Roscommon Watermain Replacement - TM Overview

Slides:



Advertisements
Similar presentations
Office of Traffic, Safety, and Operations Application Guidelines Miscellaneous Signs Signing Plan Design (At-Grade) June 20, 2012.
Advertisements

VISION & MISSION OF KeNHA VISION : Quality, safe and adequate National Road Network. MISSION : Provide quality National Road Network for sustainable social.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
LUAS CROSS CITY UTILITY WORKS Jim Kilfeather, Project Manager Gráinne Mackin, Director of Communications.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Triskett Road Rehabilitation Lorain Avenue to West 117 th Street March 18, 2014.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Project Management Richard Ravin NAU MBA Agenda  Background  Current Position Home Building Business  Project Management vs. Program Management.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Signs, Signals and Pavement Markings
Unit 2 Rules of the road TRAFFIC CONTROL DEVICES
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Westmeath County Water Conservation Project Stage 3 Watermains Rehabilitation Works Athlone Town February 2013.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Quick Clearance Michigan State Police 5 th District.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Office of Traffic, Safety and Technology Chapter 8 Maintenance of Signs Traffic Signs 101 November 20, 2014.
Madison Avenue Reconstruction Department of Planning and Development.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
Rules of the Road. I. Traffic Lights – must be obeyed unless a police officer directs otherwise.
Safety, Security, Service, and Emergency Plans GARY J. MONTECUOLLO CHIEF OF POL ICE JULY 21,2015.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test 16-Inch Saint Petersburg Lateral Pipeline From Polk City to Lakeland Polk County.
An Overview of Stakeholder Roles and Federal Legislation at Grade Crossings May 18, 2016 presentation to CPWA Saskatchewan Chapter, Saskatoon Railway Safety.
How to Sign A Trail Accurately
Middlebelt Transport and Storage Tunnel (MTST) Project
City of Charlottesville
Town of Brighton, Department of Public Works
Drive Right Chapter 2 Unit 1
College Algebra Chapter 6 Matrices and Determinants and Applications
District 3 Complete Streets Projects
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Ordnance survey Maps.
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test
Rules of the Road.
ROOSEVELT CITY GENERAL PLAN 2010
Dana Heiberg, Senior Planner February 5, 2018
Chapter 8 Maintenance of Signs
PROJ. 566(17) LOR PID MAJOR WIDENING
Outline Introduction Desecration of the project Soil Report
St. Coman’s Wood Primary School Roscommon RN016 STEP 3-Engineering
Signs, Signals, and Road Markings
NEIGHBOURHOOD TRAFFIC SCHEMES PRIORITIZATION METHOD
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Kilkenny County Council November 2018
Drive Right chapter 2 Thursday, June 27, 2019 lesson 2.1 TRAFFIC SIGNS
City of Spruce Grove Capital Region Partners Presentation 2019
Rules of the Road Chapter 10
Presentation transcript:

Roscommon Watermain Replacement - TM Overview NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Roscommon Watermain Replacement - TM Overview Farrans have been contracted by Irish Water to carry out mains rehabilitation throughout the North and North West Regions of Ireland. One of the areas highlighted for mains rehabilitation is Goff Street and Athlone Road, Church Street and Abbey Street Roscommon. This Project is scheduled to commence on the 8th July on Abbey Street. In order to complete the necessary mains replacement works for Abbey Street and Athlone Road, Roscommon we will need to temporarily use Two Way Traffic Lights and Road Closures with Diversions systems on Goff Street to facilitate these works. The following plans show the areas where works will be taking place and where the Traffic management systems will be used. All traffic management signage will be accordance with Chapter 8. Signs such as ‘Men at Work’ and advance warning distance markers are not shown on these plans for clarity but will be in place during the works. Local access and access for emergency vehicles will be accommodated at all times. Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan

Customer Care Overview Jane Elliott ( Farrans Stakeholder Liaison Officer ) - 087 2781346 Cathal Molloy ( Farrans Engineer ) - 087 3863209 Stephen Ellis ( Farrans Senior Engineer ) – 087 3861820 Roscommon Town Works Project

Goff St, Athlone Rd, Church St & Abbey St TM Overview NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Goff St, Athlone Rd, Church St & Abbey St TM Overview Extent of Mains Rehabilitation Works Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan

Goff St, Athlone Rd, Church St & Abbey St TM Overview NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Overall project will be completed in approx. 12 to 13 weeks Goff St, Athlone Rd, Church St & Abbey St TM Overview 2 3 5 1 4 Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan Road closures will be broken down into sections to maintain traffic flow where possible. Works area moved along in 100m sections with no through traffic. Local access maintained either side of the works.

Abbey St TM location 1 1 Two way traffic light system used NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Road 1 – Abbey Street is estimated to take up to 3 weeks to complete Abbey St TM location 1 1 Two way traffic light system used Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan

Church St TM Road Closure 2 NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Road 2 – Church Street is estimated to be completed in approx. 3 weeks Church St TM Road Closure 2 2 Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan Closed Section Diversion

Goff St TM Road Closure 3 + 4 - Primary Diversion NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Goff street will be completed in 2 separate sections with a Road Closure in place and diversion through Athlone Street Goff St TM Road Closure 3 + 4 - Primary Diversion Sign No access for HGVs Follow Diversion VMS located on N61 and N60 : Goff St Closed Follow Diversion Sign No access for HGVs Follow Diversion 3 4 Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan No through access on Goff St. Sign for HGVs to Follow Diversion Closed Section Diversion

Goff St TM Road Closure 3 - Secondary Diversion NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Road 3 Top half of Goff Street will take approx. 2 weeks with a Road Closure in place Goff St TM Road Closure 3 - Secondary Diversion One way Traffic on Church St 3 Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan One way Traffic on Church St while closure in place on Goff St. Closed Section Diversion

Goff Street Road TM Road Closure 4 - Secondary Diversion NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Road 4 Lower area of Goff Street will take approx. 2 weeks to complete Goff Street Road TM Road Closure 4 - Secondary Diversion 4 Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan Closed Section Diversion

Athlone Road TM Road Closure 5 NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Road 5 Athlone Road will take approx. 2 weeks to complete Athlone Road TM Road Closure 5 5 Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan Closed Section Diversion

Goff St, Athlone Rd, Church St - Closure Details NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Goff St, Athlone Rd, Church St - Closure Details Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan

Abbey St - TM Details Irish Water Network Management NOTES All signs will comply with Traffic Sign Regulations. All Traffic Management to be in accordance with Chapter 8. Abbey St - TM Details Farrans Construction Ltd 99 Kingsway, Dunmurry, BT17 9NU. Project: Irish Water Network Management Goff St, Roscommon TM Plan