Fawzy Al-Alami G200903430 Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.

Slides:



Advertisements
Similar presentations
An Introduction to Teamwork
Advertisements

Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Group Dynamics Stages of Group Development. Group Dynamics O This week we will be looking at the importance of working in groups O Positive and negative.
A Matter of Motivating People to Prepare and Work as a TEAM
Team & Teamwork. More Than Meets The Eyes! 3 Design Group  Engineering projects require diverse skills  This creates a need for group (team) work 
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
I Speak 2010 © 2010 The McGraw-Hill Companies, Inc. All rights reserved. Appendix Working and Presenting as a Group.
Teamwork C.Eng 491 Fall 2009.
Project Work and Administration
New Basic Skills. The Original Basic Skills Reading Writing Arithmetic.
TOGETHER EVERYONE ACHIEVES MORE
QUALITY ASSURANCE PROJECT Improvement Coach The purpose of this session is to introduce participants to the role of the improvement coach and prepare for.
STRATEGIC ALLIANCES ISSUES F Stability and risk F Failure rate of 30 to 60 percent F Even profitable alliances can be torn by conflict.
Guiding principles for the Federal acquisition system
Virtual teams These are teams that work together and solve problems through computer-based interactions. What are some benefits? Drawbacks? They save time,
Monica Hutchins LDR-601 Dr. M. Parsons “Teams are organizational groups composed of members who are interdependent, who share common goals, and who.
3rd Phase: 3rd Phase: PROJECT ORGANISATION Plan  Implementation  Recruit staff and organize project team members  Assign responsibility for Work packages.
Initiating and Planning Systems Development projects
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Develop your Leadership skills
Managing Fast – Tracked Projects: A Review of ECI Report Dr
Project Monitoring and Control by Hateem Ghafoor, PMP.
Human Resource Management Gaining a Competitive Advantage
Chapter 10 THE NATURE OF WORK GROUPS AND TEAMS. CHAPTER 10 The Nature of Work Groups and Teams Copyright © 2002 Prentice-Hall What is a Group? A set of.
Basic Concepts in Management. Management Types All manager’s job are not the same. Managers are responsible for different departments, work at different.
Basic Concepts in Management. Manager Someone who coordinates and oversee the work of other people so that organizational goal can be achieved.
Joint Venture in construction company in West Bank.
TEAMWORK WORKSHOP ICOM5047 Design Project in Computer Engineering J. Fernando Vega-Riveros, Ph.D. Associate Professor – ECE Dpt.
 Many corporate executives have said, “People are our most important asset”  People determine the success and failure of organizations and projects.
SCANS Skills Competencies &Personal Qualities. What Is SCANS Skills???  Secretary's Commission on Achieving Necessary Skills (SCANS) - appointed by the.
Teams Dale W. Bomberger D.ED. ACSW Community Services Group
Skills 4 Success.
Managing the Information Systems Project © Abdou Illia MIS Spring /26/2015.
Teambuilding For Supervisors. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize the value of team efforts Identify.
Prepared by: Omar almegbel. ahmad ayasrah Ammar alirr. Ahmad aljarrah. Amjad aljarrah..
Project supervision and Proces report 1. Supervision The supervisor Project supervision is a dialogue about the project and the methods used between the.
Online curriculum centre Faculty member training, April 2009.
Understanding Groups & Teams Ch 15. Understanding Groups Group Two or more interacting and interdependent individuals who come together to achieve particular.
Structuring Cooperative Learning: Examples from Small group learning in higher education (SGLHE) Karl A. Smith University of Minnesota Cooperative.
SELF MANAGED TEAMS. A self-managed team is a group of employees that's responsible and accountable for all or most aspects of producing a product or delivering.
Four parts to the Tuckman team development model Forming Storming Norming Performing.
Chapter 6 Working and Writing in Teams Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1A FAST EXCELLENCE THROUGH FACILITATION Gary Rush The FAST Process MGR Consulting
Developing teamwork in emergencies Session
© BLR ® —Business & Legal Resources 1408 Teambuilding for All Employees.
Design-Build Process from All Sides
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
OBJECTIVE 1.01: UNDERSTAND INDIVIDUAL CHARACTERISTICS/ TRAITS, INTERESTS/PREFERENCES, ABILITY LEVELS, SKILL ACQUISITION, TALENTS/APTITUDES, LEARNING STYLES.
Generic competencesDescription of the Competence Learning Competence The student  possesses the capability to evaluate and develop one’s own competences.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. Slide 1 Working in Groups PART FOUR.
Groups Dynamics and Teams Development. Groups, Teams and Organizational Effectiveness Group –Two or more people who interact with each other to accomplish.
Teamwork Skills Building Successful Teams Working in a Team Training & Leadership.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Cross Cultural Project Management Nora Colliton, MBA, PMP PMI-NH Chapter September 19, 2007.
Introduction to Management LECTURE 24: Introduction to Management MGT
Teamwork is work done to achieve a common goal. Six aspects of teamwork are: Training and team planning Team goals and assigning roles Agreements Shared.
JIGSAW METHOD OF TEACHING. The purpose of Jigsaw is to develop teamwork and cooperative learning skills within all students. In addition it helps.
Technology Teams Chapter 2 - Part 1. The Value of Teamwork A team is a group of people who work together toward a common goal. A team is a group of people.
Prepared By :ANJALI. What is a Team? Two or more persons work together to achieve same goal or complete a task. Teams make decisions, solve problems,
Team Building and Conflict Resolution
CHAPTER10 Project Human Resource Management
CONDUCT OF BOARD EVALUATION
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
What does Success mean to you?
CHAPTER9 Project Human Resource Management
SCANS Skills Competencies &Personal Qualities
Cooperative Learning Concepts
Effective Project Management: Traditional, Agile, Extreme
The Leadership Excellence Series
Presentation transcript:

Fawzy Al-Alami G Term Paper

 Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build Team Relationship.  Selecting Design-Build Team Members.  Team Agreement.  Defining The Responsibility.  Communication.  Trust.

 Design-Build Contract: is a method where the owner has only one contract to complete the project.  Responsibility of the Contractor: 1. Design the project 2. Construct the project

 Other designation to design-build system: Design-construct. Single source.  Why owners are using design-build contract?  Mainly to reduce the construction period (Fast Track Project)

 Teamwork: is work performed by a group of people.  Cooperated team members helps:  improving the quality of the project.  Continuity of the project.  Enhances the creativity of individuals.  Reduce project duration.  Reduce the cost of the project.

 Design-build Required full cooperation between all team members at all phases of the project.  Alpert Chan studied the factors can enhance the successes of design-build system:  Project team commitment.  Contractor’s competencies.  Risk and liability assessment.  Client’s competencies.  End users’ need.  Constraints imposed by end users.

1. Selecting design-build team members. 2. Team agreement. 3. Defining the responsibility. 4. Communication. 5. Trust.

 Selection of individual should be based on his ability to perform as team not only on individual qualification.  Two Criteria has to be consider before selecting the team member: 1. Diversity of the team member. 2. Technical experience of the member.

 Advantages of diversity: 1. Creativity: different idea and different point view will be more effective if you have people from different countries. 2. Eliminating of group thinking:”it is a good idea because everyone believes it is a good idea. 3. Alternative solutions: due different construction method in each region

 Disadvantages of diversity: 1. Language: different accent may lead to serious misunderstanding during team communication. 2. Trust: people trust more the person from same country.

 Technical experience of the member 1. The team member should be experienced in design-build system. 2. The whole team has to have some knowledge of overall work and expertise other than his area of expertise

 How to select design-build team members?  Monte Carlo Simulation Approach to Support Alliance Team Selection :found a method for the owner to select the contractor team.

 Team Agreement: the vehicle for structuring the relationship between the parties in design-build project.  Objective of team agreement:  To establish work relationship between constructor, designer, and subcontractors and that will permit the design-build team to satisfy the owner’s requirements.  To establish ground rules between all parties involved in the project.

 Topics to be included in the team agreement meeting  Role of each member in the project.  Team communication method and communication and interaction with contractor’s members in addition to sub- contractor and owners representative  Partnering.

 Defining the responsibility is to distribute the task equally among the team members and according to their experience to achieve maximum productivity.  Defining the rules distributing the unforeseen work among team work.  Defining the rules that allow cooperation between all parties in design-build project.

 Defining the responsibility will reduce the conflict between team members.  Responsibility matrix is a schedule used to assign the responsibility task to each group member.  It has to be prepared by the project manager of the project.

 Communication: is delivering and receiving information or knowledge in convenient way.  Communication play a major rule for cooperation between design-build team.  Proper communication helps solving the complexity of design-build system.

 Feedback: to evaluate the receiver understanding.  Communication is two way process: failing to listen means failing to communicate.  Provide training course to the design-build team to enhance their communication skills.

A. Past Experience And History. B. Competence and Ability. C. Similarity and Differences. D. Character Trait. E. Relative Power and Authority.