Reporting on I&C status and recommendations to IAEA

Slides:



Advertisements
Similar presentations
Ernst Oberortner Vienna University of Technology.
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
NRC Consensus Standards Program
1 NRC Status and Plans for License Renewal – A Role for Consensus Standards Allen Hiser, Jr. Robert Gramm Stacie Sakai Division of License Renewal Office.
ITER CODAC Plant Control Design Handbook October 2008
Standardization in China
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
1 Unit 1 Kinematics Chapter 1 Day
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Licensing of Nuclear Power Plants in Pakistan
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
INTERNATIONAL ATOMIC ENERGY AGENCY Technical Committee Meeting of Technical Working Group on Nuclear Power Plant Control and Instrumentation May.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND.
Tom MAZOUR IAEA, Division of Nuclear Power
IAEA - Department of Nuclear Safety & Security
TWG-NPPIC, May 2009, Vienna: UK status1 Current status of NPP I&C in the United Kingdom T P Smyth AMEC, Knutsford, Cheshire, UK 22 nd Meeting of the Technical.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
Presented by Dr. Kristóf Horváth Deputy Director General Hungarian Atomic Energy Authority Based on the Guideline developed by the WG on Computer Protection.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Licensing procedures for interim storage of spent fuel in Germany
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
IAEA I&C Activities Presented by Björn Wahlström, Chairman TWG-NPP CI.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
1 Post FISA-2003 Workshop Cost Effective Modernisation of Systems Important to Safety CEMSIS (Luxembourg, 13 Nov. 2003) Regulatory Aspects F. Seidel (Federal.
STRENGTHENING NATIONAL INFRASTRUCTURES FOR THE CONTROL OF RADIATION SOURCES RER/9/096 REGIONAL PLANNING MEETING ARMENIA ASHOT MNATSAKANYAN Head of Radiation.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
I & C.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
THAILAND Training and Tutoring Feedback
Experts for experts Using the T&T international Projects to strengthen the professional development of NRA and TSO technical staff T&T second coordination.
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Regulatory Control Training Workshop
Armenia Training and Tutoring Feedback
RCF Plenary Session 21 September 2018
Training and Tutoring Approaches in the Field of Radiation Safety
Nuclear Safety Standards Committee 35th Meeting 24 – 28 June 2013
Presentation transcript:

Reporting on I&C status and recommendations to IAEA Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation and Control (TWG-NPPIC) 20-22 May 2009 IAEA Vienna Reporting on I&C status and recommendations to IAEA Arndt Lindner Institute for Safety Technology (ISTec) Garching

TWG-NPPIC Nuclear energy in Germany I&C status in Germany Content Nuclear energy in Germany I&C status in Germany Recommendations to IAEA Conclusions

TWG-NPPIC There are spent fuel interim storages at all sites Nuclear Energy in Germany There are spent fuel interim storages at all sites

TWG-NPPIC Nuclear energy provides 22,1% of power generation Nuclear Energy in Germany NPP in operation Output (MWel) Start of comercial operation Biblis A 1225 1975 Biblis B 1300 1977 Brokdorf 1440 1986 Brunsbüttel 806 Emsland 1400 1988 Grafenrheinfeld 1345 1982 Grohnde 1430 1985 Gundremmingen B 1344 1984 Gundremmingen C Isar 1 912 1979 Isar 2 1475 Krümmel 1402 Neckarwestheim I 840 1976 Neckarwestheim II 1989 Philippsburg 1 926 1980 Philippsburg 2 1458 Unterweser 1410 Nuclear energy provides 22,1% of power generation

TWG-NPPIC Nuclear Energy in Germany “Consensus on Nuclear Power” (from June 11, 2001) is still valid (phase-out of nuclear power) Several NPPs plan and implement I&C up-grades Limitation and reactor control systems (GKN, KKU, KKI) Modernized main control room (KKI) Independent emergency protection system (KKP) Turbine control and protection in several NPPs Applications for digital protection systems have been submitted (GKN, KWB)

TWG-NPPIC Nuclear Energy in Germany Update of the nuclear regulatory framework Revision D now available (http://regelwerk.grs.de/) 12 modules I&C is subject-matter of Module 5 The modules are available only in German language

TWG-NPPIC Nuclear Energy in Germany

TWG-NPPIC I&C status in Germany Although lots of information about measures to overcome CCF discussion on that issue starts again IEC 62340 Nuclear power plants - Instrumentation and control systems important to safety - Requirements for coping with common cause failure (CCF) is accepted Application to German NPPs is discussed controversially Situation is complicated due to application of competing standards

TWG-NPPIC Example: Safety classification IAEA: Functions of Category A I&C status in Germany Example: Safety classification IAEA: IEC 61226: IEC 61508: ISO 13849: Functions of Category A Functions of Category B Functions of Category C Non-categorized functions Safety Integrity Level (SIL) 0 Safety Integrity Level (SIL) 1 Safety Integrity Level (SIL) 2 Safety Integrity Level (SIL) 3 Safety Integrity Level (SIL) 4 Performance Level (PL) a Performance Level (PL) b Performance Level (PL) c Performance Level (PL) d Performance Level (PL) e

TWG-NPPIC Industry makes proposals I&C status in Germany Industry makes proposals Regulators have additional requirements Licensed is what neither industry nor regulators want

TWG-NPPIC I&C status in Germany Ri Redundancy i; i = 1, 2, 3, 4 A Sub-system A B Sub-system B IA Set of input signals of sub system A IB Set of input signals of sub system B PLCAi PLC(s) Ai; i = 1, 2, 3, 4 PLCBi PLC(s) Bi; i = 1, 2, 3, 4 i Internal run time of redundancy i

TWG-NPPIC I&C status in Germany

TWG-NPPIC I&C status in Germany

TWG-NPPIC Recommendations to IAEA Basis: List of recommendations of TWG-NPPCI Members to the IAEA to be considered in the 2008-2009 and 2010-2011 Activities Design, Qualification, and Application of Digital I&C Systems Modernization of I&C Systems and Components I&C HW and SW Life-Cycle Related Issues Human Factors and Reliability, MCR Design, HSI Improvement and Optimization of Equipment and System Performance I&C Knowledge Management and Transfer; Aging Workforce Utilizing Lessons Learned in Operation, Maintenance, and Modernization of I&C Licensing I&C Systems Emerging Technologies

TWG-NPPIC Signal validation based on modern equipment (c, e, i) Recommendations to IAEA Signal validation based on modern equipment (c, e, i) Complexity of I&C systems, equipment and software (a, h) Concentration of functions on single CPUs (h) Qualification and use of FPGA and similar “hard programmed” equipment (a, h) Electromagnetic Influence on I&C equipment by conducted and radiated disturbances (a, i)

TWG-NPPIC Control of CCF (a, h) Recommendations to IAEA Control of CCF (a, h) Cyber security (new activities in IEC/SC45A) (a, h, i) Use of I&C equipment not designed for use in NPPs in nuclear safety applications (a, h) Application of competing standards (nuclear vs. nonnuclear) in licensing procedures (a, h)

TWG-NPPIC Recommendations to IAEA