MaxCell First order Installation Reports MTNL Mumbai Amit Dubey MaxCell Market Manager - India
Chembur, MTNL Mumbai Date: 13th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay Chembur, MTNL Mumbai After MaxCell installation Before Amit Dubey MaxCell Market Manager - India
Existing Cable or sub duct OD mm MaxCell Installations Date: 13th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay Installation Results: Section Conduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell Installations Cable Installation Final Fill Ratio Style Time, min Tension, kgs OD, mm 1 100 empty 223 Straight 3 x 5621-3 25 4 Man Hand Pull 4 x 12 & 2 x 14mm 45 4 Man HP 9.7% 2 Empty 2 x 14 & 2 x 18mm 50 10.4 % 3 2 x 12mm 2.9 % Remarks:- This was the first order installation of MaxCell in Chembur, MTNL Mumbai through contractors. There were four 110-100mm empty conduit and have to installed 27 nos. of cables (combination of 12 & 18mm). There were an hand hole in between manhole. it is 89m from one and 134m from other manhole. Contractor first installed rope in all four conduit. Successfully installed 3 nos. of EM 5621-3 three cell MaxCell in three of 110-100mm conduit while fourth conduit left out for future use. Deployed 6 cables (2 x 14mm & 4 x 12mm) in two EM5621-3 MaxCell in first 110-100mm conduit. 4 cables (2x 18mm & 2 x 14mm) in second 110-100mm conduit. And 2 x 12mm cables in third 110-100 conduit.. Fourth for future use. Amit Dubey MaxCell Market Manager - India
Successful installing cables Date: 13th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Chembur, Mumbai Classification: Overlay MaxCell praparation Cable Pulling Successful installing cables Amit Dubey MaxCell Market Manager - India
Kandiwali, MTNL Mumbai Date: 14th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL Kandiwali Exchange, Mumbai Classification: Overlay Kandiwali, MTNL Mumbai After MaxCell installation Before Amit Dubey MaxCell Market Manager - India
Existing Cable or sub duct OD mm MaxCell Installations Date: 14th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Kandiwali Telephone Exchange, Mumbai Classification: Overlay Installation Results: Section Conduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell Installations Cable Installation Final Fill Ratio Style Time, min Tension, kgs OD, mm 1 100 empty 130 Straight 3 x 5621-3 35 1 Man Hand Pull 1 x 18 15 2 Man HP 3.2 % Remarks:- In this starch only one 110-100mm conduit was available while apart from two manhole there were 12 & 24 nos. of 110-100mm conduit available. 50m of this stretch was along with bridge while remaining was under the foot path. We installed 3 nos. of EM 5621-3 MaxCell and further deploy one 18mm cable in one of the cell successfully. Now there are provision of 8 nos of cable to installed in future. Amit Dubey MaxCell Market Manager - India
Passing through handhole Date: 14th May 2010 End User: MTNL Mumbai Installer: Milliken Venue: MTNL, Kandiwali Telephone Exchange, Mumbai Classification: Overlay MaxCell getting enter Passing through handhole Successful Installed Amit Dubey MaxCell Market Manager - India