Attendance to Drive Issues Through Consensus in Non-Real-Time Meetings Should Permit Delegates Have at Least 7 Days to Respond Chair Should Consider Outside Factors in Setting Timeline Holidays, Scheduled Meetings, System Outages Voting – If needed Voting may be secret or open as decided by the group 67% threshold to approve

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #9 [OMA-Template-SlideDeck ] Document Numbering Permanent Documents Specifications and Reports Internal Documents Documents Submitted to a Particular Meeting

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #10 [OMA-Template-SlideDeck ] Permanent Document Numbering FieldUse, Format and RemarksExamples This field MAY be provided to indicate the affiliate organisation that produced the spec. The future usage of affiliate names requires further consideration, and it is desirable that any new work initiated in OMA does not have the affiliate name in the document name. SYNCML, LIF, WV, WAP etc. This field SHALL be provided. The field provides an abbreviated name of the document function in the working group. It shall be a unique identification of the functional area, distinguishing between different working groups that may be working on the same functional area. DLOTA-REQ, DLOTA-ARCH, WML, etc. This field SHALL be provided. This field shall refer to a version of the document. V1_0, V2_1. This field SHALL be provided and is the date when the document was posted to the document archive This field SHALL be provided and indicates the state of the specification, these states being:  ‘A’ for Approved ‘C’ for Candidate  ‘D’ for Draft ‘E’ for Expired  ‘O’ for Obsolete ‘R’ for Restricted Draft (OMA Internal) Existing other states from OMA affiliates not accommodated or mappable into this list should be preserved and not reused if there is any risk of confusion. D, A etc. “OMA-“ { “-”} “-” “-” “-” OMA-WV_Arch-V1_ A

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #11 [OMA-Template-SlideDeck ] Permanent Document Version FieldUseRemarks Major Version Indicator This field shall identify the major version of the document, as determined by the working group. This field SHALL be provided. Major versions are likely to contain major feature additions; may contain incompatibilities with previous document or specification revisions; and though unlikely, could change, drop, or replace standard or existing interfaces. Initial releases are “1_0”. Minor Version Indicator Minor version of the document. This field shall be provided. It is incremented every time a minor change is made to the document by the working group. Minor versions are likely to contain minor feature additions, be compatible with published the preceding Major_Minor specification revision including existing interfaces, although it may provide evolving interfaces. The initial minor release for any major release is “0”, i.e. 1_0 Service IndicatorService indicator for the document. Incremented every time a change is made to the published document by the working group. This field is optional, i.e. the equivalent of “_0” for initial Major_Minor releases but SHALL be provided whenever a service release of the document is made. The first service indicator release SHALL be “_1” for any Major_Minor release. Service indicators are intended to be compatible with the Major_Minor release they relate to but add bug fixes. No new functions will be added through the release of Service Indicators. = “V” “_” { “_” }

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #12 [OMA-Template-SlideDeck ] Work Activities : Process Flow WORK ITEM CREATION Step1 ASSIGNMENT BY TP TO WG Step2 REQUIREMENTS Step3 DETAILED TECHNICAL WORK Step4 VALIDATION & IOP Step5 Work with other Fora Eg. 3GPP (MMS) Approved Specs

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #13 [OMA-Template-SlideDeck ] Work Activities : Process Flow (1 of 3) Work Item Development Stage 1: WI Creation Stage 2: WI Refinement (Following Failure to Approve) Stage 3: Submission of a WI to the TP Stage 4: Technical Plenary Approval of WIs Charters Reflecting the WI Scope Stage 4.1: Assignment of WI in the Scope of WG Stage 4.2: Assignment of WI not in the Scope of WG Stage 4.3: Assignment to a New WG Stage 5: Review of Revised / New Charters for Assigned WIs Stage 6: Approval of Revised / New Charters for Assigned WIs

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #14 [OMA-Template-SlideDeck ] Work Activities : Process Flow (2 of 3) High Level Requirements Document (RD) Stage 7: Producing the Requirements Document Stage 8: Requirements Document Review Stage 9: R&A of the RD by the Technical Plenary Detailed Specification Creation Stage 10: Creation of the Architecture Document Stage 10.1: Architecture Document Review Stage 11: Creation of the Enabler Package Stage 11.1: Consistency Review Stage 12: Candidate Submission for Review and Approval Stage 13: Approval of the Candidate Specification

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #15 [OMA-Template-SlideDeck ] Work Activities : Process Flow (3 of 3) Candidate Validation and Approval Stage 14: Public Review Stage 15: Validation Task Transfer to IOP Stage 16: Enabler Test Plan and Enabler Test Specification Document Creation Stage 17: Interoperability Testing, Problem Report Generation and Handling Stage 18: Submission of Final Candidate Spec(s) for Approval Stage 19: Approving the Candidate as an Approved Spec Stage 20: Post Technical Plenary Approval Process

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #16 [OMA-Template-SlideDeck ] Process reviews Required reviews Requirements Document Architecture Document Enabler Packages : collection of specifications suite defining an enabler Handling Reviews Preliminary Reviews Scheduling of Formal Reviews Availability of Material Handling of Comments Update of Material and Review Response Follow-up Reviews Submission to Technical Plenary

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #17 [OMA-Template-SlideDeck ] Access to OMA specifications Specifications can be retrieve from the public web site Traditionally this has been approved and candidate specification New policy of openness will expose draft specification, … Technical reflector for comments from anyone outside OMA

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #18 [OMA-Template-SlideDeck ] Summary TP is fully responsible for the technical work in OMA Decisions are consensus driven A well defined process exists to create technical specifications Non blocking process WI driven & market driven requirements

© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document. OMA-TP Slide #19 [OMA-Template-SlideDeck ] Thank you!