Buckner Road Interchange at I-65 Public Meeting

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

Fern Valley Interchange Public Hearing November 3, 2010.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
New I-65 Interchange at Worthsville Road Welcome!.
Environmental Assessment Public Meeting
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
VACO Conference Transportation Programs Update November 14, 2011 Gregory A. Whirley, Sr. Commissioner.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
RALPH COMER TENNESSEE DEPARTMENT of TRANSPORTATION January 19, 2010 THE ASSOCIATION OF GOVERNMENT ACCOUNTANTS TDOT's Approach to Economic Stimulus Funding:
TransLink’s role in supporting Cycling in Greater Vancouver ProWalk/ProBike 2004 Gavin Davidson, Program Manager, Bicycle Planning Greater Vancouver Transportation.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
STA Safety Project PID #76439 December 12, 2006.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
NORTH & SOUTH FULTON TRANSPORTATION VOTE November 8, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Improvements to Stockton Street
Secor Road Reconstruction Project Public Meeting #2
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Fordham at Columbia as a Grade-Separated Intersection
Transit Leadership Academy (MTTA)
Stanford Avenue/El Camino Real Intersection Improvements Project
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Pedestrian & Bicyclist Crash Analysis
Public Information Meeting NW 100th Street Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Metropolitan Planning Organization
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Derry-Londonderry I-93 Exit 4A Public Officials/Information Meeting/NHDOT Design-Build Public Hearing July 25, 2018.
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
NC RPO Meeting July 25, 2018.
Transportation Improvement Program and Air Quality Conformity Analysis
Double Crossover Diamond Interchange
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
2040 Long Range Transportation Plan Update
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
STP Shared Local Fund: Project Evaluation Criteria
Southern Georgia Regional Transportation Roundtable April 17, 2017
Josephine County TSP Update
Southern Bridge Project Brown County Executive
Meadow Lake Boulevard Street Extension Project
Regional Transportation Sales Tax Transportation Investment Act of 2010 and Transportation Funding Act of 2015 as of April 5, 2017.
Fordham at Columbia as a Grade-Separated Intersection
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Parks Highway Reconstruction: Lucas Road to Big Lake Road
U.S. 20 at State Road 2 New Interchange
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
I Street Bridge Replacement Project
New Hanover Comprehensive Plan
Presentation transcript:

Buckner Road Interchange at I-65 Public Meeting September 24, 2019

Meeting Purpose Progress Update Project History Project Overview Next Steps/Schedule Obtain Feedback and Answer Questions

Project History Project originally identified as a need in the City’s 2007 Major Thoroughfare Plan Identified as a need by the Nashville Area MPO City and County initiated an Interstate Access Request (IAR) study in early 2010’s Increased focus on obtaining IAR approval in 2016 IAR approved!

Project History BUILD Grant – Better Utilizing Investments to Leverage Development Former TIGER Grant program Projects eligible for up to $25 million from USDOT, with no more than $150 million awarded to a single state Intended for investments in surface transportation infrastructure May 2018 – Began Application Process July 2018 – Application submitted December 2018….

Project History

Project History Spring Hill awarded the maximum amount of $25 million One of only 12 projects in the entire U.S. to receive the maximum! Only project awarded in Tennessee City of Spring Hill Commitment Fund up to approximately $18 million of the total project Develop preliminary engineering plans and NEPA documentation Work with TDOT to complete the project by 2025

Project Overview

Project Overview New 4 – 6 lane roadway that will serve as an east/west connector between US 31, I- 65, and US 431 Includes new interchange at I-65 Includes sidewalk and multi-use path Median divided with turn lanes $50 million estimate Project Purpose and Need Improve connectivity/accessibility for Spring Hill residents Reduce congestion and delay times Encourage economic development

Project Overview

Project Overview

Project Overview Diverging Diamond Interchange (DDI) Why a DDI? Safety Fewer conflict points – nearly half vs. conventional interchange = fewer crashes Reduced severe crashes – conflicts between left turns and opposing through movement are eliminated Pedestrian and bicycle facilities crossing fewer lanes Operations Easy left and right turn lanes from all directions Higher capacity for left turn movements More efficient with high volumes of traffic Cost Less bridge structure Less right of way than some other types

Schedule City began preparation of Preliminary Design Plans and Environmental Study in February 2019 1 NEPA Studies and Preliminary Plans will be completed by January 2020 2 Project will be completed as Design-Build administered by TDOT 3 Anticipated Construction start - Summer 2022 4 September 2025 - project must be 100% complete - very accelerated schedule 5

Breakout Session 4 stations across the room, the rotunda, and the conference room Each station contains the same information Look at roll plots, ask questions, take leave behind, leave comment card Thank you for attending