Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

Slides:



Advertisements
Similar presentations
3/25/2017 Social Jessica Winters
Advertisements

Who Wants to be a Millionaire? Adapted from TCEA 2002
Bunch Passing 1 BUNCH PASSING IN THE DOUBLE WING OFFENSE Edmond E. (Ted) Seay III Copyright © 2004 Edmond E. Seay III.
Why facebook? Your brand is no longer what you tell people it is, its what people tell each other it is. Your brand is what people say about you when.
Alaska Stand Alone Gas Pipeline
Slide 1 Insert your own content. Slide 2 Insert your own content.
Problems That Could Cause a Big Market Decline Daryl Montgomery June 29, 2011 Copyright 2011, All Rights Reserved The contents of this presentation are.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
East Riding of Yorkshire Council County Hall Beverley East Riding of Yorkshire HU17 9BA Telephone ATTENDANCE ATTENDANCE.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
Workplace, Course Centre, Municipality and Regional Tourism: An Integrated Mobility Management in Magglingen/Evilard, Switzerland ECOMM San Sebastian,
Donostia – San Sebastián, 15 th May Donostia – San Sebastián 15 th May City of Graz World Heritage since 1999 European Cultural Capital City.
Toulouse, May 2011, Slide 1 20 x 20. Toulouse, May 2011, Slide 2 20 x 20.
Edgar Thielmann Applications of the European GNSS INFO DAY GALILEO FP7 Bruxelles 27 January 2009 EUROPEAN COMMISSION.
1 Galileo and EGNOS for the road Transport November 2008 European Commission – TREN G4.
April 2, $1 Billion - $1.2 Billion The Pawlenty-Molnau Transportation Financing Package will improve Minnesotas transportation system by greatly.
Dennis L. Edwards Tunnel
0 - 0.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire? Year 3 What does it weigh?
SITE INVESTIGATION.
TRADITION, POWER QUALITY , INNOVATION
PERFORMANCE One important issue in networking is the performance of the networkhow good is it? We discuss quality of service, an overall measurement.
Moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
1 Fiscal Rules Uri Gabai National Economic Council Prime Minister Office 5 May 2009.
© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented.
Case studies from Slovenia The Geothermal Heat Pumps market in Central & Eastern Europe Evgen Torhač Project manager Bratislava,
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
MONGOL GAZAR LLC OLON OVOOT GOLD PROJECT
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
© S Haughton more than 3?
SR Tunnel Technical Study Presentation for City of Pasadena City Council January 26, 2009.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
WA Dept of Commerce DLT Session The Future, Social Media & the Public Sector Social Media Trends - What the 3 May 2012 Perth Western.
Name ____________________ Date ___________ Period ____.
Test B, 100 Subtraction Facts
Week 1.
The tunnelling for the “Metro do Porto” By Alex Wilson & Frances Coker Singhateh.
Atlantic Water temperature and climate in the Barents Sea in Vladimir Boitsov, Alexey Karsakov, Alexander Trofimov Polar Research Institute of.
Partial Products. Category 1 1 x 3-digit problems.
Federal Department of the Environment, Transport, Energy and Communications Federal Office of Transport FINANCING AND MANAGEMENT OF THE GOTTHARD BASE TUNNEL.
Market Data ASHRAE May, Keith Stippich. Global Energy Consumption Global Energy Consumption (+10.9% overall increase)
Changing How Our Children Grow Up in America. Managing the Whitewater of Change June 24 – 26, 2008 National Conference Presenter: Vonda Melton.
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
Yellow River Diversion Project Use of Tunnel Boring Machines to Divert the Yellow River, China John Train & Philippa Reed.
ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
General meeting LAGUNA LAGUNA – Fréjus site
RAILMED A Project for MEDA 2020 NRLA New Railway Link through the Alpes PROJECTS 2013.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
RISK ASSESSMENT FCC draft, 2. September 2015.
International workshop on micropiles – Venice, 30 may – 2 June 2002
Risk Management – Correlation and Dependencies for Planning, Design and Construction Philip Sander Alfred Moergeli John Reilly.
Risk Management – Correlation and Dependencies for Planning, Design and Construction Philip Sander Alfred Moergeli John Reilly.
Presentation transcript:

Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Overall context The new transalpine rail routes (NEAT - Neue Eisenbahn-Alpentransversale) Bundesamt für Verkehr BAV Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Overall context The new Gotthard rail link (longer, flatter and faster) (2016/17) (2019) Bundesamt für Verkehr BAV Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geological context Gotthard base tunnel – Geological profile AlpTransit Gotthard AG Die Zeit 42/2010 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Preliminary study 1992 950 m Partially squeezing rock -> comprising sheared and folded Serizit phyllites (cataclasite) 2910 m Extreme squeezing rock -> intensively crumbled, kakiritic mica gneisses, mica slates and mica phyllites 150 - 250 m Liquid rock with high water pressure -> sugar-grained Dolomite 400 m Talus material from rockfall -> unconsoli-dated rock AlpTransit Gotthard AG Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Sedrun Part-Section AlpTransit Gotthard AG Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Sedrun Part-Section TZM North Geotechnically trickiest section 1 km long, with 1000 m overburden AlpTransit Gotthard AG Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Methode Vorgehen Ergebnisse Zeitplan 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Sedrun Part-Section Geol. exploration Five exploratory drillings One penetrated the entire TZM => Intensively crumbled, kakiritic micas AlpTransit Gotthard AG Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Sedrun Part-Section Information about the danger patterns Triaxial tests Extreme squeezing behaviour capacity to close the cavity Loosening phenomena and caving behaviour at the face and on the fringe Securing the cavity Tagungsband Swiss Tunnel Congress 2008 Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Sedrun Part-Section Cavity support to resist large permissible deformations of up to 70 cm radially Deformable steel arches (double ring) every 1 m, 66 cm or 33 cm Anchoring system with radial anchors of up to 12 m in length Tunnel 4/2004, Swiss Tunnel Congress 2008, IUT’ 02 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Sedrun Part-Section Choice driving method Conventional driving with tunnel excavators (shovels, picks and ripper teeth) On account of squeezing rock AlpTransit Gotthard AG IUT’02 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Situation 2010 950 m Partially squeezing rock -> comprising sheared and folded Serizit phyllites (cataclasite) Difficult Intschi zone crossed without problem with an average daily advance of 6 m by TBM (6/2004) 1000 m Extreme squeezing rock -> intensively crumbled, kakiritic mica gneisses, mica slates and mica phyllites Squeezing Rock Conditions Successfully Overcome: breakthrough took place nine months ahead of schedule (TZM) (10/2007) 150 - 250 m Liquid rock with high water pressure -> sugar-grained Dolomite Piora syncline definitively and successfully mastered with an average daily advance of 10 to 12 m by TBM. The rock was stable. No deformations and no water. (2/2009) 400 m Talus material from rockfall -> unconsoli-dated rock Firsts breakthrough in the GBT with special driving method (11/2002) AlpTransit Gotthard AG Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Geotechnical problems Unexpected 2003 Fault zone: Squeezing rock in Faido multifunction station (1/2003) Investigating fault zone Redisposition of the FMS 24 months delay additional costs of 500 million CHF AlpTransit Gotthard AG Tunnel 4/2004 Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Geotechnical problems Major railroad constructions: Gotthard base tunnel (GBT) Costs The Costs of the AlpTransit Gotthard Project (2010) Total costs: CHF 13.157 billion (Gotthard route with the Gotthard and Ceneri Base Tunnels) AlpTransit Gotthard AG Kurzfassung NEAT-Standbericht 2010 / I Content Overall context Geological context Geotechnical problems Costs 25. März 2017

Thank you! Questions?