Dominion Energy South Carolina: Solar Equipment Requirements

Slides:



Advertisements
Similar presentations
Solar PV On-Site Guide Solar PV On-Site Installers Guide.
Advertisements

Revenue Protection & Safety Field Safety. Safety First Section 1.5 Personal Protective Equipment.
Presentation : IMS – Tech Managers ConferenceAuthor : IMS StaffCreation date : 08 March 2012Classification : D3Conservation :Page : # 05 - Wiring Methods.
Electrical Installation
Solar Schoolhouse and San Mateo College Designing and Installing Solar Electric Systems Types of Solar Electric Systems For Technology Teachers San Mateo.
EET Survey of Electronics
Electrical Power Systems
The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.
EFFECTIVE JULY 6, 2015 Standard NEM Web Portal Overview.
1. Presentation Overview  Solar Industry Overview  Intro into Solar Photovoltaics  Types of PV Systems  Solar Product Offering –Solar Combiner Boxes.
Figure 1: The GT-1000 Solar PV Technology Panel
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
Panels and Subpanels. Main Service Panel aka Load Center The Load Center is the heart and soul of a home’s electrical system. It: – Serves as a distribution.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Topic 7 - Electricity in the Home Transmission of Electricity Power Grid Transformers are used to change the amount of voltage with hardly any energy loss.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
AmerenUE SHOW ME SOLAR June 15, 2010 MISSOURI NET METERING AND SOLAR REBATE PROGRAM Lisa Cosgrove – Renewables Specialist.
1 Air Conditioning Breaker Panels and Disconnects.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Electrical Plans.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
What is a circuit? A set of connected electrical components that provide one or more complete paths for the movement of charges. A set of connected electrical.
E4 HVACR Electrical Installation
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
Electrical Safety "Shocking Statistics“  There are approximately 290 accidental electrocutions each year.  An additional 800 people die in fires caused.
Residential Wiring Unit 3 – Installation and Planning.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Push Button Station and Relay
Electrical Circuits Section 7.3. Electrical Circuits Circuits rely on generators at power plants to produce a voltage difference across the outlet, causing.
Electrical Safety OSHE 382, Spring 2016
Solar PV Updates PDE Summit, December 2009
EV DOMESTIC CHARGING UNIT
E4 HVACR Electrical Installation
EV DOMESTIC CHARGING UNIT
Circuit Protection Unit 9.
E4 HVACR Electrical Installation
Electrical Systems Electrical Systems
SWITCHES W. C. “Buster” Hounshell Spring 2002.
One Line Diagram Example
[Project Name] One-Line Drawing
Indian Grid Code and Commissioning Test Procedure Dr
Associated Hazards and Safety Practices
Personal Protective Equipment
Conductors and Cables 2017 NEC
Engineering Project Cable Management.
Electrical Safety.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Calculations: Transformers and Service Conductor Calculations
Overcurrent Protection— Fuses and Circuit Breakers
The Safe Use of Electricity
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Safety Meeting Topics Standby Generator Safety
EUSERC DWG. 301 Project
Objectives Learn about Electricity Pricing Electric systems.
Meter removal and installation certification
Objectives Review conductor and conduit selection
SMART Program Specific Metering Wiring Diagrams May 2019
Electrical components and systems
Electrical components and systems
Electrical components and systems
Parker domnick hunter. Safety of Electrical and
Presented by: HJ Arnett Industries, LLC
Presentation transcript:

Dominion Energy South Carolina: Solar Equipment Requirements The purpose of this document is to assist installers with the installation process and reduce the amount of Meter Order Turndowns by providing supplemental material. This is not intended to be an installation guide.

Equipment Requirements and Inspection Checklist Table of Contents Equipment Requirements and Inspection Checklist AC Disconnect…………………………………………………………..3 Solar Panels………………………………………………………………4 Customer Generation Meter Socket………………………….5 Breaker Panels & Additional Disconnect Switches…….7 String Inverters………………………………………………………...8 Micro-Inverters……………………………………………………….10 Meter & Equipment Accessibility…………………………….11 Additional Information……………………………………..13

Equipment Requirements: AC Disconnect Switch Must be: Accessible to Dominion Energy South Carolina personnel. Installed in close and visible proximity (adjacent) to the main meter. Load break rated and shall provide a visible air gap and be lockable in the OFF position. Be sure that: The switch is in the OFF position prior to Meter Order Inspection. It successfully energizes the Customer Generation Meter socket when in the ON position. It successfully deenergizes Customer Generation Meter socket when in the OFF position.

Inspection Checklist ✓: Solar Panels Please be sure: The model and total number of panels installed correctly represent the number and model of panels submitted on the Single-Line Diagram (Note: Any changes made to the system after approval should be recorded in PowerClerk as a ‘PV System Update’).

Inspection Checklist ✓: Customer Generation Meter Socket Must be: A Ringless Meter Socket. Accessible to Dominion Energy South Carolina personnel. Installed in close and visible proximity to the main meter. Located immediately following the customer (load) side of the AC Disconnect Switch. Be sure that: The meter socket is deenergized when AC Disconnect Switch is in the ‘OFF’ position. The meter socket is energized when AC Disconnect Switch is in the ‘ON’ position. a. Ringed Meter Socket b. Ringless Meter Socket

Utility on Top. Additional Requirements: All wires entering meter socket must be terminated inside (including neutrals). Solar Generation must be wired to bottom lugs while utility must be connected to top lugs for customer to receive credit. Meter Socket must NOT be used as a “raceway” by conductors. Metered and Unmetered conductors must NOT share the same conduit. Solar Generation on Bottom.

Inspection Checklist ✓: Breaker Panels & Additional Disconnect Switches Be sure that: All breaker panels, fuses, combiner boxes, and additional disconnect switches (apart from the required main AC Disconnect Switch) are in the ON position if located in inaccessible locations (i.e. garages, indoors, etc.). Any additional Disconnect switches and fuses must NOT bypass the required AC Disconnect Switch.

Inspection Checklist ✓: String-Inverters Be sure that: Inverter model and size installed matches submitted Single-Line Diagram. If inverters are located indoors be sure to check the box labeled on the Single-Line Diagram. Inverters have been paired/initialized and are working properly prior to utility inspection. Note: Accessibility is NOT required for Inverters. however, Inverters that fail to pair/initialize will also fail Meter Order Inspection.

Inspection Checklist ✓: String-Inverters 1 6 2 3 5 4 Checklist: DC/AC Inverter(s) Customer Generation Meter Socket AC Disconnect Switch (Optional) Circuit Breaker/ Combiner Box House Meter Socket (Optional) Non-Utility Meter

Inspection Checklist ✓: Micro-Inverters 2 5 4 1 3 Checklist: AC Disconnect Switch (Optional) Circuit Breaker/Combiner box House Meter Socket (Optional) Non-Utility Meter Customer Generation Meter Socket *Micro-Inverters not shown as they are attached to PV Panels.

Inspection Checklist ✓: Metering Equipment Accessibility Be Aware: Dominion Energy South Carolina must have access to the main disconnect switch and metering equipment at all times, not only at the time of our Inspection and Meter Set. Meter(s) and main disconnect switch should be located in immediate proximity of main house meter. Meter(s)/Area must be accessible and made safe, not blocked by plants or gates. Pets/animals should be confined and away from the meter area. If current equipment location does not provide adequate access, please contact us at (800)251-7234 to coordinate relocating your equipment.

Inspection Checklist ✓: Metering Equipment Accessibility *Taken from Electric Service and Meter Installations manual (page 50). Note: Clearance and mounting height is safety requirement. Horizontal clearance of 3 feet is minimum requirement for obstructions in any direction. Meter mounting height for residential or commercial meters is 6’ maximum and 4’-6” minimum. Obstructions include, but not limited to trees, shrubs, HVAC units, walls or buildings Customer may be financially responsible for removal/relocation of any obstruction.

Additional Information: Resources: Solar For Your Home Solar Homeowners Guide Single-Line Diagram Template PowerClerk – Installer User Guide Electric Service and Meter Installation Manual Contact us: Renewable Energy: SCRenewableEnergy@DominionEnergySC.com