Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slides:



Advertisements
Similar presentations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Advertisements

Module N° 7 – Introduction to SMS
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
TAG Farnborough Airport. TAG Farnborough Airport Today.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Continuous Descent Operations (CDO) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.
1 Airspace Change Process & Airspace Trials in the context of Modernising UK Airspace Darren Rhodes Civil Aviation Authority.
Study Continuous Climb Operations
SESAR Single European Sky Air traffic management Research
FASVIG Introductory Meeting
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
International Civil Aviation Organization Measurement of environmental benefits Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Information requested following SMS implementation presentation.
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE Agenda Item : Financial Matters Agenda Item : Financial Matters 3:
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Dublin Airport Stakeholders Forum 26 th November 2008 Irish Aviation Authority Dermot Mc Mahon.
NextGen Next Generation Air Transportation System
Farnborough Airspace Change Proposal Briefing to FACC 26 th November 2014 TAG Farnborough Airport.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Farnborough Airspace Change Proposal Briefing to FACC 6 th March 2014 TAG Farnborough Airport.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
PlaneWrong AGM Thursday 13th October
Collaborative Decision Making Module 5 “The Collaborative Environment”
The Role of Air Traffic Control in A CDM ENVIRONMENT
Performance Based Transition
Workshop on preparations for ANConf/12 − ASBU methodology
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE
Airspace Change Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Innovation for Regional Integration
Brandon O’Reilly (CEO TAG) to Eagle Radio on 27th March 14:
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Air Navigation Bureau
Safety Risk Management (SRM) Process Overview
Workshop on preparations for ANConf/12 − ASBU methodology
4D Trajectory Management
Balanced Approach to Noise Mitigation
Collaborative Decision Making “Developing A Collaborative Framework”
Long term vision for Air Traffic Systems CARATS
Balanced Approach to Noise Mitigation
Airspace Change Proposal
Dave Behrens Director, Infrastructure Strategy IATA
Presentation transcript:

Farnborough Airspace Change Proposal FACC Briefing 4 October 2012

Slide 2 What is an airspace change proposal? It is a formal Civil Aviation Authority (CAA) process that will be undertaken by TAG Farnborough Airport in order to introduce a new airspace design as well as arrival and departure procedure changes The process is outlined in CAA publications CAP724 and CAP725 The proposal will be prepared by TAG Farnborough Airport; the sponsor of the proposal NATS has been contracted to provide technical and operational support The Airspace Change Proposal (ACP) process requires comprehensive and quality consultation to ensure that the requirements and aspirations of all stakeholders are considered when developing the design options 1

Slide 3 Why is TAG Farnborough carrying out an ACP? In line with the TAG Farnborough Airports 2009 Master Plan, it is undertaking an airspace change to provide the airport with a more predictable and efficient airspace environment This ACP therefore represents TAG Farnborough continuing to deliver the commitments made in its Master Plan TAG will work with the CAA to explore the possibility of applying for an Airspace Change Proposal. If granted, this would result in TAG having a greater degree of control over a larger area of airspace around the airport, and enable the introduction of procedures which could result in further noise mitigation. 2

Slide 4 Cont… Why is TAG Farnborough carrying out an ACP? To create a new operating environment which offers all airspace users predictability and consistency of operation Creating a known air traffic control (ATC) environment will assist the airport in catering for the increasing number of air traffic movements (ATMs) Aircraft will fly more predictable and efficient inbound and outbound flight paths There are three key benefits: 1. Improvements in overall airspace efficiency 2. Environmental benefits 3. Safety benefits 3

Slide 5 What are the benefits? 1. Improved airspace efficiency Advanced navigation systems will enable high-precision, optimal approach and departure procedures. Aircraft will remain at higher altitudes for longer and spend less time in the air 2. Environmental benefits Reduced track miles will be flown with more predictable and efficient flight paths Improvements in efficiency would result in: reductions in fuel usage, emissions (including CO 2 ) and noise around the airport 3. Safety benefits By changing to a new airspace environment, which includes elements of controlled airspace, the airport will be able to create a known and more predictable environment 4

Slide 6 What is the process? The process to be followed is outlined in CAA publication CAP725 and contains a number of phases: Phase 1Framework briefing Phase 2Proposal development Phase 3Preparing for consultation Phase 4Consultation and formal proposal submission Phase 5Regulatory decision Phase 6Implementation Phase 7Operational review 5

Slide 7 Activities Project start June2012 Initial design options and parametersAug2012 Pre-consultation with key aviation stakeholdersOct 2012 Detailed design options and concept of operationsAug2013 Formal consultation processAug2013 Final submission to DAPOct 2013 DAP decisionFeb2014 6

Thank you